ML20138J839 | 10 December 1996 | WPPSS Nuclear Project,Unit 2 TER on IPE Submittal Human Realiability Analysis, Final Rept | Hardened vent |
ML20138J827 | 22 October 1996 | Technical Evaluation Rept on IPE Front End Analysis | Reactor Vessel Water Level Mission time Probabilistic Risk Assessment Backfit |
ML20138J833 | 30 September 1996 | WPPSS Nuclear Project Unit 2 TER on IPE Back End Analysis | Finite Element Analysis Hardened vent |
ML17291B163 | 31 August 1995 | Technical Evaluation Rept on Second 10-yr Interval Inservice Insp Program Plan:Washington Public Power Supply Sys,Nuclear Project,Unit 2 | Fire Barrier Hydrostatic VT-2 Incorporated by reference Liquid penetrant |
ML20071J424 | 31 July 1994 | Technical Evaluation Rept,Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01,WNP-2 | |
ML17291A263 | 15 July 1994 | BNL Technical Ltr Rept On-Site Followup Assessment of Post- Fire Safe Shutdown Startup Issues at WNP-2, Conducted on 940620-24 | Hot Short Safe Shutdown Fire Barrier |
ML20058L759 | 27 March 1993 | TER, 'Bwr Transient Analysis Model' WPPSS-FTS-129,Rev 1, for WPPSS WNP-2 | Feedwater Controller Failure |
ML17289A945 | 11 September 1992 | TER of TR WPPS-FTS-127(Qualification of Core Physics Methods for BWR Design & Analysis) for Wpps 2. | |
ML17286A774 | 28 February 1991 | Technical Evaluation Rept,Pump & Valve Inservice Testing Program Wppss Nuclear Project 2. | Stroke time Scram Discharge Volume Excess Flow Check Valve Power Operated Valves |
ML20065C663 | 30 September 1989 | Final Technical Evaluation Rept on Response from WPPSS to Generic Ltr 88-01 Pertaining to Washington Nuclear Plant 2 | Weld Overlay |
ML20195E927 | 30 April 1988 | Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Washington Nuclear Plant-2 | |
ML20151C234 | 31 March 1988 | Technical Evaluation Rept for Evaluation of Offsite Dose Calculation Manual Through Amend 4 Washington Nuclear Plant Unit 2 | Grab sample Offsite Dose Calculation Manual |
ML20235V152 | 31 August 1987 | Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 | |
ML17279A393 | 30 June 1987 | Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components: Washington Nuclear Plant-2, Informal Rept | |
ML20245A419 | 23 March 1987 | Review of WPPSS Nuclear Project 2 SPDS, Technical Evaluation Rept | |
ML20134J509 | 30 June 1985 | Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, LaSalle County Station & WPPSS-2 | |
ML20244D441 | 30 June 1985 | Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, LaSalle County Station Units 1 & 2 & Washington Nuclear Plant Unit 2. Contains Info for LaSalle | |
ML17277B782 | 22 May 1985 | Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Washington Nuclear Project 2. | |
ML20136G180 | 31 March 1985 | Conformance to Reg Guide 1.97,WPPSS Nuclear Project 2 | Fuel cladding |
ML20213E536 | 31 May 1983 | Control of Heavy Loads at Nuclear Power Plants,Washington Nuclear Project 2 (Phase II-Interim), Technical Evaluation Rept | Safe Shutdown Control of Heavy Loads |
ML20213E444 | 31 May 1983 | Control of Heavy Loads at Nuclear Power Plants,Washington Nuclear Project 2 (Phase I), Technical Evaluation Rept | Safe Shutdown Control of Heavy Loads |
ML17277A596 | 24 May 1983 | Control of Heavy Loads at Nuclear Power Plants,Washington Nuclear Project 2 (Phase II - Interim), Draft Technical Evaluation Rept | Safe Shutdown Control of Heavy Loads |
ML20112J439 | 30 April 1983 | Audit of Environ Qualification of Safety-Related Electrical Equipment at WPPSS Nuclear Project 2 | |
ML20028D523 | 31 December 1982 | Buckling of Steel Containment Shells.Task 1b:Buckling of Washington Public Power Supply Systems Plant No. 2 Containment Vessel | |
ML17272A749 | 28 September 1979 | Results of Hardness Testing & Metallurgical Examination on Feedwater Pipe Welds at Washington Nuclear Project 2. | Safe Shutdown Reactor Vessel Water Level Packing leak Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Tornado Generated Missile Earthquake Power-Operated Valves Turbine Missile |