 Issue dateTitleTopic
JAFP-08-0133, 10 CFR 50.46 Annual Report - Errors in Emergency Core Cooling System (ECCS) Evaluation Models22 December 200810 CFR 50.46 Annual Report - Errors in Emergency Core Cooling System (ECCS) Evaluation Models
IR 05000333/200800717 December 2008IR 05000333-08-007, on 11/20/2008, James A. FitzPatrick Nuclear Power Plant, Temporary Instruction 2515/171, Verification of Site Specific Implementation of B.5.b Phase 2 & 3 Mitigating Strategies. - Letter OnlyB.5.b Mitigating Strategies
ML08359033817 December 2008James A. FitzPatrick Nuclear Power Plant - Submittal of the Stress Analysis Summary for the N2C-SE Weld OverlayWeld Overlay
Finite Element Analysis
Dissimilar Metal Weld
JAFP-08-0131, James A. FitzPatrick Nuclear Power Plant - Submittal of the Stress Analysis Summary for the N2C-SE Weld Overlay17 December 2008James A. FitzPatrick Nuclear Power Plant - Submittal of the Stress Analysis Summary for the N2C-SE Weld OverlayWeld Overlay
Finite Element Analysis
Dissimilar Metal Weld
ML08353045212 December 2008the State of New York, V USNRC and Entergy Nuclear Operations Inc; 08-3903-ag(L)/08-4833-ag(CON) - Motion Out of Time
IR 05000333/20084035 December 2008IR 05000333-08-403, on 11/03/2008 - 11/07/2008, for James A. FitzPatrick, Access Authorization (Letter Only)Significance Determination Process
Affidavit
ML0834603374 December 2008James A. FitzPatrick, Revised Submittal Date for the Stress Analysis Summary for the N2C-SE Weld OverlayWeld Overlay
Dissimilar Metal Weld
JAFP-08-0128, James A. FitzPatrick, Revised Submittal Date for the Stress Analysis Summary for the N2C-SE Weld Overlay4 December 2008James A. FitzPatrick, Revised Submittal Date for the Stress Analysis Summary for the N2C-SE Weld OverlayWeld Overlay
Dissimilar Metal Weld
JAFP-08-0128, Revised Submittal Date for the Stress Analysis Summary for the N2C-SE Weld Overlay4 December 2008Revised Submittal Date for the Stress Analysis Summary for the N2C-SE Weld OverlayWeld Overlay
JAFP-08-0131, Enclosure 2, Structural Integrity Associates, Inc. Calculation 0800769.311 Crack Growth Analysis for Recirculation Inlet Nozzle N-2C4 December 2008Enclosure 2, Structural Integrity Associates, Inc. Calculation 0800769.311 Crack Growth Analysis for Recirculation Inlet Nozzle N-2CWeld Overlay
Dissimilar Metal Weld
ML0835903394 December 2008Enclosure 2, Structural Integrity Associates, Inc. Calculation 0800769.311 Crack Growth Analysis for Recirculation Inlet Nozzle N-2CWeld Overlay
Dissimilar Metal Weld
JAFP-08-0131, Enclosure 3, Structural Integrity Associates, Inc. Calculation 0800769.316 Reconciliation of Recirculation Inlet N2 Nozzle-to-Safe End Weld Overlay Repair with Nozzle Stress Report3 December 2008Enclosure 3, Structural Integrity Associates, Inc. Calculation 0800769.316 Reconciliation of Recirculation Inlet N2 Nozzle-to-Safe End Weld Overlay Repair with Nozzle Stress ReportWeld Overlay
Finite Element Analysis
Dissimilar Metal Weld
ML08310066319 November 2008Request for Additional Information Third 10-Year Interval Inservice Inspection Program Plan Relief Request RR-CRV-01Liquid penetrant
IR 05000333/20080047 November 2008IR 05000333-08-004; on 07/01/08 to 09/30/08; James A. FitzPatrick Nuclear Power Plant; Refueling and Other Outage Activities; and Identification and Resolution of Problems
TAC:MD432924 October 2008
ML08294026224 October 2008James a FitzPatrick Nuclear Power Plant-Request for Withholding Information from Public Disclosure Core Operating Limits Report, Revision 24 for Cycle 19 Using GNF-2 Fuel Assemblies
ML08295047124 October 2008Closeout of Generic Letter 2007-01 Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.
JAFP-08-0112, Response to Request for Additional Information Regarding: Application for Amendment to Technical Specifications Regarding Diesel Fuel Oil, Lube Oil, and Starting Air Consistent with TSTF-501 and Diesel Fuel Oil22 October 2008Response to Request for Additional Information Regarding: Application for Amendment to Technical Specifications Regarding Diesel Fuel Oil, Lube Oil, and Starting Air Consistent with TSTF-501 and Diesel Fuel Oil
TAC:MD782821 October 2008
ML08282020321 October 2008Extension Request for Response to GL 2008-01
JAFP-08-0109, Submittal of the Final Ultrasonic Test Results on the N2C-SE Weld Overlay20 October 2008Submittal of the Final Ultrasonic Test Results on the N2C-SE Weld OverlayWeld Overlay
TAC:MD871716 October 2008
ML08291007316 October 2008TAC MD8717, Draft Rais, Relief Requests Plant ISI Program Third 10-year CloseoutLiquid penetrant
ML08289052115 October 2008MD9780, Acceptance Review for Relief Request RR-7
JAFP-08-0107, Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems14 October 2008Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray SystemsSafe Shutdown
Mission time
Scaffolding
JAFP-08-0106, Core Operating Limits Report, Revision 2410 October 2008Core Operating Limits Report, Revision 24
ML0826303653 October 2008Issuance of Amendment Relocation of Pressure and Temperature Curves to the Pressure and Temperature Limits Report Consistent with TSTF-419-APost Accident Monitoring
Hydrostatic
Incorporated by reference
Pressure and Temperature Limits Report
ML0828203903 October 2008Technical Specification Relocation of Pressure and Temperature Curves to the Pressure and Temperature Limits Report Consistent with TSTF-419-APost Accident Monitoring
Hydrostatic
Pressure and Temperature Limits Report
JAFP-08-0103, Certificate of Compliance Not Met During Receipt of Low-Level Radioactive Waste Shipment at Barnwell, Sc Disposal Facility2 October 2008Certificate of Compliance Not Met During Receipt of Low-Level Radioactive Waste Shipment at Barnwell, Sc Disposal FacilityRAMQC
JAFP-08-0102, Request for Relief (RR-7 Revision 1) - Proposed Alternative to ASME Code Requirements for Weld Overlay Repairs1 October 2008Request for Relief (RR-7 Revision 1) - Proposed Alternative to ASME Code Requirements for Weld Overlay RepairsWeld Overlay
Hydrostatic
Nondestructive Examination
VT-2
Liquid penetrant
Dissimilar Metal Weld