Semantic search
Jump to navigation
Jump to search
Issue date | Title | From | To | |
---|---|---|---|---|
NRC Generic Letter 1988-03 | 17 February 1988 | NRC Generic Letter 1988-003: Resolution of Generic Safety Issue 93, Steam Binding of Auxiliary Feedwater Pumps. | Miraglia F Office of Nuclear Reactor Regulation | |
ML20148K605 | 23 March 1988 | Responds to Generic Ltr 88-03.Requirement for Once Per Shift Check of Auxiliary Feedwater (AFW) Piping Temps Committed to in IE Bulletin 85-001 Confirmed.Removal of Lagging from AFW Piping Per IE Info Notice 84-06 Noted | Fay C WEC Energy Group | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
NRC Generic Letter 1988-07 | 7 April 1988 | NRC Generic Letter 1988-007: Modified Enforcement Policy Relating to 10 CFR 50.49 Environmental Qualification of Electrical Equipment Important to Safety for Nuclear Power Plants. | Miraglia F Office of Nuclear Reactor Regulation | |
ML20151M138 | 12 April 1988 | Responds to Util Reaffirming Commitment to Check Auxiliary Feedwater Piping Temp Once Per Shift,Per Generic Ltr 88-03.Commitments Acceptable.Generic Issue 93 Considered Resolved | Office of Nuclear Reactor Regulation Wagner D | Fay C WEC Energy Group |
NRC Generic Letter 1990-04 | 25 April 1990 | NRC Generic Letter 1990-004: Request for Information on Status of Licensee Implementation of Generic Safety Issues Resolved with Imposition of Requirements or Corrective Actions | Partlow J Office of Nuclear Reactor Regulation | |
ML030760550 | 7 June 2002 | DBD-01, Auxiliary Feedwater System Design Basis Document, Revision 2, Section 3.4.1 - Attachment B, Page B-2 | Westinghouse Electric Corp | Office of Nuclear Reactor Regulation |
ML030770538 | 19 September 2002 | DBD-101, Rev. 3, Auxiliary Feedwater System Design Basis Document, Section 3.7 - Attachment B | We Energies | Office of Nuclear Reactor Regulation |
ML16251A161 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 10 - Steam and Power Conversion | Point Beach | Office of Nuclear Reactor Regulation |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 10 - Steam and Power Conversion | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 10 - Steam and Power Conversion | Point Beach | Office of Nuclear Reactor Regulation |
ML21102A358 | 2 April 2021 | Update to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion | Point Beach | Office of Nuclear Reactor Regulation |