Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML003771535 | 20 November 2000 | Affidavit of Gareth W. Parry, Stephen F. Lavie, Robert L. Palla and Christopher Gratton in Support of NRC Staff Brief and Summary of Relevant Facts, Data and Arguments Upon Which the Staff Proposes to Rely at Oral Argument on Environmental | High winds Loop seal Ultimate heat sink Time to boil Probabilistic Risk Assessment Large early release frequency Severe Accident Management Guideline Earthquake Affidavit |
ML003771530 | 20 November 2000 | NRC Staff Brief and Summary of Relevant Facts, Data and Arguments Upon Which the Staff Proposes to Rely at Oral Argument on Environmental Contention EC-6 | High winds Probabilistic Risk Assessment Earthquake Affidavit |
ML061930439 | 20 November 2000 | Volume 1, Exhibit 1, Sections 5-7 & Appendices A-G to Summary of Facts, Data and Arguments on Which Applicant... - Redacted Version | Time to boil Probabilistic Risk Assessment Emergency Lighting Job Performance Measure Large early release frequency Backfit Affidavit |
ML003767340 | 26 October 2000 | Revised Emergency Plan Implementing Procedures PEP-260 (Revision 6), PEP-270 (Revision 6), PEP-250 (Revision 8), PEP-240 (Revision 5), PEP-230 (Revision 5), and PEP-310 (Revision 9) | Safe Shutdown Health Physics Network Shutdown Margin Grab sample Severe Accident Management Guideline Siren |
ML003759393 | 6 October 2000 | Orange County'S Third Set of Environmental Discovery Requests Directed to the Applicant | |
ML003677142 | 14 January 2000 | NRC Staffs Evaluation of the Shearon Harris Nuclear Power Plant, Unit 1, Individual Plant Examination of External Events (IPEEE) Submittal(Ipeee) Submittal (TAC No. M83627) | High winds Probabilistic Risk Assessment |
HNP-00-008, Revised Epips, Including Rev 5 to PEP-110, Emergency Classification & Proective Action Recommendations, Rev 8 to PEP-310, Notifications & Communications & Rev 1 to PEP-342, Core Damage Assessment. with 01/14/00 Letter | 14 January 2000 | Revised Epips, Including Rev 5 to PEP-110, Emergency Classification & Proective Action Recommendations, Rev 8 to PEP-310, Notifications & Communications & Rev 1 to PEP-342, Core Damage Assessment. with 01/14/00 Letter | Fitness for Duty Earthquake Siren |
ML003673751 | 4 January 2000 | Affidavit of Kenneth C. Heck in Support of NRC Staff'S Written Summary | Safe Shutdown Non-Destructive Examination Hydrostatic Probabilistic Risk Assessment Nondestructive Examination Incorporated by reference Condition Adverse to Quality Commercial Grade Liquid penetrant Power Uprate Affidavit |
ML003673316 | 4 January 2000 | Detailed Summary of Facts, Data and Arguments and Sworn Submission on Which Orange County Intends to Rely at Oral Argument to Demonstrate the Existence of a Genuine and Substantial Dispute of Fact with the Licensee Regarding the Proposed Ex | Safe Shutdown Boric Acid Time of Discovery Shutdown Margin Foreign Material Exclusion Exemption Request Earthquake Backfit Overexposure |