Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20237C518 | 19 August 1998 | Safety Evaluation Supporting Order Terminating Facility License R-81 for Cintichem,Inc Research Reactor | |
ML20211C576 | 22 September 1997 | Bedrock Dose Assessment Rept. W/One Oversize Drawing | |
ML20149G920 | 27 June 1997 | Final Survey Repts for Cintichem Outdoor Areas Inside of Former RCA, Chapters 13 & 14 | |
ML20070S299 | 31 December 1990 | Annual Rept for 1990 for Centichem,Inc Nuclear Reactor. W/ | |
ML20055F914 | 17 July 1990 | Safety Evaluation Supporting Amend 26 to License R-81 | |
ML20236D212 | 14 March 1989 | Safety Evaluation Supporting Amend 25 to License R-81 | |
ML20248K234 | 31 December 1988 | Annual Rept for 1988 | |
ML20151W505 | 16 August 1988 | Safety Evaluation Supporting Amend 24 to License R-81 | |
ML20153B034 | 31 December 1987 | Annual Rept for 1987 for Cintichem,Inc Nuclear Reactor | |
ML20214J177 | 31 December 1986 | Annual Operating Rept for 1986 | |
ML20113C641 | 31 December 1984 | Annual Rept for 1984 for Union Carbide Nuclear Reactor (Ucnr) | |
ML20087L425 | 31 December 1983 | Annual Rept for 1983 | |
ML20072P364 | 28 March 1983 | Annual Operating Summary,1982 | |
ML20042C102 | 23 March 1982 | Annual Operating Rept,1981. | |
ML19350C730 | 31 March 1981 | Annual Operating Rept 1980. | |
ML20003E643 | 31 March 1981 | Annual Operating Summary,1980, Page 5 | |
ML19323F706 | 31 May 1980 | Revisions to Sar,Submitted in Support of Application for Renewal of License R-81 | |
ML19323F700 | 23 May 1980 | Annual Financial Rept 1979 | Coatings Incorporated by reference |
ML19323F288 | 15 May 1980 | RO 50-54/80-01:during Reactor Startup,Control Rod Found Separated Between End Piece & Poison Section.Cause Unstated. Silver Indium Rods Inspected.Startup Reactivity Check Procedures Being Revised to Prevent Misinterpretation | Shutdown Margin |
ML19309H492 | 5 May 1980 | Ro:On 800503,poison Section of Control Rod Assembly Found Separated from Rod Drive.Failure Did Not Compromise Shutdown Margin.Rod Replaced & Reactor Returned to Power. Remaining Rods Will Be Closely Monitored Until Insp | Shutdown Margin |
ML19309C397 | 31 March 1980 | Annual Operating Rept 1979, Reporting Facility Mod & Major Maint | |
ML19294B170 | 18 February 1980 | Ro:On 800207,control Rod Withdrawal Inhibit on Intermediate Power Level Period Recorder Found Set at Less than 30-s Setpoint.Caused by Nut Loosened During 800207 Maint Allowing Setpoint to Be Changed During Channel Check | |
ML19271A009 | 8 February 1980 | Ro:On 800207,control Rod Withdrawal Inhibit on Intermediate Power Level Period Monitor Set Below Specified Setpoint. Possibly Caused by Inadvertent Movement During Channel Check.Withdrawal Inhibit Adjusted to Proper Setpoint |