Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
LR-N11-0086, NRC Decommissioning Funding Status Report31 March 2011NRC Decommissioning Funding Status Report
RS-11-053, Deviation from BWR Vessel and Internals Project Guideline - Inspection of the Core Plate Bolts31 March 2011Deviation from BWR Vessel and Internals Project Guideline - Inspection of the Core Plate BoltsEVT-1
RA-11-016, Response to Request for Additional Information Regarding Exelon Cyber Security Plan; Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities and Three Mile Island31 March 2011Response to Request for Additional Information Regarding Exelon Cyber Security Plan; Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities and Three Mile IslandCyber Security
RS-11-044, 2011 Report on Status of Decommissioning Funding for Reactors31 March 20112011 Report on Status of Decommissioning Funding for Reactors
TAC:ME549131 March 2011
TAC:ME365231 March 2011
ML11088011725 March 2011Response to Request for Additional Information License Amendment Request Concerning Non-Conservative Technical Specification Associated with the Amount of Liquid Nitrogen StorageSafe Shutdown
Stroke time
Hardened vent
IR 05000278/201140318 March 2011IR 05000277--11-403, 05000278-11-403, on 01/24/2011 - 02/23/2011, Peach Bottom Atomic Power Station; Access AuthorizationSignificance Determination Process
Affidavit
ML11076018717 March 2011Single Positive Test Form, for Pre-Access, Collected on 09/13/2010
IR 05000277/201130114 March 2011Er 05000277/2011301, 05000278/2011301, January 31 - February 10, 2011; Peach Bottom Atomic Power Plant, Units 2 and 3, Initial Operator Licensing Examination Report
ML11070049211 March 2011Single Positive Test Form, for Pre-Access, Collected on 09/16/2010
ML11069119710 March 2011Notice of Licensee Meeting - Peach Bottom Atomic Power Station, Units 2 and 3, to Review Results of Nrc'S Assessment of Safety Performance of Peach Bottom Atomic Power Station for Calendar Year 2010Open House
ML11070014610 March 2011Additional Information Associated with the Acceptance Review of Relief Request Concerning Reactor Pressure Vessel Circumferential Shell Welds
ML11060110110 March 2011Request for Additional Information Regarding License Amendment Request Related to Liquid Nitrogen StorageSafe Shutdown
Stroke time
TAC:ME539210 March 2011
ML1106702117 March 2011Response to NRC Question Regarding Containment Accident Pressure Credit for Non-LOCA EventsSafe Shutdown
IR 05000277/20100014 March 2011Annual Assessment Letter for Peach Bottom Atomic Power Station, EOC-11 (05000277/2010001 and 05000278/2010001)
ML1105508754 March 2011Fleet - Request for Additional Information Regarding Approval of Cyber Security PlanCyber Security
ML1107005153 March 2011Single Positive Test Form, for Random, Collected on 11/23/2010
ML1113700363 March 2011Single Positive Test Form, for Pre-Access, Collected on 09/01/2010
ML11158003728 February 2011Final Qa/Related Forms (Folder 1)Job Performance Measure
RS-11-024, Submittal of Fitness for Duty Performance Data Reports - Annual 201025 February 2011Submittal of Fitness for Duty Performance Data Reports - Annual 2010Fitness for Duty
ML11070050423 February 2011Single Positive Test Form, for Pre-Access, Collected on 09/07/2010
ML11070050023 February 2011Single Positive Test Form, for Pre-Access, Collected on 08/09/2010
ML11070050123 February 2011Single Positive Test Form, for Pre-Access, Collected on 09/13/2010
ML11054072423 February 20112/23/11 Ltr to F. Schiffley Re Participation in Commission Meeting on 50.46a Risk-informed Emergency Core Cooling System Rule on 3/24/11
ML11070050523 February 2011Single Positive Test Form, for Pre-Access, Collected on 06/01/2010
ML11070050923 February 2011Single Positive Test Form, for Pre-Access, Collected on 09/07/2010
ML11055031323 February 2011Spent Fuel Pool Criticality DocumentsSafe Shutdown
Shutdown Margin
Aging Management
ML11070050623 February 2011Single Positive Test Form, for Random, Collected on 04/20/2010
ML11068044423 February 2011Comment (1) of Biff Bradley, on Behalf of Nuclear Energy Institute, Supporting Draft NUREG-1953 Re Confirmatory Thermal-Hydraulic Analysis Risk Models - Surry and Peach BottomProbabilistic Risk Assessment
ML11070049622 February 2011Single Positive Test Form, for Pre-Access, Collected on 03/08/2010
ML11070049522 February 2011Single Positive Test Form, for Pre-Access, Collected on 05/17/2010
ML11070049422 February 2011Single Positive Test Form, for Pre-Access, Collected on 9/10/2010
ML11073002118 February 2011G20110170/LTR-11-0102/EDATS: SECY-2011-0138 - Resp. Letter to Peter A. Deluca Susquehanna River Basin Commission 2011 Water Resources Program
ML11049053317 February 2011Submittal of Peach Bottom, Units 2 and 3, National Pollutant and Discharge Elimination System (NPDES) Permit No. PA 0009733Grab sample
Power Uprate
ML11048005415 February 2011Notification of Potential Part 21 Reportable Condition: Crack Indications in Marathon Control Rod Blades
ML11046048715 February 2011Notification of Potential Part 21 Reportable Condition Re Design Life of D and s Lattice Marathon Control Blades
ML11046012215 February 2011Fm Notification of Potential Part 21 Report Serial Number 10-06 Re Identification of Facilities within the Us Which Fails to Comply or Contains a DefectLiquid penetrant
IR 05000277/201120114 February 2011IR 05000277-11-201 & 05000278-11-201, on 01/18/2011 - 01/20/11, Peach Bottom, Units 2 & 2 - Cover LetterAffidavit
ML1104504199 February 2011Spent Fuel Pool Criticality Documents
ML1103905147 February 2011Notification of Potential Part 21 Report Concerning Emergency Diesel Generator Bearing FailuresLiquid penetrant
ML1103904617 February 2011County Station Analysis L-003388, Revision 0, LaSalle Irsf Shielding Calculations for Class B & C Waste, Attachment N (Page N17 of N29) Through Attachment P (Page P11 of P11)High Radiation Area
Deep Dose Equivalent
ML1103904607 February 2011County Station Analysis L-003388, Revision 0, LaSalle Irsf Shielding Calculations for Class B & C Waste, Attachment N (Page N1 of N29) Through Attachment N (Page N16 of N29) MCNP Cases and Geometry: Analysis of 100 Filled HICs
ML1103904577 February 2011County Station Analysis L-003388, Revision 0, LaSalle Irsf Shielding Calculations for Class B & C Waste, Attachment K (Page K1 of K18) Through Attachment M (Page M147 of M147) Spreadsheet Used to Check MCNP Cases and Data Analysis
ML1103904497 February 2011County Station Analysis L-003388, Revision 0, LaSalle Irsf Shielding Calculations for Class B & C Waste, Attachment E (Page E1 of E246) Through Attachment I (Page I-17 of I-17)
ML1103904487 February 2011County Station Analysis L-003388, Revision 0, LaSalle Irsf Shielding Calculations for Class B & C Waste, Attachment B (Page B1 of B485) Through Attachment D (Page D3 of D5) MCNP Cases and Geometry
RS-11-016, Clarification of Supplemental Information - License Amendment to Allow Receipt and Storage of Low-Level Radioactive Waste at LaSalle County Station, Units 1 and 2 and Peach Bottom Atomic Power Station, Units 2 and 37 February 2011Clarification of Supplemental Information - License Amendment to Allow Receipt and Storage of Low-Level Radioactive Waste at LaSalle County Station, Units 1 and 2 and Peach Bottom Atomic Power Station, Units 2 and 3Offsite Dose Calculation Manual
ML1103904507 February 2011County Station Analysis L-003388, Revision 0, LaSalle Irsf Shielding Calculations for Class B & C Waste, Attachment J (Page J1 of J18) Excel Spreadsheet Formulas
IR 05000277/20100053 February 2011IR 05000277-10-005 and 05000278-10-005; on 10/01/2010 - 12/31/2010 Peach; Bottom Atomic Power Station (Pbaps), Units 2 and 3; Surveillance TestingHigh Radiation Area
Stroke time
Water Inventory Control
Internal Flooding
Enforcement Discretion
Functionality Assessment
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Inattentive