Issue date | Title | Topic | |
---|---|---|---|
ML20204B632 | 21 March 1999 | Plant Referenced Simulation Facility Four Year Performance Testing Rept | Loop seal Squib Residual transfer Scram Discharge Volume Fuel cladding |
B110073, Rev 1 to GE-NE-B1100732-01, FitzPatrick Reactor Pressure Vessel Surveillance Matls Testing & Analysis Rept of 120 Degree Capsule at 13.4 Efpy | 28 February 1998 | Rev 1 to GE-NE-B1100732-01, FitzPatrick Reactor Pressure Vessel Surveillance Matls Testing & Analysis Rept of 120 Degree Capsule at 13.4 Efpy | |
ML20198G721 | 3 April 1997 | Hot Rolled XM-19 Stainless Steel Core Shroud Tie-Rod Matl - Crevice Corrosion Investigation | |
ML20136H377 | 11 March 1997 | Rev 0 to Power Uprate Startup Test Rept for Cycle 13 | Shutdown Margin Temporary Modification Downpower Flow Induced Vibration |
JAFP-95-0291, Ja FitzPatrick Cycle 12 Startup Testing Rept | 23 June 1995 | Ja FitzPatrick Cycle 12 Startup Testing Rept | Shutdown Margin Stroke time |
ML20081H014 | 21 March 1995 | Four Yr Performance Testing Rept (Per 10CFR55.54(b)) | Shutdown Margin Fire Barrier Stroke time Squib Scram Discharge Volume Fuel cladding |
ML20065G694 | 9 October 1990 | Reactor Containment Bldg Integrated Leakage Rate Test | |
JAFP-90-0697, Cycle 10 Startup Testing Rept | 17 September 1990 | Cycle 10 Startup Testing Rept | Shutdown Margin Stroke time Flow Induced Vibration |
JAFP-89-0140, Cycle 9 Startup Testing Rept | 21 February 1989 | Cycle 9 Startup Testing Rept | Shutdown Margin Stroke time Flow Induced Vibration |
JAFP-87-0534, Reactor Containment Bldg Integrated Leakage Rate Test Types A,B & C Periodic Test | 30 April 1987 | Reactor Containment Bldg Integrated Leakage Rate Test Types A,B & C Periodic Test | |
ML20155G439 | 25 April 1986 | Ja Fitzpatrick Nuclear Power Plant Reactor Pressure Vessel Surveillance Matls Testing & Fracture Toughness Analysis | |
JAFP-85-0682, Cycle 7 Startup Test Rept | 21 August 1985 | Cycle 7 Startup Test Rept | Shutdown Margin |
ML20137F793 | 31 May 1985 | Reactor Containment Bldg Integrated Leakage Rate Test,Types A,B & C Periodic Tests for May 1983 - May 1985, Ja Fitzpatrick Nuclear Power Plant | Packing leak |
ML20106F430 | 30 September 1984 | Recirculation Sys Welds - Sept 1984 Outage | |
ML20082M780 | 18 November 1983 | Cycle 6 Startup Test Rept | Shutdown Margin |
ML20054J192 | 31 May 1982 | Voltage Profile Test Rept | Reserve Station Service Transformer |
ML20052H958 | 7 May 1982 | Cycle 5 Startup Test Rept. | Shutdown Margin Power change |
ML20079F783 | 7 December 1981 | Certification Test Rept for Mechanical Snubber PSA-3,Serial Number 8383 | |
ML20079F802 | 7 December 1981 | Certification Test Rept for Mechanical Snubber PSA-3,Serial Number 8387 | |
ML19340B629 | 7 November 1980 | Cycle 4 Startup Test Rept. | Shutdown Margin |
ML19241B289 | 18 April 1979 | Cycle III Startup Test Rept | Shutdown Margin Power change |
ML19308A288 | 6 March 1979 | Reactor Containment Bldg Integrated Leak Rate Test Type a, B & C.Periodic Tests for Jan 1976 to Nov 1978. | Packing leak |
ML20063A992 | 2 December 1976 | Design Verification Test Summary,Model 7567F | Abnormal operational transient Feedwater Controller Failure |
ML20081B969 | 20 March 1974 | Integrated Leak Rate Test:Computer Program for Primary Containment | |
ML20116N680 | 19 July 1972 | Seismic Analysis of 3-Inch,20-Inch & 24-Inch Butterfly Valve Assemblies for S&W,Agent for Pasny |