Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
PNO-V-89-047, on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No Damage | 8 August 1989 | PNO-V-89-047:on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No Damage | Earthquake |
PNO-V-89-022, on 880403,earthquake of Magnitude of 4.5 on Richter Scale Occurred 10 Miles Northeast of San Jose,Ca. Automatic Seismic Protection Did Not Trigger Shutdown. Reactors Manually Shutdown.No Radioactive Release Occurred | 3 April 1989 | PNO-V-89-022:on 880403,earthquake of Magnitude of 4.5 on Richter Scale Occurred 10 Miles Northeast of San Jose,Ca. Automatic Seismic Protection Did Not Trigger Shutdown. Reactors Manually Shutdown.No Radioactive Release Occurred | Earthquake |
PNO-V-88-044, on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley | 27 June 1988 | PNO-V-88-044:on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley | Earthquake |
PNO-V-88-038, on 880612,earthquake Occurred on Calaveras Fault within 50 Miles of Identified Facilities.All Reactors Shutdown at Time of Earthquake.No Seismic Trips Observed. Insp Revealed No Signs of Damage at Facilities | 13 June 1988 | PNO-V-88-038:on 880612,earthquake Occurred on Calaveras Fault within 50 Miles of Identified Facilities.All Reactors Shutdown at Time of Earthquake.No Seismic Trips Observed. Insp Revealed No Signs of Damage at Facilities | Earthquake |
ML20237H334 | 29 July 1987 | Notice of Violation from Insp on 870713-16.Violations Noted: Reactor Head Cooling (Rhc) Audits of Reactor Operations Not Performed for First & Second Quarters of 1986 & 30-day Rept for Failure to Conduct Rhc Audits Not Initiated by 870713 | |
IR 05000224/1987001 | 28 July 1987 | Insp Rept 50-224/87-01 on 870713-16.Violations Noted.Major Areas Inspected:Environ Monitoring & Emergency Preparedness Programs,Reactor Operator Requalification Program,Audits & Reviews,Experiments & Health Physics Program | |
ML20207N000 | 8 January 1987 | Corrected PNO-V-87-004A:on 870107,Region V Notified That Chancellor Requested Board of Regents to Approve Funding for Decommissioning of Triga Mark III Reactor Facility.Licensee Issued Press Release Re Plans for Decommissioning | |
ML20214V764 | 10 September 1986 | Exam Rept 50-224/OL-86-01 on 860902-03.Exam Results: Candidate Passed Written & Oral Exams.Exam & Answer Key Encl | Shutdown Margin Earthquake |
IR 05000224/1986001 | 16 May 1986 | Partially Withheld Safeguards Insp Repts 50-224/86-01 & 50-224/86-02 on 860422-24 & 0502 (Ref 10CFR2.790).No Noncompliance Noted.Major Areas Inspected:Plans,Procedures & Reviews Fixed Site Physical Protection of SNM | |
PNO-V-86-014, on 860331,earthquake W/Magnitude of 5.3 on Richter Scale Occurred Approx 10 Miles East of Fremont,Ca.No Damage Observed at Research Reactor Facilities.Rancho Seco Did Not Feel Effects of Earthquake | 31 March 1986 | PNO-V-86-014:on 860331,earthquake W/Magnitude of 5.3 on Richter Scale Occurred Approx 10 Miles East of Fremont,Ca.No Damage Observed at Research Reactor Facilities.Rancho Seco Did Not Feel Effects of Earthquake | Earthquake |
ML20136D608 | 6 December 1985 | Exam Rept 50-224/OL-85-01 on 851112-13.Exam Results:Reactor Operator Candidate Passed Exams | Shutdown Margin High Radiation Area Fuel cladding |
IR 05000224/1985001 | 31 May 1985 | Insp Rept 50-224/85-01 on 850528.No Violation or Deviation Noted.Major Areas Inspected:Actions Taken to Correct Findings Identified in Insp Rept 50-224/84-01 & Reexam of Radiation Protection Program & Reactor Operations Program |