ML20210R805 | 10 August 1999 | Startup Test Rept for Cycle 7 | Power change |
ML20211F440 | 26 September 1997 | Cycle 6 Startup Test Rept for Seabrook Station,Unit 1 | Power change |
ML20100G835 | 16 February 1996 | Startup Test Rept,Cycle 5. W/ | |
ML20073A734 | 12 September 1994 | Cycle 4 Startup Test Rept | Power change |
ML20128G143 | 5 February 1993 | Cycle 3 Startup Test Rept for Seabrook Station Unit 1 | Power change |
ML20128C711 | 21 January 1993 | Reactor Containment Bldg Integrated Leakage Rate Test,Types A,B & C Periodic Test | Temporary Modification FLEX |
ML20091P579 | 29 January 1992 | Cycle 2 Startup Test Rept for Seabrook Station,Unit 1. W/ | Power change |
ML20065F842 | 27 September 1990 | Suppl 3 to Initial Startup Rept for June-Aug 1990. W/ | Safe Shutdown Grab sample Anticipated operational occurrence Temporary Modification |
ML20065E027 | 13 September 1990 | Suppl 2 to Seabrook Station Initial Startup Rept for June- Aug 1990 | |
ML20043G241 | 13 June 1990 | Suppl 1 to New Hampshire Yankee Seabrook Station Initial Startup Rept for Jul 1989 - May 1990. W/900613 Ltr | Stroke time |
ML20012D474 | 13 March 1990 | New Hampshire Yankee Seabrook Station Initial Startup Rept for Oct 1986 - June 1989. W/900313 Ltr | Shutdown Margin High Radiation Area Stroke time Temporary Modification |
ML20006E573 | 30 January 1990 | Reactor Containment Bldg Integrated Leakage Rate Test Types A,B & C,Periodic Test. W/900209 Ltr | |
ML20207J068 | 5 August 1988 | Rept for Heat Number L4517 | |
ML20141J593 | 30 April 1986 | ASTM E119-83 Std Methods of Fire Tests of Bldg Const & Matls of Metal Siding Partition Wall Assembly | |
ML20211E610 | 25 April 1986 | Technical Rept TR-20422(842), Seabrook Nuclear Power Station Unit 1 Reactor Bldg Structural Integrity Test Results. App J & K to Containment Structural Integrity Test & Chronological Log Encl | |
ML20141J587 | 31 March 1986 | ASTM E152-81 Std Methods of Fire Tests of Door Assemblies: 3-H Fire Resistance Test of Single Swinging Steel Door Assembly,EM414 Per United Engineers & Constructors Spec 9763.006-24-13 | B.5.b Mitigating Strategies |
ML20199G196 | 31 March 1986 | Reactor Containment Bldg Integrated Leak Rate Test | |
ML20198E744 | 10 January 1985 | Test Rept for Full Flow Testing of 16,18 & 20-Inch Main Steam Safety Valve Vent Stacks for Yankee Atomic Electric Co | |
ML20069N291 | 31 August 1982 | Tests of Anchorages to Determine Effects of Prying, Final Rept | |
ML20070H917 | 27 July 1982 | Test Repts on Emergency Spray Sys Testing Using Transco Therma-Wrap | |
ML20052B626 | 22 January 1982 | Pipe Rupture Restraints - Final Stress Rept. |