ML20217E15528 September 1999Comment Supporting Pr 10CFR50 Re Elimination of Requirement for Licensees to Revise ISI & IST Programs Beyond Baseline Edition & Addenda of ASME B&PV Code
ML17313B06530 July 1999Comment on Draft Rg DG-1076, Service Level I,Ii & III Protective Coatings Applied to Npps.Safe Shutdown
Coatings
ML17313B0161 July 1999Comment on Draft Rg DG-1074, SG Tube Integrity.Backfit
ML20196K56329 June 1999Comment Supporting Proposed Rule 10CFR50.55a Re Elimination of 120-month Requirement to Update ASME Code ISI & Inservice Testing ProgramBackfit
ML17313A97920 May 1999Comment Opposing Draft Reg Guide DG-1084, Qualification & Training of Personnel for Nuclear Power Plants. as General Comment,Util Believes That Many of Proposed Changes Will Limit Ability to cross-train Mgt Level Personnel
ML20207D15920 May 1999Comment on Proposed Rules 10CFR21,50 & 54 Re Use of Alternative Source Terms at Operating Reactors
ML20205A42718 March 1999Comment on Petition for Rulemaking PRM-50-64 Which Requested Greater Clarification by NRC Re Possible Financial Obligations of NPP Licensees as Reflected in NRC Final Policy Statement on Restructuring & Economic Deregulation
ML17313A8525 March 1999Comment Supporting Proposed Change to NRC Enforcement Policy.Suggested Rewording of Sections Provided
ML17313A81924 February 1999Comment Supporting Secy 99-007, Recommendation for Reactor Oversight Process Improvements, & Comments Provided by NEI & Regional Utility Group Iv.Offers Comments on NRC Approach to Using Performance Indicators in Assessment Process
ML20198J40311 December 1998Comment Opposing Proposed Rule 10CFR50 Re Requirement for Monitoring Effectiveness of Maint at NPPsProbabilistic Risk Assessment
Large early release frequency
ML20217B9769 April 1998Comment Re Draft RG DG-1029, Guidelines for Evaluating Electromagnetic & Radio-Frequency Interference in Safey-Related Instrumentation & Control SysBackfit
ML20216A9093 April 1998Comment Opposing Proposed Rule 10CFR50.55a Re Industry Codes & Stds
ML17313A33627 March 1998Comment Opposing Proposed GL Re Lab Testing on Nuclear-Grade Activated Charcoal. Believes That Proposed 60 Day Implementation Schedule Would Severely Challenge Resources of Limited Number of Qualified VendorsBackfit
ML20217E87827 March 1998Comment Supporting Proposed GL, Lab Testing of Nuclear- Grade Activated CharcoalBackfit
ML17313A2513 March 1998Comment on Proposed GL 98-XX Re Yr 2000 Readiness of Computer Sys at Npps.
ML20203L55225 February 1998Forwards Comments on Draft Reg Guide DG-5008, Reporting of Safeguards EventsContraband
Stolen
ML20202E42530 January 1998Comment on Draft RG DG-1070, Sampling Plans Used for Dedicating Simple Metallic Commercial Grade Items for Use in Npps. Draft RG Should Be Revised to Clarify That Alloy Analyzer Can Be Used Consistent W/Guidance in EPRI NP-5652
ML20199E08717 January 1998Comment Opposing PRM 50-63A by Pg Crane Re Amending Emergency Planning Regulations to Require Consideration of Prophylactic Use of Potassium Iodide for General Public
ML20202G4461 December 1997Comment on Proposed Final Rule 10CFR50.Licensee Requests That Effective Date Be Delayed from 980101 to 0601,in Order to Provide Enough Time to Request & Obtain NRC Review of Exemption from RuleBackfit
ML20212D13917 October 1997Comment on Pr 10CFR55 Re NUREG-1021,Interim Rev 8, Operator Licensing Exam Stds for Power Reactors
ML17312B42423 April 1997Comment Supporting Draft Rg DG-1068 (Proposed Rev 3 to Rg 1.134, Medical Evaluation of Licensing Personnel at Npps)Fitness for Duty
ML20134J9676 February 1997Comment Supporting Proposed Rule 10CFR50, Draft Policy Statement on Restructuring & Economic Deregulation of Electric Util Industry
ML20133D12016 December 1996Requests Authorization for GE to Conduct narrowly-focused Review of Design Certification Rule for ABWR Before It Is Sent to Ofr & to Urge That Staff Rule Issuance Activities Be Expedited to Max Extent Feasible,All Re 10CFR52Incorporated by reference
ML20134N25214 November 1996Comment on Draft RG DG-1012,proposed Rev 3 to RG 1.8, Qualification & Training of Personnel for Npp
ML20117E3877 August 1996Comment Supporting Proposed Rule 10CFR26 Re Mod to fitness-for-duty Program RequirementsFitness for Duty
ML20116C33325 July 1996Comment Supporting Proposed Rule 10CFR52 Re Draft Final Design Certification Rules for ABWR & Sys 80+ Std DesignsUltimate heat sink
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Incorporated by reference
Exemption Request
Backfit
ML20116C25024 July 1996Comment on Proposed Rule 10CFR52 Re Std Design Certification for Us Advanced BWR & Sys 80+ Std DesignsSafe Shutdown
Incorporated by reference
Backfit
ML20115J67323 July 1996Comment Supporting Pr 10CFR52 Re Design Certification for Sys 80+ Std Plant DesignOperating Basis Earthquake
Incorporated by reference
Earthquake
Backfit
ML20115J68323 July 1996Comment on Supplementary Notice of Proposed Rulemaking for Design Certification of ABWR Under 10CFR52.GE Concerned About Lack of Design Finality Inherent in Identified Draft Rule Provisions
ML20117P12624 June 1996Comment on Proposed Rule 10CFR50, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors. Urges NRC to Approach Rulemaking Re Decommissioning Costs in Manner That Will Facilitate Federal Legislative Solution
ML20113C69824 June 1996Comment Supporting Proposed Rule 10CFR50, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors. Cautions NRC Not to Adopt Rules That Are Too Restrictive & Could Lead to Premature Decommissioning
ML20095A84628 November 1995Comment on Petition for Rulemaking PRM-50-62 Re Proposed Changes to 10CFR50.54.Util Endorses Industry Petition & Response Provided by NEI
ML17311B29327 November 1995Comment Opposing Draft NUREG/CR-6354, Performance Testing of Electronic Personnel Dosimeters.
ML20092B57231 August 1995Comment Supporting Pr 52 60FR17902 Re Standard Design Certification for Us Advanced BWR DesignBackfit
ML17311B16031 August 1995Comment Opposing Review of Revised NRC SALPSystematic Assessment of Licensee Performance
ML20087H72416 August 1995Comment Opposing Proposed Rule 10CFR2 Re Comment on Revision of NRC Enforcement PolicyReactor Vessel Water Level
High Radiation Area
Fire Barrier
Nondestructive Examination
Continuous fire watch
Fire Watch
ML20087H85015 August 1995Comment on Proposed Rule 10CFR52 Re Standard Design Certification for Us ABWR Design & Sys 80+ Design. Supports NEI Comments
L-95-015, Comment Supporting Proposed Rule 10CFR52 Re ABWR Design & Sys 80+ Design15 August 1995Comment Supporting Proposed Rule 10CFR52 Re ABWR Design & Sys 80+ Design
ML20087F81812 August 1995Comment on Proposed Rule 10CFR52 Re Standard Design Certification for Us Advanced Boiling Water Reactor Design. Recommends That Staff Require Use of Armored Electrical Cable in Advanced LWRs
ML20087H83010 August 1995Comment on Proposed 10CFR52 Re Design Certification Rules for Standardized Advanced Reactors.Supports NEI CommentsBackfit
ML20092D29610 August 1995Correction to Comment on Proposed Rule 10CFR52 Re Proposed Design Certification Rules for Standardized Advanced Reactors.Supports NEI CommentsBackfit
ML20092D26910 August 1995Corrected Comment on Proposed Rule 10CFR52 Re Proposed Design Certification Rules for Standardized Advanced Reactors.Supports NEI CommentsBackfit
ML20087H82210 August 1995Comment on Proposed Rule 10CFR52 Re Design Certification Rules for Standardized Advanced Reactors.Supports NEI CommentsBackfit
ML20087C1977 August 1995Comment on Proposed Rule 10CFR52 Re Standard Design Certifications for Us Advanced Boiling Water Reactor & Sys 80+ Designs.Doe Believes That Such Designs Can Significantly Complement Nation Energy StrategyProbabilistic Risk Assessment
Incorporated by reference
Backfit
ML20087C0417 August 1995Comment Supporting Proposed Rule 10CFR52 Re Std Design Certifications for Us Advanced BWR & Sys 80+ DesignsProbabilistic Risk Assessment
Incorporated by reference
Backfit
ML20087F7617 August 1995Comment Opposing Pr 10CFR52 Re Proposed Advanced Reactor Design Certification RulesBackfit
ML20087F8207 August 1995Comment Supporting Proposed Rule 52 Re Standard Design Certification for Us ABWR Design & Standard Design Certification for Sys 80+ Design
ML20087F7957 August 1995Comment Supporting Proposed Rule 10CFR52 Re Standard Design Certification for Us Boiling Water Reactor Design & Standard Designing Certification for Sys 80+ Design
ML20087F9167 August 1995Comment Supporting Proposed Rule 10CFR52 Re Proposed Advanced Reactor Design Certification RulesBackfit
ML20087C7676 August 1995Comment Supporting Pr 10CFR42 Re Std Design Certification for Us Advanced BWR Design & for Sys 80+ Design