Semantic search

Jump to navigation Jump to search
 Issue dateSiteTitle
ML18108A1833 April 2018Indian PointE-mail from R.Walpole to R.Guzman - Draft Relief Request IP2 RR-ISI-05 for Public Meeting Presentation
ML17200C9276 July 2017Indian Point07/26/2017 Entergy Presentation Slides for Public Meeting Regarding Spent Fuel Pool Management Project, New Criticality Analysis
NL-17-066, Submittal of 2016 Annual Radiological Environmental Operating Report15 May 2017Indian PointSubmittal of 2016 Annual Radiological Environmental Operating Report
05000286/LER-2015-0068 August 2016Indian PointTechnical SpecificatiOn Prohibited Condition Due to Two Pressurizer Code Safety Valves Discovered Outside their As-Found Lift Setpoint Test Acceptance Criteria
LER 15-006-01 for Indian Point Unit No. 3 Regarding Technical Specification Prohibited Condition Due to Two Pressurizer Code Safety Valves Discovered Outside Their As-Found Lift Setpoint Test Acceptance Criteria
NL-15-153, Commitment to Maintain Severe Accident Management Guidelines15 December 2015Indian PointCommitment to Maintain Severe Accident Management Guidelines
NL-15-154, Submittal of Emergency Plan Document Change,15 December 2015Indian PointSubmittal of Emergency Plan Document Change,
NL-14-153, Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Cask Use23 December 2014Indian PointIndependent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Cask Use
NL-14-145, Independent Spent Fuel Storage Installation (ISFSI) - Registration of a Spent Fuel Cask Use21 November 2014Indian Point
Holtec
Independent Spent Fuel Storage Installation (ISFSI) - Registration of a Spent Fuel Cask Use
NL-14-115, 10 CFR 50.59(d)(2) Summary Report for Indian Point, Units 1 and 2 April 1, 2012 to March 19, 201418 September 2014Indian Point10 CFR 50.59(d)(2) Summary Report for Indian Point, Units 1 and 2 April 1, 2012 to March 19, 2014
NL-14-116, 10 CFR 72.48(d)(2) Summary Report for Indian Point, Units 1 and 2 April 2. 2012 to March 19, 201418 September 2014Indian Point10 CFR 72.48(d)(2) Summary Report for Indian Point, Units 1 and 2 April 2. 2012 to March 19, 2014
NL-14-089, Unit Number 3, Event Report for Discovery of a Condition That Prevented Immediate Protective Actions to Avoid Exposures to Radiation from Special Nuclear Material22 July 2014Indian PointUnit Number 3, Event Report for Discovery of a Condition That Prevented Immediate Protective Actions to Avoid Exposures to Radiation from Special Nuclear Material
NL-14-078, Post Accident Monitoring Report on Inoperable Condensate Storage Tank Level Transmitters20 June 2014Indian PointPost Accident Monitoring Report on Inoperable Condensate Storage Tank Level Transmitters
NL-14-068, 2013 Annual Radiological Environmental Operating Report9 May 2014Indian Point2013 Annual Radiological Environmental Operating Report
NL-14-060, 2014 Summary Reports for In-Service Inspection and Repairs or Replacements9 May 2014Indian Point2014 Summary Reports for In-Service Inspection and Repairs or Replacements
NL-14-039, Annual Radioactive Effluent Release Report28 April 2014Indian PointAnnual Radioactive Effluent Release Report
NL-14-057, Submittal of Core Operating Limits Report Cycle 229 April 2014Indian PointSubmittal of Core Operating Limits Report Cycle 22
NL-14-038, Units, 1, 2 and 3, 2013 Annual Environmental Protection Plan Report28 March 2014Indian PointUnits, 1, 2 and 3, 2013 Annual Environmental Protection Plan Report
NL-14-040, Submittal of 30-Day 10CFR50.46 Report of Change in Emergency Core Cooling System Model18 March 2014Indian PointSubmittal of 30-Day 10CFR50.46 Report of Change in Emergency Core Cooling System Model
NL-14-026, Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report28 February 2014Indian PointAnnual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report
NL-14-011, Unsatisfactory 10 CFR 26 Fitness-For-Duty Blind Performance Testing Results29 January 2014Indian PointUnsatisfactory 10 CFR 26 Fitness-For-Duty Blind Performance Testing Results
NL-14-004, Submittal of Relief Request No. IP3-ISI-RR-06 for the Fourth 10 Year Reactor Vessel Inservice Inspection Interval Weld Examination13 January 2014Indian PointSubmittal of Relief Request No. IP3-ISI-RR-06 for the Fourth 10 Year Reactor Vessel Inservice Inspection Interval Weld Examination
NL-14-005, Submittal of Relief Request IP3-1SI-RR-07 for Code Case N-770-1 Weld Inspection Frequency Extension13 January 2014Indian PointSubmittal of Relief Request IP3-1SI-RR-07 for Code Case N-770-1 Weld Inspection Frequency Extension
NL-13-166, Report on Inoperable Gross Failed Fuel Detector20 December 2013Indian PointReport on Inoperable Gross Failed Fuel Detector
NL-13-159, Supplement to Response to RAI on Relief Request IP3-008 to Allow Temporary Non-Code Repair to Service Water Piping9 December 2013Indian PointSupplement to Response to RAI on Relief Request IP3-008 to Allow Temporary Non-Code Repair to Service Water Piping
NL-13-155, Unit Number 3, Response on Relief Request IP3-008 to Allow Temporary Non-Code Repair to Service Water Piping6 December 2013Indian PointUnit Number 3, Response on Relief Request IP3-008 to Allow Temporary Non-Code Repair to Service Water Piping
NL-13-148, Report on Inoperable Main Steam Line Radiation Monitor25 November 2013Indian PointReport on Inoperable Main Steam Line Radiation Monitor
NL-13-147, Relief Request 3-008 from ASME Section XI, Subsection IWA-4422.1 to Allow Temporary Non-Code Repair to Service Water Piping20 November 2013Indian PointRelief Request 3-008 from ASME Section XI, Subsection IWA-4422.1 to Allow Temporary Non-Code Repair to Service Water Piping
ML13308B90729 October 2013Indian PointResponse to Request for Additional Information Regarding Steam Generator Tube Inservice Inspection Performed During the Spring 2013 Refueling Outage
NL-13-143, Indian Point, Unit 3 - Response to Request for Additional Information Regarding Steam Generator Tube Inservice Inspection Performed During the Spring 2013 Refueling Outage29 October 2013Indian PointIndian Point, Unit 3 - Response to Request for Additional Information Regarding Steam Generator Tube Inservice Inspection Performed During the Spring 2013 Refueling Outage
NL-13-143, Response to Request for Additional Information Regarding Steam Generator Tube Inservice Inspection Performed During-the Spring 2013 Refueling Outage29 October 2013Indian PointResponse to Request for Additional Information Regarding Steam Generator Tube Inservice Inspection Performed During-the Spring 2013 Refueling Outage
NL-13-139, Registration of Spent Fuel Cask Use21 October 2013Indian Point
Holtec
Registration of Spent Fuel Cask Use
NL-13-127, 10 CFR 50.59(d) Report for Indian Point Energy Center Unit 330 September 2013Indian Point10 CFR 50.59(d) Report for Indian Point Energy Center Unit 3
NL-13-128, 10 CFR 72.48(d)(2) Report for Indian Point Energy Center Unit No. 330 September 2013Indian Point10 CFR 72.48(d)(2) Report for Indian Point Energy Center Unit No. 3
NL-13-120, Registration of Unit 3 Spent Fuel Cask Use10 September 2013Indian Point
Holtec
Registration of Unit 3 Spent Fuel Cask Use
NL-13-032, Technical Specification 5.6.8 - IP3 Steam Generator Tube Inspection Report - Spring 2013 Refueling Outage15 August 2013Indian PointTechnical Specification 5.6.8 - IP3 Steam Generator Tube Inspection Report - Spring 2013 Refueling Outage
NL-13-111, Independent Spent Fuel Storage Installation (ISFSI) 30 Days of Using a Cask Use6 August 2013Indian PointIndependent Spent Fuel Storage Installation (ISFSI) 30 Days of Using a Cask Use
NL-13-099, Response to Request for Additional Information Regarding Relief Request IP2-ISI-RR-16 for Reactor Vessel Weld Examination25 July 2013Indian PointResponse to Request for Additional Information Regarding Relief Request IP2-ISI-RR-16 for Reactor Vessel Weld Examination
NL-14-079, Operator Licensing Examination Data9 July 2013Indian PointOperator Licensing Examination Data
NL-13-031, Submittal of 2013 Summary Reports for Inservice Inspection and Repairs or Replacements18 June 2013Indian PointSubmittal of 2013 Summary Reports for Inservice Inspection and Repairs or Replacements
ML13196A0124 June 2013Indian PointNRR E-mail Capture - Four Questions
NL-13-029, 2012 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report29 May 2013Indian Point2012 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report
NL-13-027, Submittal of 2012 Annual Radiological Environmental Operating Report15 May 2013Indian PointSubmittal of 2012 Annual Radiological Environmental Operating Report
NL-13-082, Report on Inoperable Core Exit Thermocouple10 May 2013Indian PointReport on Inoperable Core Exit Thermocouple
NL-13-028, Indian Point, Units 1, 2 and 3 - 2012 Annual Radioactive Effluent Release Report1 May 2013Indian PointIndian Point, Units 1, 2 and 3 - 2012 Annual Radioactive Effluent Release Report
NL-13-028, 2012 Annual Radioactive Effluent Release Report1 May 2013Indian Point2012 Annual Radioactive Effluent Release Report
NL-13-0303, Submittal of Revised Core Operating Limits Report18 April 2013Indian PointSubmittal of Revised Core Operating Limits Report
NL-13-026, 2012 Annual Environmental Protection Plan Report18 April 2013Indian Point2012 Annual Environmental Protection Plan Report
NL-13-033, 2012 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report28 February 2013Indian Point2012 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report
NL-13-038, Event Report for Discovery of a Condition That Prevented Immediate Protective Actions to Avoid Exposures to Radiation from Byproduct Material19 February 2013Indian PointEvent Report for Discovery of a Condition That Prevented Immediate Protective Actions to Avoid Exposures to Radiation from Byproduct Material
NL-12-180, Registration of Unit 3 Spent Fuel Cask Use17 December 2012Indian PointRegistration of Unit 3 Spent Fuel Cask Use