Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20248F74431 May 1998Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity
ML17353A43431 October 1995Rev 1 to BAW-2245, Initial Rt of Linde 80 Welds Based on Fracture Toughness in Transition Range.
ML20107M89331 October 1995Nonproprietary DPC Fuel Reconstitution Analysis MethodologyAnticipated operational occurrence
Safe Shutdown Earthquake
Earthquake
Fuel cladding
Affidavit
Depleted uranium
ML17264A11831 July 1995Response to Part (1) of GL 92-01,Rev 1,Suppl 1.
ML20064L20031 January 1994Final Rept EPRI TR-103591, Burnup Verification Measurements on Spent-Fuel Assemblies at Oconee Nuclear Station
ML20097G04231 May 1992Analysis of Capsule OCIII-D Duke Power Company Oconee Nuclear Station Unit-3Anticipated operational occurrence
Hydrostatic
Fuel cladding
ML20067A52431 December 1990Final Submittal in Response to NRC Bulletin 88-011, 'Pressurizer Surge Line Thermal Stratification.'Operating Basis Earthquake
Finite Element Analysis
Code Reconciliation
Commercial Grade
Power change
ML19332D53931 October 1989Core Thermal-Hydraulic Methodology Using VIPRE-01.Power change
Affidavit
ML20042F23231 August 1989Nonproprietary DCHF-1 Correlation for Predicting Critical Heat Flux in Mixing Vane Grid Fuel Assemblies.
ML20239A69930 November 1987Addendum 1 to Rev 2 to Integrated Reactor Vessel Matl Surveillance Program (Addendum)
ML20138M42130 September 1985Justification for Raising Setpoint for Reactor Trip on High Pressure, Transient Assessment Program
ML20135A55731 August 1985B&W Owners Group Cavity Dosimetry Program
ML20100F09630 November 1984Abnormal Transient Operating Guidelines (Atog) Comparison of Davis-Besse Unit 1 to Oconee Unit 3
ML20071N92631 May 1983B&W Owners Group Bolting Task Force Summary Rept of Nrc/B&W Owners Group 830506 Meeting on Reactor Vessel Internals BoltingSafe Shutdown
Operating Basis Earthquake
Earthquake
Flow Induced Vibration
ML20062D6171 July 1982Evaluation,Repair & Replacement of Damaged Internal Auxiliary Feedwater Header at Davis Besse 1,Oconee 3 & Rancho Seco
ML19331D74231 August 1980Cycle 6 Reload Rept.Shutdown Margin
ML19276G64724 July 1979Topical Rept DUKE-2,Section 13.1 Re Conduct of OperationsHydrostatic
ML19312C13831 January 1978Cycle 4 Quadrant Flux Tilt.
ML19322B86530 September 1977Analysis of Capsule OCI-E,Reactor Vessel Matls Surveillance Program.Hydrostatic
ML19308B53531 July 1977Analysis of Capsule OC111-A from Duke Power Co:Reactor Vessel Matls Surveillance Program.Anticipated operational occurrence
Hydrostatic
ML19308B55031 May 1977Analysis of Capsule OC111-A from Duke Power Co;Reactor Vessel Matls Surveillance Program.
ML19322C15431 January 1976Irradiation of Two 17x17 Demonstration Assemblies in Cycle 2.
ML19322C13631 March 1974Fuel Densification Rept (Non-Proprietary Version of BAW-1399).Fuel cladding
ML19322B86031 July 1973Fuel Densification Rept, Revision 1 Nonproprietary Version of BAW-1387Fuel cladding
Power change
ML19322B86831 December 1970Analysis & Resolution of Dye-Penetrant Indications in Submerged Arc Weld Cladding of Reactor Coolant Sys Straight Piping.Hot Short
Eddy Current Testing
Liquid penetrant
ML19322B87031 December 1970Analysis & Resolution of Dye-Penetrant Indications in AISI-304 Alloy Cladding of RCS Elbows.Eddy-Current Testing