Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20206U26214 May 1999Rev 4 to Univ of Fl Training Reactor Operator Requalification & Recertification Training Program Plan
ML20205E47329 March 1999Updated Proposal Submitted to NRC to Meet 10CFR50.64 Requirements for Updating Scheduling of Uftr Conversion from HEU to LEU Fuel
ML20236X27431 July 1998Rev 2 to Univ of Fl Training Reactor Respiratory Protection Program
ML20217H7976 October 1997Proposed Tech Specs Re Corrected Figure 6.1, Uftr Organizational Chart
ML20210P56621 August 1997Proposed Tech Specs,Consisting of Page 30 Re Figure 6.1, Uftr Organizational Chart, Page 32 of Section 6.2.5, Review & Audit & Page 37 of Section 6.6.1, Operating Repts
ML20216D06913 August 1997Rev 2 to Procedure B.4, Uftr Operating ProcedureShutdown Margin
ML20116H2962 August 1996Proposed Tech Specs,Allowing Addl Months for Submittal of Routine Annual Rept Covering Activities of Reactor Facility During Previous Cy
ML20084L94331 May 1995Operator Requalification & Recertification Training Program Plan of Univ of Fl Training Reactor, for Jul 1995 Through June 1997
ML20216D05819 January 1995Rev 5 to Procedure B.1, Uftr Operating Procedure
ML20216D06219 January 1995Rev 9 to Procedure B.2, Uftr Operating Procedure
ML20072S3099 September 1994Proposed Tech Specs Re Air Particulate Monitor,Liquid Effluent Discharge,Solid Radwaste Disposal,Bases,Limitations on Experiments,Reactor Vent Sys Surveillance,Radiation Monitoring Systems & Radioactive Effluents Surveillance
ML20069G6542 June 1994Proposed TS Page 12,permitting Sanitary Sewage Sys Disposal of Aqueous Radioactive Matl in Accordance w/10CFR20.2002
ML20058K3782 December 1993Proposed Tech Specs Pages 11,12 & 40,Section 3.4.2, Ar-41 Discharge, Paragraph 3,Section 3.4.5, Liquid Effluents Discharge, Paragraph 2 & Section 7.0, ALARA, Respectively
ML20196J1747 March 1988Revised Proposed Tech Specs,Amended Per NRC 880205 Request
ML20215B1612 June 1987Proposed Tech Specs,Revising Section 3.4.3 Reactor Sys Vent, Following 861212 Violation Re Securing Core Vent Sys W/Stack Counts Above 10 Cps During Quarterly Emergency Drill
ML20215A91721 May 1987Rev 0 to Std Operating Procedure SOP-D.5 Re Preparation & Transfer of Reactor Waste Shipments
ML20133N77017 October 1985Proposed Tech Specs,Correcting Typo Noted in Amend 15
ML20076F25519 August 1983Proposed Tech Spec 6.6.3 Increasing Required Reporting Control for Changes to Facility Organization & Transient or Accident Analysis
ML19261D4638 June 1979Operator Requalification & Recertification Program for 790701-810630