Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML17090A456 | 31 March 2017 | Notification of Licensed Operator Initial Examination (05000280/2017301 and 05000281/2017301) | |
ML17094A522 | 30 March 2017 | Submittal of Decommissioning Funding Status Report | |
ML17094A409 | 30 March 2017 | Submittal of 2016 Annual Changes, Tests and Experiments Report | Reserve Station Service Transformer Open Phase Condition Fuel cladding |
ML17067A083 | 29 March 2017 | Correction Letter to License Amendment Nos 287 and 287. Issuance of Amendments for Generic Letter 2008-01 (Gas Accumulation) (CAC Nos. MF5600 and MF5601) | Fire Protection Program |
ML17076A141 | 16 March 2017 | Notification of Inspection Request for Information | High Radiation Area Locked High Radiation Area Process Control Program |
IR 05000280/2017008 | 15 March 2017 | NRC Problem Identification and Resolution Inspection Report 05000280/2017008 and 05000281/2017008 | Internal Flooding Condition Adverse to Quality Significance Determination Process |
ML17075A256 | 10 March 2017 | Revised Response to Request for Additional Information Item #6.a Regarding Supporting Probabilistic Risk Assessment on Proposed License Amendment Request Emergency Service Water Pump Allowed Outage Time Extension | Probabilistic Risk Assessment |
CAC:MF3111 | 8 March 2017 | ||
ML17039A893 | 2 March 2017 | Letter to Those on the Attached List - Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (Batch 1) | |
IR 05000280/2016006 | 1 March 2017 | Annual Assessment Letter for Surry Power Station, Units 1 and 2 - Report 05000280/2016006 and 05000281/2016006 | Open Phase Condition |
ML17066A187 | 1 March 2017 | Response to Request for Additional Information Regarding Supporting Probabilistic Risk Assessment for License Amendment Request for Emergency Service Water Pump Allowed Outage Extension | Probabilistic Risk Assessment |
CAC:MF8145 | 1 March 2017 | ||
ML17100A611 | 28 February 2017 | Email - Minor Comment NRCs Safety Evaluation for the Surry Unit 2 4th Interval Limited Exam Relief Requests | |
ML17030A081 | 24 February 2017 | Request for Withholding Information from Public Disclosure | |
ML17031A130 | 23 February 2017 | Request for Withholding Information from Public Disclosure | |
ML17055C360 | 23 February 2017 | Submittal of Supplement to Proposed Alternative to ASME Section XI, Requirements for Repair/Replacement of Buried Circulating and Service Water Class 3 Piping with Carbon Fiber Reinforced Polymer | |
ML16365A118 | 17 February 2017 | Requests for Relief LMT-R01, LMT-SS01, LMT-CS01, LMT-P01, LMT-C01, LMT-C02, LMT-C03, and LMT-C04 - for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval | Nondestructive Examination VT-2 Incorporated by reference Liquid penetrant Through-Wall Leak |
ML17054D477 | 17 February 2017 | Confirmation of Payment of Two Part 170 Invoices on 02/16/2017 | |
ML17052A401 | 17 February 2017 | Supplemental Letter to the Security Plan - Revision 24 | |
ML17047A487 | 10 February 2017 | Response to Request for Additional Information on Proposed License Amendment Request Extension of TS 3.14 Service Water Flow Path Allowed Outage Time | |
ML17055B622 | 10 February 2017 | Email - Acceptance Review, January 20, 2017 Virginia Electric and Power Company for Surry Power Station, Unit Nos. 1 and 2 | |
CAC:TM3111 | 8 February 2017 | ||
ML17040A407 | 6 February 2017 | Inservice Inspection Owner'S Activity Report 1-5-1-2, for Refueling Outage S1R27, First Period of the Fifth ISI Interval | |
ML17044A011 | 6 February 2017 | Cycle 28 Startup Physics Test Report | |
ML17038A473 | 6 February 2017 | Stations - Submittal of Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and ISFSI Security Program Revision 24 | |
ML17033A283 | 6 February 2017 | Supplemental Information Needed for Acceptance of Requested Licensing Action Proposed Alternative to ASME Section XI Requirements in Accordance with 10CFR 50.55a(z)(1) | |
ML17044A012 | 3 February 2017 | Confirmation of Payment | |
IR 05000280/2016004 | 1 February 2017 | NRC Integrated Inspection Report 05000280/2016004 and 05000281/2016004 | Safe Shutdown Boric Acid High winds Packing leak High Radiation Area Non-Destructive Examination Fire Barrier Enforcement Discretion Reserve Station Service Transformer Locked High Radiation Area Significance Determination Process Operability Determination Maintenance Rule Program Biofouling Fire Protection Program Scaffolding Unidentified leakage |
ML17032A279 | 27 January 2017 | Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 | Generic Fundamentals Examination |
IR 05000280/2016501 | 24 January 2017 | U.S. Nuclear Regulatory Commission Emergency Preparedness Annual Inspection Report Nos. 05000280/2016501 and 05000281/2016501 | |
ML17026A174 | 20 January 2017 | Surrey Power Station, Units 1 and 2 - Proposed License Amendment Request for Revision to Technical Specifications Residual Heat Removal Requirements and Component Cooling System Requirements & Addition of Surveillance Requirement | Surveillance Frequency Control Program |
CAC:MF9124 | 20 January 2017 | ||
ML17017A079 | 17 January 2017 | Nuclear Property Insurance Coverage | |
ML17010A043 | 5 January 2017 | Stations and Associated ISFSIs - Cover Letter for Submission of Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and ISFSI Security Program - Revision 23 | |
ML17006A398 | 4 January 2017 | ISFSI, Surry, Units 1 and 2, and ISFSI - Correspondence Distribution Request Change Update |