 Issue dateFromTitleProject stage
ML20205H9846 July 1976Lear G
Office of Nuclear Reactor Regulation
Forwards Draft Amends 18 & 23 to Licenses DPR-24 & DPR-27, Respectively, & Safety Evaluation.Amends Revise Tech Specs to Add Surveillance Requirements & Place Limit on Max Weight of Spent Fuel Shipping Cask UsedDraft Approval
ML20041C73525 February 1982Fay C
WEC Energy Group
Forwards Tentative Schedule for Submittal of 6-month & 9-month Repts on Outstanding Response Items Concerning NUREG-0612 Re Control of Heavy Loads,Per NRC 820201 RequestRequest
ML20054G62216 June 1982WEC Energy Group
Fay A
Forwards Response to NRC Question Attachment 1-5 Re Interfacing Lift Point Evaluation.Info Provided as Revised Pages to 9-month Response to NUREG-0612, Control of Heavy LoadsOther
ML20054L09830 June 1982Fay C
WEC Energy Group
Submits Addl Info for Draft Technical Evaluation Rept on Util Response to NUREG-0612, Control of Heavy Loads, Per 820520 TelconDraft Other
ML20069D59316 September 1982Fay C
WEC Energy Group
Forwards Response to NRC Question Attachment 1-1 Re Manufacturer Design Info on Single Failure Proof Cranes & Revised Response to NRC Attachment 1-5 Concerning Interfacing Lift Point EvaluationOther
ML20065S12922 October 1982Fay C
WEC Energy Group
Requests Expeditious Review & Approval of Revision 3 to Ederer,Inc Generic Rept EDR-1, Nuclear Safety-Related Extra-Safety & Monitoring (X-SAM) Cranes to Assist in Completing Auxiliary Bldg Crane Upgrade in Timely MannerOther
ML20066K06422 November 1982Fay C
WEC Energy Group
Forwards Revised Pages 10,11 & 11a to Response to NRC Question 2.3-4-b Re Control of Heavy Loads,Including Results of Reactor Pressure Vessel Head Drop Analysis.Info Should Be Included in 9-month ResponseOther
ML20072K82017 June 1983FRANKLIN INSTITUTE
Ahmed N
Bomberger C
Control of Heavy Loads (C-10),Point Beach Nuclear Plants Units 1 & 2, Draft Final Technical Evaluation ReptDraft Other
ML20080M92328 September 1983Fay C
WEC Energy Group
Forwards Addl Info Requested in 830810 Telcon Re Franklin Research Ctr 830617 Draft Technical Evaluation Rept on Util Response to Phase 1 of NUREG-0612, Control of Heavy Loads at Nuclear Power PlantsDraft Other
ML20086T8822 March 1984FRANKLIN INSTITUTE
Bomberger C
Sargent I
Control of Heavy Loads (C-10) Wisconsin Electric Power Co Point Beach Nuclear Plant Units 1 & 2Other