Semantic search

Jump to navigation Jump to search
 Start dateSiteTitleDescription
IR 05000244/20180011 May 2018GinnaLLC - Integrated Inspection Report 05000244/2018001
ML16251A25213 June 2016SusquehannaE-mails Pertaining to Susq PI&R Team Inspection 2016-008-(Corresponds with ML16246A291)
ML16110A05618 April 2016GinnaApril 12, 2016, Summary of Public Annual Assessment Meeting for R.E. Ginna Nuclear Power Plant
ML16109A26412 April 2016Ginna4/12/2016 - R.E. Ginna Nuclear Power Plant Annual Assessment Meeting - Sign-In Sheet and Summary Data Sheet
IR 05000482/20150098 December 2015Wolf CreekNRC Inspection Report 05000482/2015009
ML15260A43116 September 2015Nine Mile PointRegion I Response to T. Gurdziel Email, Subj: Response to Event Number 51369 at Exelon/Nine Mile Point Unit 1
IR 05000498/20150017 May 2015South TexasIR 05000498/2015001 and 05000499/2015001, 01/01/2015 - 04/04, 2015, South Texas Project, Units 1 and 2. Integrated Report
IR 05000482/20150017 May 2015Wolf CreekIR 05000482/2015001; on 01/01/2015 - 03/28/2015; Wolf Creek Generating Station Integrated Resident and Regional Report: Maintenance Risk Assessments and Emergent Work Control, and Operability Determinations and Functionality Assessments
ML14035A55030 January 2014Calvert CliffsRGN-I/PB 1 Response to Email from T. Gurdziel PNO-1-14-001, Calvert Cliffs
PNO-I-14-001, Calvert Cliffs Dual Unit Trip Following the Loss of the 21 13kV Bus27 January 2014Calvert CliffsPNO-I-14-001 - Calvert Cliffs Dual Unit Trip Following the Loss of the 21 13kV Bus
IR 05000388/201300721 March 2013SusquehannaIR 05000388-13-007, 01/14/203 - 02/07/2013, Susquehanna Steam Electric Station, Unit 2
IR 05000387/201300721 March 2013SusquehannaIR 05000388-13-007, 01/14/203 - 02/07/2013, Susquehanna Steam Electric Station, Unit 2
IR 05000277/201200414 November 2012Peach BottomIR 05000277-12-004 and 05000278-12-004; Peach Bottom Atomic Power Station, 07-01-12 - 09-30-12; NRC Integrated Inspection Report
IR 05000277/201200314 August 2012Peach BottomIR 05000277-12-003; 05000278-12-003; 04/01/12 - 06/30/12; Peach Bottom NRC Integrated Inspection Report; NRC Office of Investigations Report 1-2012-011; and Exercise of Enforcement Discretion
IR 05000352/201100227 April 2011LimerickIR 05000352-11-002, 05000353-11-002, on 01/01/2011 - 03/31/2011, Limerick Generating Station, Unit 1 & 2, Problem Identification and Resolution
IR 05000277/20100053 February 2011Peach BottomIR 05000277-10-005 and 05000278-10-005; on 10/01/2010 - 12/31/2010 Peach; Bottom Atomic Power Station (Pbaps), Units 2 and 3; Surveillance Testing
IR 05000352/201000524 January 2011LimerickIR 05000352-10-005, 05000353-10-005, on 10-01-2010 - 12-31-2010, Limerick Generating Station, NRC Integrated Inspection Report
IR 05000277/20090058 February 2010Peach BottomIR 05000277-09-005, 05000278-09-005; 10/01/2009 - 12/31/2009; Peach Bottom Atomic Power Station, Units 2 and 3; Flood Protection Measures; Problem Identification and Resolution (Pi&R)