Semantic search

Jump to navigation Jump to search
 Issue dateFromTitleProject stage
ML20076A98727 April 1979NORTHEAST UTILITIES
Counsil W
Forwards Proposed Revision to Tech Specs to Allow Unlimited Containment Purges.Revisions Deal W/Containment Isolation ValvesOther
A03035, Forwards Response to NRC Request for Addl Info Re Operability of 6-inch Butterfly Containment Purge & Vent Valves.Based on Analyses,Adequate Justification Does Not Exist to Warrant Mods to Equipment28 March 1983Counsil W
Northeast Nuclear Energy
Forwards Response to NRC Request for Addl Info Re Operability of 6-inch Butterfly Containment Purge & Vent Valves.Based on Analyses,Adequate Justification Does Not Exist to Warrant Mods to EquipmentRequest
A03501, Requests Addl Time to Provide Info Re 6-inch Containment Purge & Vent Valve Operability.Info Will Be Provided by 83102612 October 1983NORTHEAST UTILITIES
Counsil W
Northeast Nuclear Energy
Requests Addl Time to Provide Info Re 6-inch Containment Purge & Vent Valve Operability.Info Will Be Provided by 831026Other
ML20078N84727 October 1983NORTHEAST UTILITIES
Counsil W
Northeast Nuclear Energy
Forwards Response to NRC 830902 Comments on Unresolved Items Re Containment Purge/Vent Review.No Addl Tech Specs or Equipment Mods Warranted.Operability Requirement Met W/Compliance W/Tmi Item II.E.4.2Other
A03992, Requests Informal Appeal Meeting W/Nrc to Review Requested Mod of Hydrogen Purge Valves to Close on High Radiation Signal,Per Generic Ltr 84-08 & NUREG-0737,Item II.E.4.2.715 May 1984NORTHEAST UTILITIES
Counsil W
Northeast Nuclear Energy
Requests Informal Appeal Meeting W/Nrc to Review Requested Mod of Hydrogen Purge Valves to Close on High Radiation Signal,Per Generic Ltr 84-08 & NUREG-0737,Item II.E.4.2.7Meeting
A04104, Forwards Overview Re Appeal for Requested Mod of Hydrogen Purge Sys Valves to Close on Radiation Signal,Per Generic Ltr 84-08 & NUREG-0737,Item II.E.4.2.7, Containment Venting at Power. Addl Info Re Leakage Testing Expected by 84073011 July 1984NORTHEAST UTILITIES
Counsil W
Northeast Nuclear Energy
Forwards Overview Re Appeal for Requested Mod of Hydrogen Purge Sys Valves to Close on Radiation Signal,Per Generic Ltr 84-08 & NUREG-0737,Item II.E.4.2.7, Containment Venting at Power. Addl Info Re Leakage Testing Expected by 840730Other
B11269, Forwards Figure 3.1,per Re NUREG-0737,Item II.E.4.2.7, Containment Venting at Power, Providing Justification That Isolation Logic for Hydrogen Purge Valves Adequate13 July 1984NORTHEAST UTILITIES
Counsil W
Sears C
Northeast Nuclear Energy
Forwards Figure 3.1,per Re NUREG-0737,Item II.E.4.2.7, Containment Venting at Power, Providing Justification That Isolation Logic for Hydrogen Purge Valves AdequateOther
ML20133E7073 October 1985Butcher E
Office of Nuclear Reactor Regulation
Forwards Structural & Geotechnical Engineering Branch Request for Addl Info to Complete Review of 850724 Application to Modify Tech Specs Re Spent Fuel Storage Capacity ExpansionRAI
B11777, Forwards Response to Request for Addl Info Re 850724 Application to Revise Tech Specs on Spent Fuel Storage Capacity17 October 1985Opeka J
NORTHEAST UTILITIES
Mroczka E
Northeast Nuclear Energy
Forwards Response to Request for Addl Info Re 850724 Application to Revise Tech Specs on Spent Fuel Storage CapacityRequest
ML20134A59929 October 1985Butcher E
Office of Nuclear Reactor Regulation
Notice of Consideration of Issuance of Amend to License DPR-65 & Proposed NSHC Determination & Opportunity for Hearing.Amend Authorizes Licensee to Increase Spent Fuel Pool Storage Capacity from 667 to 1,112 Storage LocationsOther
ML20134A58729 October 1985Office of Nuclear Reactor Regulation
Osborne D
Forwards Notice of Consideration of Issuance of Amend to License DPR-65 & Proposed NSHC Determination & Opportunity for Hearing Re 850724 Application to Expand Spent Fuel Pool Storage CapacityOther
B11766, Submits Isap Topic 1.11, Post-Accident Hydrogen Monitor Per 850517 Commitment.Installation of Redundant Containment Hydrogen Monitor Unnecessary.Addl Info Will Be Provided by 86013125 November 1985Opeka J
NORTHEAST UTILITIES
Northeast Nuclear Energy
Submits Isap Topic 1.11, Post-Accident Hydrogen Monitor Per 850517 Commitment.Installation of Redundant Containment Hydrogen Monitor Unnecessary.Addl Info Will Be Provided by 860131Request
B11889, Forwards Confirmation of Resolution to Request for Addl Info Re Application for Increased Spent Fuel Storage Capacity Based on Series of Telcons25 November 1985Opeka J
NORTHEAST UTILITIES
Northeast Nuclear Energy
Forwards Confirmation of Resolution to Request for Addl Info Re Application for Increased Spent Fuel Storage Capacity Based on Series of TelconsRequest
B11893, Forwards Review of Spent Fuel Storage Capacity Expansion Request,Containing Proposed Mod to Tech Spec Re Decay Time Requirement,In Response to NRC 850826 Request for Addl Info27 November 1985Opeka J
Sears C
Northeast Nuclear Energy
Forwards Review of Spent Fuel Storage Capacity Expansion Request,Containing Proposed Mod to Tech Spec Re Decay Time Requirement,In Response to NRC 850826 Request for Addl InfoRequest
B11910, Responds to Request for Addl Info Re Spent Fuel Storage Capacity.Analysis Showing That Adjacent Modules Do Not Contact During Seismic Event Inadvertently Omitted from3 December 1985Opeka J
NORTHEAST UTILITIES
Mroczka E
Northeast Nuclear Energy
Responds to Request for Addl Info Re Spent Fuel Storage Capacity.Analysis Showing That Adjacent Modules Do Not Contact During Seismic Event Inadvertently Omitted fromRequest
ML20137B43216 December 1985Thadani A
Office of Nuclear Reactor Regulation
Notice of Environ Assessment & Finding of No Significant Impact Re Issuance of Amend to License DPR-65,changing Tech Specs to Increase Storage Capacity of Spent Fuel PoolApproval
ML20137B42316 December 1985Thadani A
Office of Nuclear Reactor Regulation
Forwards Environ Assessment & Finding of No Significant Impact Re 850724 Request for Amend to License DPR-65 Concerning Spent Fuel Pool ExpansionOther
ML20137B44216 December 1985Thadani A
Office of Nuclear Reactor Regulation
Environ Assessment & Finding of No Significant Impact Supporting Amend to License DPR-65,authorizing Increase of Spent Fuel Pool Storage CapacityOther
ML20137A49031 December 1985Opeka J
NORTHEAST UTILITIES
Northeast Nuclear Energy
Forwards Addl Info Demonstrating Compliance w/NUREG-0737, Item II.E.4.2.7 Re Containment Venting Through Hydrogen Purge Valves,Per 840425,0902 & 1211 RequestsOther