Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
ML20137P712 | 29 January 1986 | MISSISSIPPI POWER & LIGHT CO. | Proposed Tech Spec Changes to Reflect Design Change in Progress to Complete Installation of Drywell Chilling Water Sys | Other |
ML20137P693 | 29 January 1986 | Kingsley O MISSISSIPPI POWER & LIGHT CO. | Application for Amend to License NPF-29,revising Tech Specs to Reflect Design Changes in Progress to Complete Installation of Drywell Chilling Water Sys | Request |
AECM-86-0023, Forwards Application for Amend to License NPF-29,revising Tech Specs to Reflect Design Change in Progress to Complete Installation of Drywell Chilling Water Sys.Fee Paid | 29 January 1986 | Kingsley O MISSISSIPPI POWER & LIGHT CO. | Forwards Application for Amend to License NPF-29,revising Tech Specs to Reflect Design Change in Progress to Complete Installation of Drywell Chilling Water Sys.Fee Paid | Request |
ML20203D679 | 14 April 1986 | MISSISSIPPI POWER & LIGHT CO. | Proposed Tech Specs Re Design Changes to Scram Discharge Vol & post-LOCA Vacuum Breakers | Other |
ML20197H554 | 12 May 1986 | MISSISSIPPI POWER & LIGHT CO. | Proposed Tech Specs,Reflecting Changes in Computational Model & Make RCIC Steam Line flow-high Actuation Instrumentation Valves Consistent w/as-built Plant | Other |
AECM-86-0131, Application for Amend to License NPF-29,revising Tech Specs to Reflect Change in Computational Model & Make RCIC Steam Line flow-high Actuation Instrumentation Valves Consistent w/as-built Plant.Fee Paid | 12 May 1986 | Kingsley O MISSISSIPPI POWER & LIGHT CO. | Application for Amend to License NPF-29,revising Tech Specs to Reflect Change in Computational Model & Make RCIC Steam Line flow-high Actuation Instrumentation Valves Consistent w/as-built Plant.Fee Paid | Request |
ML20199E911 | 13 June 1986 | MISSISSIPPI POWER & LIGHT CO. | Proposed Changes to Tech Specs 3.5.1 & 4.5.1,revising Automatic Depressurization sys-related Air Sys Per Prior Commitments to Add Extrapolated Pressure Decay Test & Instrument Quality Test | Request |
AECM-86-0188, Application for Amend to License NPF-29,revising Tech Spec 4.5.1 to Change Automatic Depressurization sys-related Air Sys,Per Prior Commitments to Add Extrapolated Pressure Decay Test & Instrument Air Quality Test.Fee Paid | 13 June 1986 | Kingsley O MISSISSIPPI POWER & LIGHT CO. | Application for Amend to License NPF-29,revising Tech Spec 4.5.1 to Change Automatic Depressurization sys-related Air Sys,Per Prior Commitments to Add Extrapolated Pressure Decay Test & Instrument Air Quality Test.Fee Paid | Request |
ML20207G520 | 16 July 1986 | MISSISSIPPI POWER & LIGHT CO. | Proposed Tech Specs Combining Drywell Vacuum Relief Requirements w/post-LOCA & Combustible Gas Purge Sys Into One Tech Spec | Other |
AECM-86-0225, Application for Amend to License NPF-29,combining Drywell Vacuum Relief Requirements for post-LOCA & Combustible Gas Purge Sys Into One Tech Spec.Fee Paid | 16 July 1986 | Kingsley O MISSISSIPPI POWER & LIGHT CO. | Application for Amend to License NPF-29,combining Drywell Vacuum Relief Requirements for post-LOCA & Combustible Gas Purge Sys Into One Tech Spec.Fee Paid | Request |
ML20212P470 | 26 August 1986 | MISSISSIPPI POWER & LIGHT CO. | Proposed Tech Specs Allowing Entry Into Operational Conditions 1 & 2 W/O Performing Surveillance Requirement 4.1.3.1.4.a for Scram Discharge Vol Vents Provided Test Performed at Least Every 18 Months | Other |
ML20212P464 | 26 August 1986 | Kingsley O MISSISSIPPI POWER & LIGHT CO. | Revised Application for Amend to License NPF-29,allowing Entry Into Operational Conditions 1 & 2 W/O Performing Surveillance Requirement 4.1.3.1.4.a for Scram Discharge Vol Vents Provided Test Performed at Least Every 18 Months | Request |
AECM-86-0238, Forwards Revised Application for Amend to License NPF-29, Allowing Entry Into Operational Conditions 1 & 2 W/O Performing Surveillance Requirement 4.1.3.1.4.a Provided Test Performed at Least Every 18 Months | 26 August 1986 | Kingsley O MISSISSIPPI POWER & LIGHT CO. | Forwards Revised Application for Amend to License NPF-29, Allowing Entry Into Operational Conditions 1 & 2 W/O Performing Surveillance Requirement 4.1.3.1.4.a Provided Test Performed at Least Every 18 Months | Request |
AECM-86-0308, Notifies That Page 3/4 3-71 from Amend 19 to Tech Specs Re Remote Shutdown Sys Controls Effective 860930,per Request. Installation of Isolation Switches Will Be Completed During First Refueling Outage | 1 October 1986 | Kingsley O MISSISSIPPI POWER & LIGHT CO. | Notifies That Page 3/4 3-71 from Amend 19 to Tech Specs Re Remote Shutdown Sys Controls Effective 860930,per Request. Installation of Isolation Switches Will Be Completed During First Refueling Outage | Other |