Start date | Site | Title | |
---|---|---|---|
05000282/FIN-2014005-04 | 31 December 2014 23:59:59 | Prairie Island | Licensee-Identified Violation |
05000306/FIN-2013011-02 | 31 March 2014 23:59:59 | Prairie Island | Outside Lift System (OlS) Girder Failure to Meet American Institute of Steel Construction (AISC) Requirements |
05000254/FIN-2013003-04 | 30 June 2013 23:59:59 | Quad Cities | Question Concerning Availability of Dam Following a Seismic Event |
05000456/FIN-2013002-06 | 31 March 2013 23:59:59 | Braidwood | Current Licensing Basis Requirements for RCS Pressure Control Function During a Postulated Seismic Event in Reference to NRC RSB BTP 5-1 |
05000266/FIN-2012004-09 | 30 September 2012 23:59:59 | Point Beach | FAILURE TO PERFORM ADEQUATE EVALUATIONS TO ENSURE COMPLIANCE WITH 10 CFR 72.212(b)(6) AND 10 CFR 72.122(b)(2)(i) |
05000341/FIN-2011003-03 | 30 June 2011 23:59:59 | Fermi | Methodology Used in the HI-STORM/HI-TRAC Stack-up and Evaluation May Be Inadequate |
05000373/FIN-2010006-01 | 31 March 2011 23:59:59 | LaSalle | Supporting Structure for Standby Liquid Control System Test Tank Non-Functional During Postulated Design Basis Earthquake (DBE) |
05000275/FIN-2011002-03 | 31 March 2011 23:59:59 | Diablo Canyon | Requirement to Perform an Operability Evaluation Following Receipt of New Seismic Information |
05000237/FIN-2010007-04 | 30 June 2010 23:59:59 | Dresden | Licensee-Identified Violation |
05000361/FIN-2010002-06 | 31 March 2010 23:59:59 | San Onofre | Failure to Perform an Adequate Postmaintenance Test |
05000282/FIN-2010008-01 | 31 March 2010 23:59:59 | Prairie Island | Failure to Determine the Minimum Cooling Water System Flow Required After a Design Basis Earthquake |
05000275/FIN-2009005-04 | 31 December 2009 23:59:59 | Diablo Canyon | Less than Adequate Replacement Reactor Head Modification Design Control |
05000528/FIN-2009008-02 | 30 September 2009 23:59:59 | Palo Verde | Failure to Perform an Adequate Operability Evaluation for the Condensate Storage Tank |
05000331/FIN-2009004-01 | 30 September 2009 23:59:59 | Duane Arnold | Failure to Perform an Immediate Operability Determination for the B Standby Diesel Generator |
05000305/FIN-2009002-06 | 31 March 2009 23:59:59 | Kewaunee | Seismic Monitoring System Repeatedly Fails Surveillance |