ML23086C10127 March 2023NRC Staff'S Answer Opposing Cfur Hearing Request
CP-202000575, (CPNPP) - Exigent License Amendment Request (LAR) 20-007 Revision to Technical Specification (TS) 3.7.8, Station Service Water System and TS 3.8.1, AC Sources - Operating19 November 2020(CPNPP) - Exigent License Amendment Request (LAR) 20-007 Revision to Technical Specification (TS) 3.7.8, Station Service Water System and TS 3.8.1, AC Sources - Operating
ML20314A34212 November 2020NRC Teleconference with Comanche Peak Regarding a Proposed Exigent License Amendment Request (LAR) 20-007 TS 3.7.8 Station Service Water System TS 3.8.1 AC Sources - Operating
CP-202000305, (CPNPP) - Exigent License Amendment Request (LAR) 20-002 Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water24 June 2020(CPNPP) - Exigent License Amendment Request (LAR) 20-002 Revision to Technical Specification (TS) 3.7.19, Safety Chilled Water
ML17067A16613 June 2017Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation
ML16014A12522 January 2016Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force
ML15320A10013 November 2015IR 05000445/2015008 and 05000446/2015008, on 08/31/2015 - 10/01/2015, Comanche Peak Nuclear Power Plant, NRC Problem Identification and Resolution and Notice of Violation
IR 05000445/20150072 September 2015IR 05000445/2015007 and 05000446/2015007), June 1, 2015 Through August 3, 2015, Comanche Peak, Units 1 and 2, NRC Component Design Bases
CP-201400324, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(0 Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident27 March 2014Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(0 Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
CP-201201129, License Amendment Request (LAR) 12-005, Revision to Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation and 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation2 October 2012License Amendment Request (LAR) 12-005, Revision to Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation and 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation
ML12053A34012 March 2012Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident
ML12056A04912 March 2012Enclosure 3 - Recommendation 2.3: Seismic
ML12056A05012 March 2012Enclosure 4 - Recommendation 2.3: Flooding
ML12056A04812 March 2012Enclosure 2 - Recommendation 2.1: Flooding
ML12056A04712 March 2012Enclosure 1 - Recommendation 2.1: Seismic
ML09026003923 January 2009NRC Response to GDC 2, 4, and 5 One-Pager
ML08151017327 June 2008Issuance of Amendment Nos. 146 and 146, Stretch Power Uprate, Revision to TS 1.0, Use and Application, to Revise Rated Thermal Power from 3458 to 3612 Mwt
CPSES-200701127, Response to Request for Additional Information Related to License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times.15 November 2007Response to Request for Additional Information Related to License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times.
ML07249035831 August 2007WCAP-16840-NP, Rev. 0, Comanche Peak Nuclear Power Plant Stretch Power Uprate Licensing Report, Page 2.8.1-1 to End
ML07249031031 August 2007WCAP-16840-NP, Rev. 0, Comanche Peak Nuclear Power Plant Stretch Power Uprate Licensing Report, Cover to Page 2.7.7-5
ML07073003726 March 2007Letter & License Pgs - Issuance of Amendment Nos. 136 & 136 - Changes to TSs Re Control Room Envelope Habitability in Accordance w/TSTF-448, Rev. 3, Using Consolidated Line Item Improvement Process
CPSES-200700130, License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel Generators18 January 2007License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel Generators
CPSES-200601634, License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel Generators13 October 2006License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel Generators
ML05238020829 September 2005Issuance of Amendments Reactor Trip System and Engineered Safety Features Actuation System
CPSES-200500155, License Amendment Request (LAR) 04-015 Revision to Technical Specification 3.3.1 Reactor Trip System Instrumentation and 3.3.2 Engineered Safety Feature Actuation System Instrumentation (Esffas)24 March 2005License Amendment Request (LAR) 04-015 Revision to Technical Specification 3.3.1 Reactor Trip System Instrumentation and 3.3.2 Engineered Safety Feature Actuation System Instrumentation (Esffas)
ML05046033131 January 2005Issuance License Amendments 114 & 114 Plant Protection Plant Times, Completion Times and Surveillance Test Intervals
CPSES-200402477, (CPSES) License Amendment Request (LAR) 04-013 Revision to Technical Specification (TS) 3.7.5 Auxiliary Feedwater (AFW) System24 January 2005(CPSES) License Amendment Request (LAR) 04-013 Revision to Technical Specification (TS) 3.7.5 Auxiliary Feedwater (AFW) System
CPSES-200402431, License Amendment Request 04-011, Revision to Technical Specification (TS 3.3.3) Post Accident Monitoring Instrumentation and 3.6.8 Hydrogen Recombiners28 October 2004License Amendment Request 04-011, Revision to Technical Specification (TS 3.3.3) Post Accident Monitoring Instrumentation and 3.6.8 Hydrogen Recombiners
CPSES-200400179, Comanche Peak - 1OCFR50.59 Evaluation Summary Report 00112 February 2004Comanche Peak - 1OCFR50.59 Evaluation Summary Report 0011
CPSES-200400149, License Amendment Request (LAR) 03-08 Common Stars License Amendment Implementation of WCAP-14333 and WCAP-15376 RTS and ESFAS Test Times, Completion Times, and Surveillance Test Intervals21 January 2004License Amendment Request (LAR) 03-08 Common Stars License Amendment Implementation of WCAP-14333 and WCAP-15376 RTS and ESFAS Test Times, Completion Times, and Surveillance Test Intervals
TXX-9642, Forwards Detailed Description of Amend 94 to Updated FSAR for Cpses.Replacement of FSAR Figures W/Plant Process Flow Diagrams Meets Intent & Requirements of Reg Guide 1.70,rev 21 August 1996Forwards Detailed Description of Amend 94 to Updated FSAR for Cpses.Replacement of FSAR Figures W/Plant Process Flow Diagrams Meets Intent & Requirements of Reg Guide 1.70,rev 2
ML20097H71231 January 1996Nonproprietary Bypass Test Instrumentation for Comanche Peak Units 1 & 2
ML20127M07021 January 1993Forwards Advance FSAR Change to Reclassify Portion of Eight Inch Heater Drain Piping & One Pipe Support in Turbine Bldg from non-seismic to Seismic Category Ii.Change Permits One Seismic Pipe Support to Be Located 13 Inches Inside TB
ML19354D66515 December 1989Forwards Advance FSAR Changes of Tables 6.1B-4 & 6.5-3 Re Revs to Boron Concentration in Refueling Water Storage Tank & RCS & Quantity of Borated Water Used for Calculating Containment Sump Solution Mixing
ML20246L27931 August 1989Provides Advance Changes to Be Included in Future FSAR Amend Re Deletion of Tornado Door Schedule,Replacing Two Roll Up Doors w/blow-out Doors & Deleting Discussion of Venting of Cable Spreading Rooms
ML20246L46731 August 1989Provides Advance Changes to Be Included in Future FSAR Amend Re Removal of Automatic Safety Sys Inoperable Indication for Diesel Generator Room Fans
ML20246M57031 August 1989Forwards Advance FSAR Submittal Re Loadings & Stresses for Category I Structures
ML20246L14131 August 1989Provides Advance Changes to Be Included in Future FSAR Amend Re Component Cooling Water Sys Design Pressure
ML20246L25428 August 1989Provides Advance Changes to Be Included in Future FSAR Amend Re HVAC Gravity Damper Upgrade for FSAR Section 9.4
ML20246L16028 August 1989Provides Advance Changes to Be Included in Future FSAR Amend.Changes Revise Main Steam Safety Valve Blowdown from 5% to Less than or Equal to 12% of Set Pressure for Safety Valve
ML20246K91628 August 1989Forwards Change to Be Included in Future FSAR Amend Re High Silica Concentration Alarm Function
ML20246B27116 August 1989Forwards Response to 890731 Request for Addl Info Re FSAR Sections 3.7 & 3.8.FSAR Advance Submittal Re Temp Ranges Inside & Outside Containment Also Encl
ML20151A62713 July 1988Memorandum & Order (Dismissing Proceedings).* Documents That Parties in Joint Stipulation Agreed to Tender Admitted to Record at 880713 Prehearing Conference.Served on 880715
ML20154Q2161 June 1988Forwards Detailed Listing & Description of Every Change to FSAR That Causes Document to Differ from Version Reviewed & Accepted by NRC Through Sser 12
IR 05000445/19870374 February 1988Design Validation Packages Insp Repts 50-445/87-37 & 50-446/87-28 on 871026-1204.No Violations Noted.Major Areas Inspected:Mechanical Sys,Civil/Structural,Electrical & Instrumentation/Controls
ML20195H91115 January 1988Discusses Amend 66 to FSAR Including Updates,Clarifications, Revs,Corrections,Additions & Editorial Changes as Well as Revised Effective Page Listing for Affected Portions of Rept.Summary of Changes Encl
TXX-6844, Informs That Field Verification Method (Fvm) for Unit 2 Sys Will Be Issued to Support Completion of Walkdowns,Generation of DCAs & Installation of Cable Grips by 881231,in Response to Notice of Violation.Draft FSAR Encl12 October 1987Informs That Field Verification Method (Fvm) for Unit 2 Sys Will Be Issued to Support Completion of Walkdowns,Generation of DCAs & Installation of Cable Grips by 881231,in Response to Notice of Violation.Draft FSAR Encl
NRC Generic Letter 1987-0219 February 1987NRC Generic Letter 1987-002: Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors, Unresolved Safety Issue A-46
ML20207K70729 December 1986Rev 0 to Generic Technical Issue Rept - Evaluation & Resolution of Tera Equipment Qualification Issue Resolution Repts DAP-E-EIC-503 (Environ) & DAP-E-M-500 (Seismic)
TXX-6020, Forwards Revised Procedure Manuals Re Comanche Peak Response Team Checklists.Future Revs Will Be Sent Periodically. Related Documentation Encl10 October 1986Forwards Revised Procedure Manuals Re Comanche Peak Response Team Checklists.Future Revs Will Be Sent Periodically. Related Documentation Encl