Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22271A913 | 28 September 2022 | Alternative Request IR-4-11, Proposed Alternative Request for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces | Boric Acid Locked High Radiation Area Pressure Boundary Leakage |
ML22258A302 | 15 September 2022 | Proposed Request for Alternative Pump Periodic Verification Testing Program for Containment Recirculation Spray System Pumps | |
ML21321A278 | 17 November 2021 | Alternative Request IR-4-09 for Use of an Alternative Brazed Joint Assessment Methodology to Demonstrate Structural Integrity of Class 3 Moderate-Energy Piping | |
ML21084A239 | 24 March 2021 | Proposed Request for Alternative Frequency to Supplemental Valve Position Verification Testing Requirements | Stroke time Incorporated by reference |
ML21014A427 | 14 January 2021 | Supplement to ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Third Period of the Fourth-Year Inspection Interval | |
ML20352A334 | 17 December 2020 | Proposed Alternative Requests RR-05-04 and IR-4-02, Use of Alternative Pressure/Flow Testing Requirements for Service Water System Supply Piping | VT-2 Biofouling Through-Wall Leakage Scaffolding |