 Issue dateTitleTopic
ML24152A15431 May 2024Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-03Offsite Dose Calculation Manual
ML24116A20117 April 2024Nrctva ISFSI CBS (RFI)
ML24045A10013 February 2024NRR E-mail Capture - Request for Additional Information Related to the Sequoyah Exemption Request for the 10 CFR Part 73 Enhanced Weapons RuleTime of Discovery
Contraband
Exemption Request
ML23307A0838 November 2023Enclosure - Request for Additional Information HDI-Sequoyah NDE Exemption Request 10-30-2023Exemption Request
ML23307A0828 November 2023Request for Additional Information August 4, 2022, Exemption Request for Deviating from the Conditions of Certificate of Compliance No. 1032, Amendment No. 3, Related to Sequoyah Nuclear Plant Independent Spent Fuel Storage InstallationExemption Request
ML23202A06519 July 2023NRR E-mail Capture - Request for Additional Information - Brunswick Steam Electric Plant, Units 1 and 2, Torus Liner Inspection Alternative Request (L-2022-LLR-0089)Coatings
Incorporated by reference
Through Wall Leak
ML23142A27322 May 2023Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)Incorporated by reference
ML23062A59527 February 2023Staff follow-up Questions to Tva'S 12/19/2022 Response of the Staff'S Rsi Regarding 08/04/2022 SQN Exemption RequestExemption Request
ML23062A59427 February 2023Enclosure - NRC SQN Exemption Rsi Response Staff Follow Up QuestionsExemption Request
ML23032A24726 January 2023Document Request Letter for Brunswick Upcoming RP Inspection 2023002
ML23018A18917 January 2023Document Request for RP Inspection at Brunswick Inspection Report 2023-01High Radiation Area
ML22343A0698 December 2022NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103)Anticipated operational occurrence
ML22257A06214 September 2022Requalification Program Inspection - Sequoyah Nuclear PlantJob Performance Measure
ML22255A0849 September 2022Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2022-04Offsite Dose Calculation Manual
ML22227A02711 August 2022NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2
ML22214A1582 August 2022NRR E-mail Capture - Request for Additional Information for Sequoyah Units 1 and 2 License Amendment Request for Fire and Seismic PRA Modification to 10 CFR 50.69 (L-2022-LLA-0033)Probabilistic Risk Assessment
ML22192A08612 July 2022RQ Inspection Notification LetterJob Performance Measure
ML22151A01027 May 2022NRR E-mail Capture - Revised Request for Additional Information Re Sequoyah Nuclear Plant Alternative Request RV-02Weak link
ML22151A00926 May 2022NRR E-mail Capture - Request for Additional Information Re Sequoyah Nuclear Plant Alternative Request RV-02Weak link
ML22146A33226 May 2022NRR E-mail Capture - Request for Additional Information Related to Sequoyah Nuclear Plant'S LAR to Adopt TSTF-505Probabilistic Risk Assessment
Large early release frequency
ML22144A10012 May 2022NRR E-mail Capture - Request for Additional Information Related to Tva'S Request to Revised the TVA Plants' Radiological Emergency PlansOperating Basis Earthquake
ML22115A14125 April 2022NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition InformationHealth Physics Network
High winds
ML21354A86115 December 2021NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156)Incorporated by reference
Aging Management
Stress corrosion cracking
ML21277A0951 October 2021NRR E-mail Capture - Request for Additional Information - Brunswick Exemption Request from 10CFR 55.47 License Operator Exam Two-year Waiver LimitExemption Request
Fatigue Rule
ML21239A0658 September 2021Request for Additional Information Regarding Proposed Alternative to ASME Section XI Requirements for Repair - Replacement of Buried Service Water Piping (EPID L-021-LLR-0014) - PublicDesign basis earthquake
ML21237A49525 August 2021Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2021-04
ML21160A0353 June 2021Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2021-03Offsite Dose Calculation Manual
Process Control Program
ML21095A0485 April 2021NRR E-mail Capture - Sequoyah Nuclear Plant, Units 1 and 2 - Request for Additional Information Regarding Request to Transition to Westinghouse FuelAnticipated operational occurrence
ML21092A0972 April 2021Notification of Inspection and Request for Information for NRC Problem Identification and Resolution InspectionProbabilistic Risk Assessment
Operator Manual Action
Maintenance Rule Program
Coronavirus
ML21075A00312 March 2021Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2
ML21049A2634 February 2021NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency PlanFLEX
Siren
ML21019A37713 January 2021002 Radiation Safety Baseline Inspection Information RequestCoronavirus
ML20323A40718 November 2020NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180)Safeguards Contingency Plan
Exemption Request
Pandemic
Coronavirus
COVID-19
Grace period
ML20309A52129 October 2020Request for Additional Information - Brunswick License Amendment Request to Modify Its Approved 10 CFR 50.69, Risk-Informed Categorization and Treatment of SSC Categorization ProcessProbabilistic Risk Assessment
ML20275A2971 October 2020NRR E-mail Capture - Request for Additional Information - Brunswick Request for Alternate Examination of Reactor Vessel Nozzles
ML20259A47815 September 2020Emergency Preparedness Program Inspection Request for Information
ML20261H41714 September 2020NRR E-mail Capture - Sequoyah Nuclear Plant, Units 1 and 2 - Request for Additional Information Regarding Hydrologic UFSAR Update
ML20261H4162 September 2020NRR E-mail Capture - Draft Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, Request to Revise UFSAR Hydrologic Analysis
ML20189A2111 July 2020Request for Additional Information Regarding Hydrologic UFSAR UpdateCommercial Grade Dedication
Commercial Grade
ML20106F10414 April 2020Request for Additional Information Regarding the Hydrologic Analysis LARCommercial Grade Dedication
ML20161A3909 April 2020Request for Supporting Information for the Sequoyah SPRA Audit Review - Follow-up to Plant Response Question 5
ML20098D8617 April 2020Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000327/2020012 and 05000328/2020012) and Request for Information)Safe Shutdown
Fitness for Duty
Exemption Request
Fire Protection Program
ML20036E2845 February 202020200123 - Sequoyah Radiation Safety Inspection Document Request Letter
ML20017A16017 January 2020E-mail Notification of Inspection and Request for Additional InformationNon-Destructive Examination
Nondestructive Examination
Incorporated by reference
Flow Accelerated Corrosion
Liquid penetrant
ML19323D75618 November 2019Nrc'S Request for Additional Information - Exigent Amendment
ML19283C55318 October 2019Redacted - Brunswick Steam Electric Plant, Units 1 and 2 - Request for Additional InformationMinimum Critical Power Ratio
ML19283D0859 October 2019Request for Additional Information - Brunswick Atrium 11 LAR
ML19235A09922 August 2019Emergency Preparedness Program Inspection Request for Information
ML19179A13127 June 2019NRR E-mail Capture - Brunswick RAIs - LAR to Revise TS 5.5.12, Primary Containment Leakage Rate Testing Program for Permanent Extension of Maximum Appendix J Test Intervals (L 2019-LLA-0031)Integrated leak rate test
ML19177A01225 June 2019NRR E-mail Capture - Draft Brunswick RAIs - LAR to Revise TS 5.5.12, Primary Containment Leakage Rate Testing Program for Permanent Extension of Maximum Appendix J Test Intervals (L 2019-LLA-0031)Integrated leak rate test