Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
ML20203G553 | 23 July 1986 | Office of Nuclear Reactor Regulation Miner S | Notification of 860814 Meeting W/Util in Bethesda,Md to Discuss Action Plan for Performance Improvement | Meeting |
ML20197C699 | 25 July 1986 | Ford B SACRAMENTO MUNICIPAL UTILITY DISTRICT Johnson P Spencer B | Preliminary Deterministic Failure Consequence Analysis for Non-Nuclear Instrumentation (Nni) & Integrated Control Sys (ICS) Power Supply Failure | Other |
ML20197C704 | 25 August 1986 | William Ford SACRAMENTO MUNICIPAL UTILITY DISTRICT | Preliminary Suppl 1 to Deterministic Failure Consequence (Dfc) Analysis for Non-Nuclear Instrumentation (Nni) & Integrated Control Sys (ICS) Power Supply Failures:Loss of Nni X or Y/Ics AC Power (Auto-Bus Transfer-ABI-Failure) | Other |
ML20197C721 | 19 September 1986 | SACRAMENTO MUNICIPAL UTILITY DISTRICT Bernard Thomas Naleway J | Preliminary Rev 1 to Control Room/Technical Support Ctr Essential Air Conditioning Sys Status Rept | Other |
ML20211C133 | 9 October 1986 | Office of Nuclear Reactor Regulation Miner S | Summary of 860814 Meeting W/Util,B&W,American Nuclear Insurers & Lrs,Inc in Bethesda,Md Re Detailed Aspects of Action Plan for Performance Improvement at Plant.Viewgraphs Encl | Meeting |
ML20215K603 | 16 October 1986 | Miraglia F Office of Nuclear Reactor Regulation | Submits Results of Survey on Engineering Expertise on Shift. Findings of Survey Include That Plants Utilize Shift Technical Advisors That Are on-call & That Differences from Commission Policy Statement Handled on case-specific Basis | Other |
ML20197C712 | 30 October 1986 | SACRAMENTO MUNICIPAL UTILITY DISTRICT Corklin B Grod P Underwood E | Preliminary Rept of Deterministic Failure Consequence Analysis for Instrument Air Sys. Draft Preliminary Instrument & Svc Air Sys Status Rept Encl | Draft Other |
ML20197C682 | 30 October 1986 | SACRAMENTO MUNICIPAL UTILITY DISTRICT Julie Ward | Forwards Response to 860530 Request for Addl Info Necessary for Preparation of SER Supporting Plant Restart. Instrumentation & Control Sys & non-nuclear Instrumentation Schematic Drawings Will Be Sent Separately | Request |
ML20206K588 | 10 April 1987 | Office of Nuclear Reactor Regulation Colburn T | Forwards SER Accepting Util 860513 Proposed Replacement of Hydraulic Snubbers W/Energy Absorbers for Seismic Support of Certain safety-related Piping | Approval |