NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored21 October 1998Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 RestoredSafe Shutdown
Fire Protection Program
Hourly Fire Watch
NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable30 March 1998Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were InoperableFire Barrier
Fire Protection Program
NPL-97-0831, Special Rept:On 971201,fire Protection Wrap Required for Svc Water Pump Motor Cables Had Been Rendered Inoperable for More than Seven Days.Caused by Planned Repair activity.Once- per-hour Fire Patrol Established23 December 1997Special Rept:On 971201,fire Protection Wrap Required for Svc Water Pump Motor Cables Had Been Rendered Inoperable for More than Seven Days.Caused by Planned Repair activity.Once- per-hour Fire Patrol EstablishedSafe Shutdown
Fire Barrier
Fire Protection Program
Fire Watch
NPL-97-0751, Special Rept:On 971023,low Temp Overpressure Protection Sys Operation Occurred.Caused by Starting Reactor Coolant Pump w/water-solid Reactor Coolant Sys.Operating Personnel Will Be Briefed on Event21 November 1997Special Rept:On 971023,low Temp Overpressure Protection Sys Operation Occurred.Caused by Starting Reactor Coolant Pump w/water-solid Reactor Coolant Sys.Operating Personnel Will Be Briefed on Event
NPL-97-0287, Special Rept:On 970421,fire Door 106A in DG Bldg,Separating Mechanical Equipment Room from Unit 2,B-train,4KV Switchgear Room,Found in Open Position (Closed But Not Latched)21 May 1997Special Rept:On 970421,fire Door 106A in DG Bldg,Separating Mechanical Equipment Room from Unit 2,B-train,4KV Switchgear Room,Found in Open Position (Closed But Not Latched)Safe Shutdown
Fire Barrier
Fire Protection Program
Fire Watch
ML20132E06817 December 1996Ro:On 961114,declared Noble Gas Monitor Inoperable.Caused by Necessary Addl Repairs on Failed Pump & Subsequent re- Testing of Sys.Will Repair P-707A Pump & Perform in-service Test by 961220
ML20080P9593 March 1995Special Rept:On 950207,control Rod H8 in Control Bank B Dropped.Investigation Revealed No Abnormal Conditions. Decision Was Made to Recover Dropped Rod
ML20099B95529 July 1992Ro:Fire Penetration Seal Degraded & Inoperable for More than 7 Days.Caused by Voids in Seal Structure.Hourly Fire Watch Established & Mod to Seal Completed on 920720Fire Barrier
Hourly Fire Watch
ML20195B72726 October 1988Special Rept:On 880831,emergency Diesel Generator Unexpectedly Returned to Full Speed & Voltage Condition. on 880929 & 1012,event Recurred.Exact Cause Not Determined. Addl Testing Planned Over Next 90 Days to Pinpoint CauseCoast down
ML20072U42830 March 1983Ro:On 830308,turbine Trip & Subsequent Reactor Trip Experienced.Caused by Bumping of Main Steam Stop Valve Relay by Contractor Employee While Working on Control Panel. Cleanup Flow Maintained.On 830306,I-131 Limit Exceeded
ML20087L1074 February 1975Telecopy Ro:On 750203,Nuclear Fuel Svcs Spent Fuel Shipping Cask 4B Received & Found in Excess of 22,000 Disintegrations Per Minute 100 Centimeters Squared Removable Contamination on Cask Surface
ML20087L1124 February 1975RO 75-2:on 750224,test of Containment Purge Inlet & Exhaust Valves Closing Time Disclosed That Valves 1CV-3212 & 1CV-3244 Exceeded 3-5 Min Closing Time.Caused by Sticking Pneumatic Relays in Valve Air Operators
ML20087L18824 January 1975Ro:On 741219,discovered That One Insp of Station Batteries Not Completed within Prescribed 30 Day Frequency or within Allowable 25% Grace Period.Caused by Scheduling Difficulty Due to New SupervisorGrace period
ML20087L6336 February 1974Ro:On 740102,during Quarterly Functional Testing of Emergency Diesel Backup Relays 4D,fast Start Backup Relays SFB1 & SFB2 Would Not Perform Intended Function.Caused by Neoprene Bellows in Timing Chamber
ML20085M39529 October 1973Ro:Describing Possible Backseating Disc Mislocation Problem on 2-inch Darling Valves on S-350 Wdd Welding End.Valves Repaired.Valve Stems Will Be Changed During Next Refueling Outage
ML20087L63514 May 1973Ro:On 730303 & 0426,test of Undervoltage Relays of 1A01 & 1A02 Nonsafeguards Bus Undervoltage Relays Disclosed Three Out of Four Malfunctional.Caused by Setting of Shaft in Guide Bearing.Relays Removed & Returned to Vendor for Exam