ML21123A24022 February 2022PRM-50-112 - Congressional Letters, Denial of Petition for Rulemaking Determining Which Structures, Systems, and Components and Functions Are Important to Safety
ML18180A4182 July 2018Harris
Brunswick
Audit Plan for Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components Forr Nuclear Power Reactors (EPID L-2018-LLA-0008; L-2018-LLA-0034)
ML16335A34412 December 2016HarrisRequest for Withholding Information from Public Disclosure
ML16300A18027 October 2016HarrisVerbal Authorization of Relief Request I3R-16, for Reactor Vessel Closure Head Penetration Nozzle Repair Technique, Inservice Inspection Program -Third 10-Year Interval
ML16235A23817 October 2016Harris
Robinson
Summary of the July 12-13, 2016 Audit Supporting the U.S. Nuclear Regulatory Commission Review of DPC-NE-1008-P, Nuclear Design Methodology Using CASMO-5/SIMULATE-3 for Westinghouse Reactors
ML16267A02929 September 2016HarrisSFP Pre-Submittal Meeting Slides - BWR Storage Rack Inserts, Updated NCS Analysis at Harris Nuclear Plant
ML16040A23129 February 2016Harris
Robinson
Request for Withholding Information from Public Disclosure for Shearon Harris Nuclear Power Plant, Unit 1, and H.B. Robinson Steam Electric Plant, Unit 2
ML16028A1978 February 2016HarrisRequest for Additional Information Regarding License Amendment Request for a Temporary Change to Technical Specifications for the 'A' Emergency Service Water Pump Replacement
ML15342A2058 January 2016RobinsonRegulatory Audit in Support of License Amendment Request to Adopt NFPA 805
ML15342A0436 January 2016HarrisSupplemental Safety Evaluation to Relief Request I3R-15 for Reactor Vessel Closure Head Penetration Nozzle Repair Technique, Inservice Inspection Program - Third 10-Year Interval
ML15343A07123 December 2015RobinsonSeptember 22-26, 2014, Summary of H. B. Robinson Steam Electric Plant, Unit 2 - Audit Associated with License Amendment Request to Transition to the National Fire Protection Association 805 Standard
ML15343A06523 December 2015RobinsonSupplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits
ML15344A03017 December 2015Harris
Robinson
Request for Additional Information Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5, Thermal Hydraulic Statistical Core Design Methodology (MF5872/MF5873)
ML15309A7281 December 2015Harris
Robinson
Acceptance of Requested Licensing Action Regarding Duke Energy Progress, Inc. Application to Revise Technical Specifications to Adopt Methodology Report
ML15202A47524 September 2015HarrisSummary of Meeting with Duke Energy Progress, Inc. to Discuss Shearon Harris Nuclear Power Plant, Unit 1, Proposed License Amendment Request Regarding Technical Specifications for the Pressurizer and Main Steam Line Safety Valves (MF6233)
ML15222B1758 September 2015RobinsonIssuance of Amendment to Modify Technical Specification 3.8.1, Diesel Generator Testing Requirements
ML15215A65110 August 2015Harris
Robinson
Duke Energy Progress, Inc., for H. B. Robinson, Unit 2 and Shearon Harris, Unit 1, Request for Additional Information Regarding Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5 (TAC Nos. MF5872
ML15159A6026 July 2015BrunswickOrder Approving Direct Transfer of Licenses and Approving Conforming Amendments
ML15159A6776 July 2015BrunswickFRN, Direct Transfer of Licenses; Order; Issuance
ML15159A6326 July 2015Harris
Brunswick
Letter Approving Direct Transfer of Control of Licenses and Conforming Amendments
ML15107A42517 April 2015Harris4/20/2015, Forthcoming Closed Meeting with Duke Energy Progress, Inc. to Discuss Shearon Harris Nuclear Power Plant, Unit 1, Relief Request I3R-15 Revision and Supplement, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspe
ML14125A4719 May 2014SurryRelief from the Requirements of the ASME Code
ML14115A19930 April 2014SurryRelief from the Requirements of the ASME OM Code
ML14113A34625 April 2014SurryRelief from the Requirements of the ASME Code
ML14073A40524 April 2014SurryIssuance of Amendment for the Technical Specifications Changes Related to Snubber Surveillance Requirements
ML14111A24123 April 2014SurryRelief from the Requirements of the ASME Code
IR 05000250/201300224 April 2013Turkey PointIR 05000250-13-002, 05000251-13-002, on 01/01/2013 - 03/31/2013, Turkey Point Nuclear Power Plant, Units 3 and 4, Component Design Basis Inspection, Occupational ALARA Planning and Controls, and Problem Identification and Resolution
IR 05000250/201200530 January 2013Turkey PointIR 05000250-12-005 & 05000251-12-005, 10/01/2012 - 12/31/2012, Turkey Point Nuclear Power Plant, Units 3 and 4, Licensed Operator Requalification Program
IR 05000250/20100106 January 2011Turkey PointIR 05000250-10-010; Florida Power & Light Company; 11/29/210 - 12/03/2010; Turkey Point Nuclear Plant, Unit 3, Inspection Report
IR 05000250/201000228 April 2010Turkey PointIR 05000250-10-002 and 05000251-10-002, on 01/01 - 03/31/2010, Turkey Point, Units 3 & 4, Integrated Inspection Report, Plant Modifications
IR 05000250/200800717 April 2008Turkey PointIR 05000250-08-007, 05000251-08-007 on 03/17/08 - 03/21/08 for Turkey Point - NRC Follow-Up Problem Identification and Resolution Inspection Report
IR 05000250/200700924 January 2008Turkey PointIR 05000250-07-009, 05000251-07-009; on 12/17/2007 - 12/21/2007; Turkey Point Nuclear Plant, Units 3 & 4; Follow-up Inspection of Substantive Cross-cutting Issue in the Area of Identification and Resolution of Problems