ML20215B79011 June 1987Portland General Electric
Cockfield D
Forwards Evaluation Rept of Main Steam Pipe Wall Thickness, Describing Fatigue & Finite Element Analyses Performed on Affected Piping,Per ASME Boiler & Pressure Vessel Code.Affected Piping Will Be Reexamined in 1988Other
ML20215G65311 June 1987BECHTEL GROUP
INC.
Trojan Nuclear Plant Evaluation of Main Feed Line Seismic Restraint FailureOther
ML20215G10112 June 1987Portland General Electric
Cockfield D
Forwards Evaluation of Displacement at Main Feedwater Restraint SR4 in Trojan Nuclear Plant & Trojan Nuclear Plant Evaluation of Main Feed Line Seismic Restraint Failure, as Result of Failure During 1987 Refueling OutageOther
ML20215B80430 June 1987BECHTEL POWER CORP.
Bostrom T
Chern C
Evaluation Rept of Trojan Nuclear Plant Main Steam Pipe Wall ThicknessOther
ML20215G65030 June 1987BECHTEL GROUP
INC.
Evaluation of Displacement at Main Feedwater Restraint SR4 in Trojan Nuclear PlantOther
ML20234D07730 June 1987Portland General Electric
Cockfield D
Advises That Util Agrees to Complete One of Three Listed Actions Re Resolution of Main Steam Line Wall Thickness Issue Before Startup from 1989 Refueling OutageOther
ML20236F15317 July 1987BECHTEL GROUP
INC.
Lanssen K
Safwat H
Final Rept Trojan Nuclear Plant SR8 Failure Root Cause Evaluation Steam Condensation-Induced Water HammerOther
ML20236F14527 July 1987Portland General Electric
Cockfield D
Forwards Bechtel Western Power Corp Final Rept, Trojan Nuclear Plant SR8 Failure Root Cause Evaluation Steam Condensation-Induced Water Hammer & Impell Corp Summary Rept, Independent Review of Action Plan Items..Other
ML20236D57027 July 1987Portland General Electric
Cockfield D
Advises That Util Plans to Resolve Issue Re Code Acceptability Applications Prior to 871201.Util Will Perform Necessary Design & Order Matls to Repair or Replace Unacceptable Main Steam Line Wall Thickness AreasOther
IR 05000344/198702627 July 1987NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Yuhas G
Hooker C
Insp Rept 50-344/87-26 on 870706-10.No Violations or Deviations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,External & Internal Exposure Control, Control of Radioactive Matls & Contamination & ALARARequest
ML20236L34530 July 1987Chan T
Office of Nuclear Reactor Regulation
Summary of 870617 Meeting W/Util,Bechtel & Impell Re Results of Analyses Concerning Accumulator Fill Line Failure,Main Feedwater Failure & Main Steam Line Thin Wall at Plant.List of Attendees & Viewgraphs EnclMeeting
ML20236F16831 July 1987ABB IMPELL CORP. (FORMERLY IMPELL CORP.)Rev 1 to Summary Rept, Independent Review of Action Plan Items to Resolve Trojan Main Feedwater Piping Restraint Failure IssueOther
ML20237J05221 August 1987Chan T
Office of Nuclear Reactor Regulation
Responds to Util Proposing to Resolve Issue Re Main Steam Line Wall Thicknesses Which Did Not Meet Min Requirements.Util Adequately Demonstrated That Safe Operation of Plant Until May 1989 Will Not Be CompromisedOther
ML20237J21521 August 1987Office of Nuclear Reactor Regulation
Knighton G
Advises That Technical Issues Re Accumulator Fill Line Failure & Main Feedwater Pipe Restraint Failure Adequately Addressed by Licensee.Summary of 870617 Meeting Encl.W/O EnclMeeting
ML20236M83711 November 1987Chan T
Office of Nuclear Reactor Regulation
Forwards SERs Re Main Feedwater Line Restraint Failure & Accumulator Fill Line Failures at Plant.Repairs Proposed by Util Acceptable to Ensure Integrity of Damaged Sys for Continuing Plant OperationApproval
ML20236M85511 November 1987Office of Nuclear Reactor RegulationSER Supporting Util Repairs Proposal Re Main Feedwater Line Restraint FailureOther
ML20236M87111 November 1987Office of Nuclear Reactor RegulationSER Supporting Util Repairs Proposal Re Accumulator Fill Line FailuresOther
ML20151L87815 April 1988Portland General Electric
Cockfield D
Forwards Addl Info Re Six Open Items/Recommendations Noted in NRC 871111 Safety Evaluation of Failure of Main Feedwater Sys Restraint SR-8,per Commitment During Audit of long-term Pipe Support Design Verification Program in Jan 1988Other