Semantic search
Jump to navigation
Jump to search
Issue date | Title | From | To | |
---|---|---|---|---|
NRC Generic Letter 1984-15 | 2 July 1984 | NRC Generic Letter 1984-015: Proposed Actions to Improve and Maintain Diesel Generator Reliability | Eisenhut D Office of Nuclear Reactor Regulation | |
Information Notice 1985-32, Recent Engine Failures of Emergency Diesel Generators | 22 April 1985 | Recent Engine Failures of Emergency Diesel Generators | Jordan E NRC/IE | |
ML20236D804 | 22 July 1987 | Forwards Tech Specs Re Surveillance Testing of Emergency Diesel Generators at Byron,Braidwood & LaSalle County Stations,Per NRC 870720 Request.Surveillance Testing Methods Consistent W/Generic Ltr 84-15 | Exelon Ainger K | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
ML20246Q325 | 16 March 1989 | Proposed Changes to Tech Specs,Implementing Generic Ltr 84-15 Re Diesel Generator Recommendations & Removing Footnotes Which No Longer Apply | Exelon | |
ML20246Q309 | 16 March 1989 | Application for Amends to Licenses NPF-11 & NPF-18,revising Tech Specs to Implement Generic Ltr 84-15 Diesel Generator Recommendations & Remove Footnotes No Longer Applicable | Exelon Morgan W | Office of Information Resources Management |
ML20245J021 | 16 June 1989 | Identifies Need for Waiver of Compliance for Unit 2.Waiver of Compliance Requested to Be in Effect Until Forthcoming Amend Request Approved by NRC | Exelon Morgan W | Murley T Office of Nuclear Reactor Regulation |
ML20245C473 | 16 June 1989 | Discusses Util 890616 Request for Temporary Waiver of Compliance from Tech Spec 3.8.1.1 Action E Re Demonstrating Operability of Remaining Emergency Ac Power Sources W/Diesel Generator 2B Inoperable.Temporary Waiver Granted | Office of Nuclear Reactor Regulation Siegel B | Exelon Kovach T |
ML20245L041 | 23 June 1989 | Suppl to Application for Amend to Licenses NPF-11 & NPF-18, Revising Tech Specs to Conform W/Diesel Generator Test Schedule Recommendations of Generic Ltr 84-15 | Exelon Morgan W | Murley T Office of Nuclear Reactor Regulation |
ML20245L058 | 23 June 1989 | Proposed Tech Specs Re Conformance W/Diesel Generator Test Schedule Recommendations of Generic Ltr 84-15 | Exelon | |
IR 05000373/1989017 | 3 August 1989 | Insp Repts 50-373/89-17 & 50-374/89-17 on 890610-0724. Violation Noted.Major Areas Inspected:Operational Safety, Surveillance,Maint,Lers,Esf Sys Walkdowns,Qa Program Implementation & Radiation Occurrence Repts | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) Harrison J | |
ML19325E360 | 26 October 1989 | Forwards Addl Info Re Application for Amend to Licenses NPF-11 & NPF-18,revising Tech Specs to Conform W/Diesel Generator Test Schedule Recommendations,Per Generic Ltr 84-15 | Exelon Morgan W | Murley T Office of Nuclear Reactor Regulation |
ML20084U292 | 8 June 1995 | Application for Amends to Licenses NPF-11,NPF-18,NPF-72, NPF-77,NPF-37 & NPF-66.Amends Would Revise SRs & Administrative Requirements Associated W/Edgs | Exelon Benes G | Office of Information Resources Management |
ML22112A050 | 31 January 1997 | Abb System 80+ Design Control Document - Volume 11 | ABB Combustion Engineering | Office of Nuclear Reactor Regulation |
ML22112A079 | 31 January 1997 | Abb System 80+ Design Control Document - Volume 20 | ABB Combustion Engineering | Office of Nuclear Reactor Regulation |
RS-05-001, Request for a License Amendment to Extend the Completion Times Related to Technical Specifications Associated with Residual Heat Removal Service Water, Diesel Generator Cooling Water and the Opposite Unit Division 2 Diesel.. | 13 April 2005 | Request for a License Amendment to Extend the Completion Times Related to Technical Specifications Associated with Residual Heat Removal Service Water, Diesel Generator Cooling Water and the Opposite Unit Division 2 Diesel.. | Exelon Bauer J | Office of Nuclear Reactor Regulation Document Control Desk |
RS-06-141, Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process | 18 October 2006 | Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process | Exelon Benyak D | Office of Nuclear Reactor Regulation Document Control Desk |
RS-06-154, Request for Amendment to Technical Specifications Section 5.5.7, Inservice Testing Program. | 17 November 2006 | Request for Amendment to Technical Specifications Section 5.5.7, Inservice Testing Program. | Exelon Benyak D | Office of Nuclear Reactor Regulation Document Control Desk |
RS-10-031, Application for Technical Specification Change Regarding Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Rev.3) | 15 February 2010 | Application for Technical Specification Change Regarding Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Rev.3) | Exelon Simpson P | Office of Nuclear Reactor Regulation Document Control Desk |
RS-14-128, Updated Final Safety Analysis Report, Revision 20, Technical Specifications Bases | 11 April 2014 | Updated Final Safety Analysis Report, Revision 20, Technical Specifications Bases | Exelon | Office of Nuclear Material Safety and Safeguards Office of Nuclear Reactor Regulation |
RS-18-130, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO | 1 November 2018 | Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO | Exelon Simpson P | Office of Nuclear Reactor Regulation Document Control Desk |