05000369/LER-1984-029, Forwards LER 84-029-00 Re High Concentration of Nitrogen in Upper Head Injection (Uhi).Rept Re Improperly Installed Uhi Level Instrumentation Scheduled to Be Submitted by 84120729 November 1984Duke Energy
Tucker H
Forwards LER 84-029-00 Re High Concentration of Nitrogen in Upper Head Injection (Uhi).Rept Re Improperly Installed Uhi Level Instrumentation Scheduled to Be Submitted by 841207Other
05000369/LER-1984-030, Suppl to LER 84-030:review Revealed Installation Error That Would Result in Failure of Upper Head Injection Accumulator Discharge Valves to Isolate on Low Level.Analysis of Safety Significance & Encl19 December 1984Duke Energy
Tucker H
Suppl to LER 84-030:review Revealed Installation Error That Would Result in Failure of Upper Head Injection Accumulator Discharge Valves to Isolate on Low Level.Analysis of Safety Significance & EnclOther
ML20112G10720 December 1984Duke Energy
Tucker H
Forwards Evaluations of Complete Draindown of Upper Head Injection Sys Water Accumulator & Poor Performance of Kerotest Valves for Compliance W/Tech Spec 4.5.1.2c.Channel Calibr Overlapping Surveillance Satisfies Tech SpecsOther
ML20126M29524 July 1985Novak T
Office of Nuclear Reactor Regulation
Advises That Addl Info Needed for Plants W/Upper Head Injection (Uhi) Sys to Assess Likelihood of Loss of Uhi auto-isolation Capability.Info Re Demand & Failure Frequencies of Isolation Function Requested within 30 DaysOther
ML20136D33023 December 1985Duke Energy
Tucker H
Forwards Response to NRC 851104 Request for Addl Info Re Radiological Aspects of upper-head Injection Removal & Radiological Impacts on Plant Operations.Final Decision Re Disposal Method Expected by Late Jan 1986Request
ML20140A53917 March 1986Duke Energy
Tucker H
Provides Addl Info Re License Amend Request Concerning upper-head Injection Sys.Bash Large Break LOCA Analyses Replaced w/NRC-approved Bart Analyses.Info from Listed Submittals Still Valid Unless NotedOther
NRC-86-3112, Forwards Results of Bart Evaluation Model Large Break LOCA 10CFR50.46 Analysis,Demonstrating Acceptability of upper-head Injection Removal in Support of License Amend. Info Re Sys Behavior W/ & W/O upper-head Injection Encl18 March 1986GENERAL ELECTRIC CO.
Rahe E
Forwards Results of Bart Evaluation Model Large Break LOCA 10CFR50.46 Analysis,Demonstrating Acceptability of upper-head Injection Removal in Support of License Amend. Info Re Sys Behavior W/ & W/O upper-head Injection EnclOther
ML20202E8748 April 1986Duke Energy
Tucker H
Forwards Addl Info Re Radwaste Expected to Be Generated During upper-head Injection Removal,Per NRC 860407 TelconOther
ML20203C63717 April 1986Duke Energy
Tucker H
Responds to 860416 Request for Addl Info Re Planned Elimination of Upper Head Injection Sys.Containment Penetration Capping Will Be Performed Per Applicable Codes & Stds & Design RequirementsRequest