Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
IR 05000400/2022006 | 1 March 2023 | Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2022006 |
ML22271A620 | 29 September 2022 | Notification of Shearon Harris Nuclear Power Plant Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000400/2023010 |
IR 05000400/2022005 | 24 August 2022 | Updated Inspection Plan for Shearon Harris Nuclear Power Plant (Report 05000400/2022005) |
IR 05000400/2022001 | 4 May 2022 | Integrated Inspection Report 05000400/2022001 |
ML20147A040 | 15 May 2020 | Amendment 63 to Updated Final Safety Analysis Report, Administrative Procedure Non-Safety Related PLP-106 Technical Specification Equipment List Program, Revision 073 (Redacted) |
RA-19-0115, Transmittal of the Duke Energy Corporation Topic Report (Duke QAPD-001-A), Amendment 44 | 18 February 2019 | Transmittal of the Duke Energy Corporation Topic Report (Duke QAPD-001-A), Amendment 44 |
ML18338A088 | 4 December 2018 | Attachment FormerFAQResponses_11302018 |
RA-18-0004, Duke Energy Transmittal of Topical Report DUKE-QAPD-001-A, Amendment 43 | 13 August 2018 | Duke Energy Transmittal of Topical Report DUKE-QAPD-001-A, Amendment 43 |
RA-17-0025, Transmittal of the Duke Energy Corporation Topical Report (Duke-QAPD-001-A), Amendment 42 | 22 May 2017 | Transmittal of the Duke Energy Corporation Topical Report (Duke-QAPD-001-A), Amendment 42 |
IR 05000400/2016004 | 27 January 2017 | NRC Integrated Inspection Report 05000400/2016004 |
IR 05000400/2013002 | 30 April 2013 | IR 05000400-13-002: Carolina Power and Light Company; on January 1, 2013 - March 31, 2013; Shearon Harris Nuclear Power Plant, Unit 1; Operability Evaluations, Plant Modifications, and Event Follow-up |
ML040220344 | 21 January 2004 | Notification of Harris Nuclear Plant - Plant Design - Pilot Inspection |
ML18016A711 | 9 November 1998 | Forwards 120-day Response to GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment. |
ML18011A681 | 14 November 1994 | Rept in Accordance w/10CFR50.59 for Period 930201-940711, Including Harris Plant Refueling Outage |
ML18009A599 | 6 July 1990 | Comments on Electrical Distribution Sys Functional Insp Rept 50-400/90-200 on 900212-0316.Seismic Qualification Package Subsequently Upgraded to Include Qualification Info Based on Receipt of Part 21 from Transamerica Delaval |
Information Notice 1989-45, Metalclad, Low-Voltage Power Circuit Breakers Refurbished with Substandard Parts | 8 May 1989 | Metalclad, Low-Voltage Power Circuit Breakers Refurbished with Substandard Parts |
ML18005A364 | 18 February 1988 | Rev 4 to Technical Support Mgt Manual TMM-104, Determination of Technical & QA Requirements for Procurement Document. |