Entered date | Event description | |
---|---|---|
ENS 55000 | 16 November 2020 12:13:00 | During normal plant start up on Limerick Unit 1, reactor pressure was raised above 200 psig prior to unisolating the Unit 1 high pressure coolant injection system (HPCI) which remained inoperable. Per TS 3.5.1, HPCI is required to be operable in Mode 2 above 200 psig. HPCI has since been restored to operable. The NRC Resident Inspector has been notified. |
ENS 53108 | 8 December 2017 17:25:00 | U/2 HPCI (Unit 2/High Pressure Coolant Injection) was declared inoperable due to leak by of the pump discharge check valve after pump shutdown from flow testing. This resulted in cycling of the minimum flow valve. The discharge valve was closed to prevent the continued cycling of the minimum flow valve. This condition was identified during normal surveillance testing. The licensee notified the NRC Resident Inspector. |