Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML21361A20920 December 2021Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML21307A19828 October 20212 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
IR 05000440/202000214 August 2020Integrated Inspection Report 05000440/2020002
ML13338A46022 January 2014Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies
ML14014A20914 January 2014Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Perry Nuclear Power Plant, Unit 1, TAC No.: MF0962 (Revision 1)
ML13008A04928 September 2012Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Cover Through Appendix a, Resumes and Qualifications, Page A-36
IR 05000440/201101113 May 2011IR 05000440-11-011, on 03/23/2011 - 04/29/2011, Perry Nuclear Power Plant, Temporary Instruction 2515/183 - Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event
IR 05000440/201100228 April 2011IR 05000440-11-002, on 01/01/2011 - 03/31/2011; Radiological Hazard Assessment and Exposure Controls
ML20203A52127 January 1999Safety Evaluation Accepting Licensee Calculations Showing That Adequate NPSH Will Be Available for HPCS Pumps
IR 05000440/199801419 August 1998Insp Rept 50-440/98-14 on 980620-24 & 0720-22.No Violations Noted.Major Areas Inspected:Licensee C/A for Issues Identified by NRC Inspections & Licensee Event Repts Submitted to NRC
ML20249A18911 June 1998SER on Moderate Energy Line Pipe Break Criteria for Perry Nuclear Power Plant,Unit 1 & Requests Addl Info to Demonstrate That Plant & FSAR in Compliance W/Staff Position & GDC as Discussed in SER
ML20153A93222 June 1988Notice of Issuance of Director'S Decision Under 10CFR2.206 Denying Ohio Citizens for Responsible Energy,Inc Petition for Immediate Action to Relieve Undue Risk Posed by Inadequate Seismic Design of Facility
ML20199G25030 June 1986Investigations of Confirmatory Seismological & Geological Issues,Northeastern Ohio Earthquake of 860131. W/Two Oversize Maps
ML20203D69817 April 1986Forwards Complete 860408 Statement of NRC Before Subcommittee on Energy & Environ of Committee on Interior & Insular Affairs,Us House of Representatives Re Earthquake. Related Correspondence
ML20205M0489 April 1986Forwards Testimonies Presented at 860408 Oversight Hearing Before Subcommittee on Energy & Environ,Per Aslab Consideration of Ocre Motion Re 860408 Earthquake. W/Certificate of Svc.Related Correspondence
ML20141P07831 March 1986Safety Evaluation Report Related to the Operation of Perry Nuclear Power Plant,Units 1 and 2.Docket Nos. 50-440 and 50-441.(Cleveland Electric Illuminating Company)
IR 05000440/198600517 March 1986Augmented Incident Response Team Insp Rept 50-440/86-05 on 860201-27.No Violation Identified.Major Areas Inspected: 860131 Earthquake & Effects of Quake on Plant
ML20212K44413 March 1986Forwards Sser 9 (NUREG-0887) Supporting Findings on Seismic Design After 860131 Earthquake,Congressman Mk Udall Requesting Testimony & Press Release Re 860408 Hearing Re Earthquake.Related Info Encl
ML20154G5535 March 1986Affidavit of Jh Lee Re Assertions Concerning Seismic Design of Plant Contained in Ocre 860203 Motion to Reopen. Earthquake Does Not Raise Significant Safety Question Concerning Operation of Plant or safety-related Equipment
ML20141M95625 February 1986Requests Denial of Ocre 860203 2.206 Petition to Prevent Fuel Loading or OL Issuance Until Assessment of 860131 Earthquake Complete.Encl Affidavits Confirm That Earthquake Did Not Adversely Affect Plant
ML20153G70025 February 1986Answer Opposing Ocre 860203 Motion to Reopen Record & Submit New Contention Based on 860131 Earthquake
ML20153G79024 February 1986Affidavit of C Chen Re Background Info on Seismic Design of Nuclear Power Plants & Development of Seismic Design for Facilities.Supporting Documentation Encl
ML20210C09619 February 1986Discusses 860131 Earthquake Near Plant.Facility Will Be Inspected for Structural Damage & Equipment Failure or Malfunction & Seismic Instrumentation Recordings & Util Findings Evaluated
ML20101M98414 December 1984Final Deficiency Rept (Rdc 116(84)) Re Use of Nonsafety Humidity Detectors in Control Complex HVAC Sys.Initially Reported on 841002.Procedures Modified to Require Operator to Inspect Humidification Sys