Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20155J535 | 19 October 1988 | Safety Evaluation Supporting Licensee 861110 Request for Dismantlement & Decontamination of AGN-201 Reactor Facility & Termination of License R-127 | |
ML20127J198 | 17 June 1985 | Safety Evaluation Supporting Amend 5 to License R-127 | Power change |
ML20107E059 | 31 December 1984 | Ctr for Nuclear Studies Memphis State Univ,1984 Annual Rept Nuclear Reactor Operations | Shutdown Margin Earthquake |
ML20087J744 | 31 December 1983 | Annual Rept of Nuclear Reactor Operations,1983 | Shutdown Margin |
ML20076C021 | 29 July 1983 | Advises That Final Deficiency Rept DER 82-68 Re Underground Cables to Startup Transformers Not Carrying Full Load Current at Max Site Soil Temp Will Be Submitted by 830916. Delay Due to Extensive Investigaion & Evaluation | |
ML20069B091 | 25 February 1983 | Nuclear Reactor Operations Annual Rept for 1982 | Safe Shutdown Shutdown Margin Earthquake Power change |
ML20063D167 | 12 August 1982 | Update 2 RO 82-1:on 820811,faulty Microswitch Discovered in Shield Water Level Safety Channel.Caused by Corrosion Buildup in Internal Microswitch Mechanism.Microswitch Replaced & Tested.Normal Reactor Operations Resumed | |
ML20009F422 | 11 June 1981 | RO 81-1:on 810608,unscheduled Power Outage Resulted in Reactor Shutdown.Caused by Loss of Reactor Control Power, Interrupting Electrical Current to Control Rod Holding Magnets.Magnet Assemblies Returned to Correct Position | |
ML19350C154 | 31 March 1981 | Ctr for Nuclear Studies,Memphis State Univ,1980 Annual Rept,Nuclear Reactor Operations. | Safe Shutdown Shutdown Margin |
ML19345G495 | 31 March 1981 | Interim Deficiency Rept Re 1-inch Diameter Hilti kwik-bolt Anchors (M-26).Evaluation to Determine Significance of Problem at Plant Site Per Ae Review Is Not Finalized.Final Rept Will Be Provided by 810501 | |
ML19296D164 | 29 February 1980 | 1979 Annual Rept of Nuclear Reactor Operations. | Shutdown Margin Emergency Lighting |
ML19290B743 | 26 November 1979 | Followup Rept to RO-79-3:on 791116,during Prestartup,Shield Water Level Float Switch Assembly Failed to Initiate Protective Trip Signal.Caused by Gradual Buildup of Corrosion Products in Internal Mechanism of Microswitch | |
ML19273B350 | 13 March 1979 | Followup to RO 79-2 on 790305: Electric Power to Facility Momentarily Interrupted,Causing Shutdown in Form of Silent Reactor Scram.No Corrective Action Feasible |