Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
HBL-14-008, Enclosure 9: Technical Report TR-HBIP-2002-01, Seismic Hazard Assessment for the Humboldt Bay ISFSI Project. Appendix 9A-42 to End. Enclosures 10 & 11: Humboldt Bay Power Plant Tritium Evaluation and DECON-POS-HOS-H011, Groundwater Invest | 27 December 2002 | Enclosure 9: Technical Report TR-HBIP-2002-01, Seismic Hazard Assessment for the Humboldt Bay ISFSI Project. Appendix 9A-42 to End. Enclosures 10 & 11: Humboldt Bay Power Plant Tritium Evaluation and DECON-POS-HOS-H011, Groundwater Investig | Earthquake |
ML033650194 | 26 December 2002 | to GEO.HBIP.02.06, Site Amplification Factors for Hbip. | Earthquake |
ML033650192 | 26 December 2002 | to GEO.HBIP.02.05, Development of Hbip ISFSI Spectrum Compatible Time Histories. | Earthquake |
ML033650191 | 26 December 2002 | to GEO.HBIP.02.04, Development of Response Spectra for the Hbpp Isfsi. | Earthquake |
ML033650188 | 26 December 2002 | to GEO.HBIP.02.03, Development of Maximum Credible Earthquake Magnitudes and Distances for the Hbip. | Earthquake |
TAC:MB4263 | 18 November 2002 | ||
ML023250203 | 18 November 2002 | Humbolt Bay Power Plant Unit 3, Technical Specifications (Ts), Converting Current TS to Set of Permanently Defueled Technical Specifications Based on Format Consistent with Standard Technical Specifications (NUREG-1430 Through NUREG-1434) | Time of Discovery High Radiation Area Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Fire Protection Program |
ML023240595 | 18 November 2002 | Humbolt Bay Power Plant Unit 3, License Amendment, Converting Current Technical Specifications to Set of Permanently Defueled Technical Specifications Based on Format Consistent with Standard Technical Specifications (NUREG-1430 Through NUR | High Radiation Area Offsite Dose Calculation Manual Emergency Lighting Annual Radioactive Effluent Release Report Process Control Program Earthquake Fire Protection Program |
ML023240460 | 18 November 2002 | Humbolt Bay, Biweekly Notice Memo, Notice of Issuance of Amendment 34 to License DPR-7, Replacing the Current TS with Set of Permanently Defueled TS to Reflect the Permanently Defueled Condition of the Plant |