Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20202B389 | 15 September 1997 | Rev 1 to, Technical Evaluation of Duane Arnold Energy Ctr Analysis of Ampacity Loads for Fire Barriers Clad Power Cables | Fire Barrier |
ML20149L649 | 31 August 1995 | Plant TER on IPE Front End Analysis | Mission time Internal Flooding Probabilistic Risk Assessment Squib Hardened vent Backfit |
ML20149L654 | 31 August 1995 | Plant TER on IPE Back-End Submittal | Mission time Hardened vent |
ML20094P188 | 31 May 1995 | TER, Duane Arnold Energy Ctr Pump & Valve Inservice Testing Program,Rev 13,Third 10-Yr Interval | Reactor Vessel Water Level Stroke time Excess Flow Check Valve |
ML20063E906 | 30 December 1993 | Parametric Study of Potential for BWR ECCS Blockage Due to LOCA Generated Debris, Vol 2,Parts 1 & 2 | |
ML112380516 | 12 November 1993 | TER to Request for TS Change,Ielp,Cipc & Cbpc,Daec. | |
ML20118C095 | 1 August 1992 | Technical Evaluation of Duane Arnold Energy Ctr Emergency Svc Water | |
ML20246B815 | 30 April 1989 | Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Duane Arnold,Enrico Fermi-2,Hope Creek,Lasalle County 1 & 2, Limerick 1 & 2,Millstone 1,Monticello,Nine Mile Point 1 & 2 & Oyster Creek, Technical Evaluation Rept | |
ML20196D878 | 18 February 1988 | Technical Evaluation Rept of Dcrdr for Iowa Electric Light & Power Co Duane Arnold Energy Ctr | |
ML20215M088 | 31 May 1987 | Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components, Duane Arnold, Informal Rept | |
ML20214R068 | 30 April 1987 | Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Arnold,Brunswick-1 & 2, Informal Rept | |
ML20211P068 | 17 July 1986 | Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Duane Arnond Energy Ctr, Supplementary Technical Evaluation Rept | |
ML20132D628 | 28 June 1985 | Masonry Wall Design,Duane Arnold Energy Ctr, Technical Evaluation Rept | Safe Shutdown Earthquake Operating Basis Earthquake Design basis earthquake Earthquake |
ML20091G101 | 30 May 1984 | Control of Heavy Loads (C-10),Iowa Electric Light & Power Co,Duane Arnold Energy Ctr, Technical Evaluation Rept | Safe Shutdown Control of Heavy Loads |
ML20126E994 | 7 December 1982 | Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 | |
ML20039A115 | 10 December 1981 | Masonry Wall Design:Ia Electric Light & Power Co,Duane Arnold Energy Ctr, Interim Technical Evaluation Rept | Safe Shutdown Earthquake Tornado Generated Missile |
ML20039A947 | 30 November 1981 | Aquatic Impacts from Operation of Three Midwestern Nuclear Power Stations.Duane Arnold Energy Center,Unit No. 1 Environmental Appraisal Report | |
ML20038A769 | 31 October 1981 | Aquatic Impacts from Operation of Three Midwestern Nuclear Power Stations | Grab sample Biofouling |
ML112231554 | 14 May 1981 | Override & Reset of Control Circuitry in Ventilation/Purge Isolation & Other Engineered Safety Feature Sys,Duane Arnold Energy Center, Technical Evaluation Rept | |
ML19341B386 | 31 January 1981 | Safety Evaluation Rept,Inservice Testing Program,Duane Arnold Energy Ctr. | Stroke time Exemption Request |
ML19210E036 | 15 November 1979 | IE-116-B, Rept of Evaluation of Stresses in Recirculation Inlet Nozzle Safe-End at Brunswick Steam Electric Plant Units 1 & 2, Final Rept by Parameter,Inc.Recommends Continued Inservice Surveillance | Stress corrosion cracking |
ML112371640 | 16 March 1979 | Rept of Metallurgical Examination & Stress Evaluation of Recirculation Inlet Nozzle Safe-End Cracking, Rept IE-116 | |
ML19269D966 | 31 January 1979 | Final Rept on Examination of Inconel Safe-End from Duane Arnold. |