ML20217H89918 October 1999SER Approving Licensee Requests for Relief NDE-R001 (Part a & B),NDE-R027,NDE-028,NDE-R029,NDE-R030,NDE-R032 & NDE-R035. Relief Request NDE-036,denied & Relief Request NDE-R-034, Deemed UnnecessaryWeld Overlay
Nondestructive Examination
VT-2
Incorporated by reference
ML20212H23822 September 1999Safety Evaluation Supporting Amend 228 to License DPR-49Anticipated operational occurrence
ML20195G9909 June 1999Safety Evaluation Supporting Amend 227 to License DPR-49
ML20206N75513 May 1999Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safey-Related Power-Operated Gate ValvesPower-Operated Valves
Backfit
ML20207G0253 March 1999SER Concluding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety- Related MOVs at Duane Arnold & That Licensee Adequately Addressed Actions Requested in GL 96-05Stroke time
ML20202B43126 January 1999Safety Evaluation Accepting Request for Approval to Use ASME Code Case N-508-1 in ISI Program for Duane Arnold Energy CtrIncorporated by reference
ML20202B38526 January 1999Safety Evaluation Addressing Thermo-Lag Related Ampacity Derating Issues.Ampacity Derating Analysis Results AcceptableFire Barrier
ML20236X53229 July 1998Safety Evaluation Re USI A-46 Program Implementation for PlantSafe Shutdown
Safe Shutdown Earthquake
Earthquake
Scaffolding
ML20236W00229 July 1998Safety Evaluation Accepting Request for Relief NDE-R020 Re Third 10-yr ISI Interval of Plant,Per 10CFR50.55a(a)(3(i)Incorporated by reference
ML20216J91716 April 1998Safety Evaluation Accepting Relief Request MC-R001 for First 10-yr Interval of Containment Insp Program Per 10CFR50.55a (a)(3)(ii),per 971219 RequestNon-Destructive Examination
Nondestructive Examination
Incorporated by reference
ML20217K72516 April 1998Correction to SE of Relief Request MC-R001 Re Qualification Requirements for non-destructive Exam Personnel Performing Containment Insp
ML20217H8831 April 1998Safety Evaluation Supporting Request for Relief for Third ISI ProgramHydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
ML20217K0471 April 1998Safety Evaluation Authorizing Proposed Alternative in Relief Request NDE-R004 for Plant Third 10-yr ISI Interval,Based on Finding That Compliance W/Code Would Result in Hardship W/O Compensating Increase in Level of Quality & SafetyWeld Overlay
Incorporated by reference
Liquid penetrant
ML20217F88423 March 1998Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Program Plan Requests for Relief for Plant
ML20199J68421 November 1997SER Approving Relief Requests to Second 10-year Inservice Inspection Interval for Duane Arnold Energy CenterVT-2
Incorporated by reference
ML20140F0126 June 1997Safety Evaluation Authorizing Proposed Alternatives Contained in Relief Requests HT-014,NDE-019 & NDE-020Safe Shutdown
Boric Acid
Hydrostatic
VT-2
Incorporated by reference
ML20140A70929 May 1997Safety Evaluation Accepting Relief Requests & Action Item Responses for IST Program for PlantStroke time
Cold shutdown justification
Power-Operated Valves
ML20141E18119 May 1997Safety Evaluation Accepting Proposed EAL Changes for DAEC Consistent W/Guidance in NUMARC/NESP-007Reactor Vessel Water Level
ML20133M29215 January 1997Safety Evaluation of Third Ten Year Interval Inservice Insp Program Plan Request to Use Code N-535 Ies Utilities Inc, Central Iowa Power Cooperative,Corn Belt Power Cooperative, Duane Arnold Energy CenterIncorporated by reference
ML20149L87412 November 1996Safety Evaluation for Ies Utilities of IPE in Response to GL-88-20 & Associated Suppls for License DPR-49Internal Flooding
ML20057D60324 September 1993Safety Evaluation Granting Request for Relief from Certain Exam Requirement of Section XI of ASME Code.Request for Relief RR-001,denied
ML20057C90324 September 1993Safety Evaluation Granting Requested Relief from ASME Code Repair Requirements for Plant D Outboard MSIV
ML20128K52311 February 1993Safety Evaluation Supporting Licensee Response to Staff SE Item Numbers for Pump & Valve IST Program to License DPR-49Stroke time
Incorporated by reference
Scram Discharge Volume
ML20198E31925 November 1992SER Accepting Licensee Response to Suppl 1 to GL-87-02, Committing to Entire GIP-2,including Both SQUG Commitments & Implementation GuidanceSafe Shutdown Earthquake
Earthquake
ML20214N81211 September 1986Safety Evaluation Accepting Mods to Emergency Diesel Generator Load Sequencer Described in .Mods Assure That Loading of ECCS Pump Motors on Emergency Diesel Generators Will Be Sequenced Per Plant Design Basis