Semantic search
Jump to navigation
Jump to search
Issue date | Title | From | To | |
---|---|---|---|---|
ML20084N899 | 11 May 1984 | Forwards WCAP-10547 & Proprietary WCAP-10546, Technical Bases for Eliminating Large Primary Loop Pipe Rupture as Structural Design Basis.... Exemption from 10CFR50,App a requested.WCAP-10546 Withheld (Ref 10CFR2.790) | Duke Energy Tucker H | Adensam E Office of Nuclear Reactor Regulation Harold Denton |
ML20091E435 | 29 May 1984 | Requests Exemption from GDC 4 Re Application of leak-before- Break Concept to Eliminate Postulated Pipe Breaks in Pressurizer Surge Line from Plant Structural Design Basis. Safety Balance Demonstrated | Duke Energy Tucker H | Adensam E Office of Nuclear Reactor Regulation Harold Denton |
ML20092H669 | 18 June 1984 | Requests Exemption from GDC 4 to Apply Leak Before Break Concept to Eliminate Postulated Pipe Breaks in Class 1 Accumulator Injection Lines from Structural Design Basis. Basis Provided in WCAP-10537.Rept Withheld (Ref 10CFR2.790) | Duke Energy Tucker H | Adensam E Office of Nuclear Reactor Regulation Harold Denton |
ML20092N569 | 27 June 1984 | Forwards Nonproprietary & Proprietary Technical Basis for Eliminating RHR Line Rupture as Structural Design Basis for Catawba Units 1 & 2 & McGuire Units 1 & 2, Per Request for Exemption from GDC 4 | Duke Energy Tucker H | Adensam E Office of Nuclear Reactor Regulation Harold Denton |
ML20115E915 | 17 April 1985 | Modifies 840511 Response to Generic Ltr 84-04.Partial Exemption to GDC 4 Should Be Granted for First Two Cycles of Operation.Relief for Postulated Loop Break Effect on Reactor Cavity Will Be Pursued in GDC 4 Rulemaking | Duke Energy Owen W | Adensam E Office of Nuclear Reactor Regulation Harold Denton |
ML20137M916 | 27 November 1985 | Forwards Request for Exemption from GDC 4 to Apply leak- before-break Concept to Eliminate Postulated Pipe Breaks in RCS Primary Loop from Plant Structural Design Basis. Resolution Requested by 860228.Fee Paid | Duke Energy Tucker H | Youngblood B Office of Nuclear Reactor Regulation Harold Denton |
NRC Generic Letter 1989-21 | 19 October 1989 | NRC Generic Letter 1989-021: Request for Information Concerning Status of Implementation of Unresolved Safety Issue (USI) Requirements | Partlow J Office of Nuclear Reactor Regulation | |
ML20073D169 | 8 September 1994 | Requests That NRR Evaluate Acceptability of Attached Justification for Containment Airborne Particulate Radiation Monitors (EMF38) to Be Classified as non-seismic | Duke Energy Rehn D | Office of Information Resources Management |
ML051160367 | 22 April 2005 | IR 05000412-05-002, IR 05000414-05-002 on 01/01/2005 - 03/31/2005 for Catawba, Units 1 and 2; Fire Protection, Operability Evaluations, and Problem Identification and Resolution | Ernstes M NRC/RGN-II/DRP/RPB1 | Duke Energy Jamil D |