Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20202B38915 September 1997Rev 1 to, Technical Evaluation of Duane Arnold Energy Ctr Analysis of Ampacity Loads for Fire Barriers Clad Power CablesFire Barrier
ML20149L64931 August 1995Plant TER on IPE Front End AnalysisMission time
Internal Flooding
Probabilistic Risk Assessment
Squib
Hardened vent
Backfit
ML20149L65431 August 1995Plant TER on IPE Back-End SubmittalMission time
Hardened vent
ML20094P18831 May 1995TER, Duane Arnold Energy Ctr Pump & Valve Inservice Testing Program,Rev 13,Third 10-Yr IntervalReactor Vessel Water Level
Stroke time
Excess Flow Check Valve
ML20063E90630 December 1993Parametric Study of Potential for BWR ECCS Blockage Due to LOCA Generated Debris, Vol 2,Parts 1 & 2
ML11238051612 November 1993TER to Request for TS Change,Ielp,Cipc & Cbpc,Daec.
ML20118C0951 August 1992Technical Evaluation of Duane Arnold Energy Ctr Emergency Svc Water
ML20246B81530 April 1989Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Duane Arnold,Enrico Fermi-2,Hope Creek,Lasalle County 1 & 2, Limerick 1 & 2,Millstone 1,Monticello,Nine Mile Point 1 & 2 & Oyster Creek, Technical Evaluation Rept
ML20196D87818 February 1988Technical Evaluation Rept of Dcrdr for Iowa Electric Light & Power Co Duane Arnold Energy Ctr
ML20215M08831 May 1987Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components, Duane Arnold, Informal Rept
ML20214R06830 April 1987Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Arnold,Brunswick-1 & 2, Informal Rept
ML20211P06817 July 1986Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Duane Arnond Energy Ctr, Supplementary Technical Evaluation Rept
ML20132D62828 June 1985Masonry Wall Design,Duane Arnold Energy Ctr, Technical Evaluation ReptSafe Shutdown Earthquake
Operating Basis Earthquake
Design basis earthquake
Earthquake
ML20091G10130 May 1984Control of Heavy Loads (C-10),Iowa Electric Light & Power Co,Duane Arnold Energy Ctr, Technical Evaluation ReptSafe Shutdown
Control of Heavy Loads
ML20126E9947 December 1982Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982
ML20039A11510 December 1981Masonry Wall Design:Ia Electric Light & Power Co,Duane Arnold Energy Ctr, Interim Technical Evaluation ReptSafe Shutdown Earthquake
Tornado Generated Missile
ML20039A94730 November 1981Aquatic Impacts from Operation of Three Midwestern Nuclear Power Stations.Duane Arnold Energy Center,Unit No. 1 Environmental Appraisal Report
ML20038A76931 October 1981Aquatic Impacts from Operation of Three Midwestern Nuclear Power StationsGrab sample
Biofouling
ML11223155414 May 1981Override & Reset of Control Circuitry in Ventilation/Purge Isolation & Other Engineered Safety Feature Sys,Duane Arnold Energy Center, Technical Evaluation Rept
ML19341B38631 January 1981Safety Evaluation Rept,Inservice Testing Program,Duane Arnold Energy Ctr.Stroke time
Exemption Request
ML19210E03615 November 1979IE-116-B, Rept of Evaluation of Stresses in Recirculation Inlet Nozzle Safe-End at Brunswick Steam Electric Plant Units 1 & 2, Final Rept by Parameter,Inc.Recommends Continued Inservice SurveillanceStress corrosion cracking
ML11237164016 March 1979Rept of Metallurgical Examination & Stress Evaluation of Recirculation Inlet Nozzle Safe-End Cracking, Rept IE-116
ML19269D96631 January 1979Final Rept on Examination of Inconel Safe-End from Duane Arnold.