Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML17265A21318 March 1998Rev 1 to B&W Replacement RSG Internals Degradation Assessment Re NRC GL 97-06.
ML17309A60630 June 1996Non-proprietary Re Ginna Heatup & Cooldown Limit Curves for Normal Operation.Stroke time
Anticipated operational occurrence
Hydrostatic
Pressure and Temperature Limits Report
ML17353A43431 October 1995Rev 1 to BAW-2245, Initial Rt of Linde 80 Welds Based on Fracture Toughness in Transition Range.
ML17264A11831 July 1995Response to Part (1) of GL 92-01,Rev 1,Suppl 1.
ML20085N67031 May 1995Non-Proprietary Probabilistic Risk Analysis of RPS & ESFAS Test Times & Completion TimesProbabilistic Risk Assessment
ML17262A64331 May 1991Nonproprietary Structural Evaluation of Re Ginna Pressurizer Surge Line,Considering Effects of Thermal Stratification.Finite Element Analysis
ML20246H58130 April 1988Nonproprietary Re Ginna Evaluation for Tube Vibration Induced FatigueFinite Element Analysis
Flow Induced Vibration
ML17261A75730 November 1987Nonproprietary Version of LOFTTR2 Analysis of Potential Radiological Consequences Following Steam Generator Tube Rupture at Re Ginna Nuclear Power Plant.Shutdown Margin
ML20137C53531 December 1985Re Ginna Reactor Vessel Fluence & Rt Pressurized Thermal Shock Evaluations
ML20133H84531 July 1985Analysis of Potential Radiological Consequences Following Steam Generator Tube Rupture at Re Ginna Nuclear Power Plant Using LOFTTR1Shutdown Margin
ML20062K42922 July 1982Plant Transient Analysis for Operation of Re Ginna Unit 1 Nuclear Power Plant at Reduced Pressure & TempShutdown Margin
ML20062K45420 July 1982Re Ginna Nuclear Plant Cycle 12 SAR for Low Temp & Pressure
ML20070D00430 April 1982Analysis of Capsule T from Rochester Gas & Electric Corp, Re Ginna Nuclear Plant,Reactor Vessel Radiation Surveillance Program
ML17258A1347 August 1981Analysis & Rept on Safety-Related Electric Penetration for Ginna Plant WX32714.Boric Acid
Thermoset
ML17258A1373 March 1980Nonproprietary Version of Plant Transient Analysis for Re Ginna,Unit 1 Nuclear Power Plant, Suppl 1
ML17250A30929 February 1980Metallurgical Investigation of Cracks in Pressurizer Nozzle-to-Safe-End Weld of Robert Emmett Ginna Nuclear Power Generating Station.Liquid penetrant
ML17249A37031 December 1979Fuel & LOCA Evaluation of Mixed Oxide Fuel Assemblies.
ML17249A37414 December 1979Cycle 10 SAR W/Mixed Oxide Assemblies.Boric Acid
Shutdown Margin
ML17249A3723 July 1979Plant Transient Analysis, Revision 1Boric Acid
Shutdown Margin