Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
DCL-20-043, Thirty-Day Notification Report of Significant Emergency Core Cooling System Evaluation Model Changes That Affect Peak Cladding Temperature and 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Mode20 May 2020Thirty-Day Notification Report of Significant Emergency Core Cooling System Evaluation Model Changes That Affect Peak Cladding Temperature and 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Mode
DCL-18-071, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 201725 September 201810 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2017
DCL-14-101, Core Operating Limits Report for Unit 2 Cycle 1910 November 2014Core Operating Limits Report for Unit 2 Cycle 19Shutdown Margin
Coast down
DCL-13-030, Core Operating Limits Report for Unit 2 Cycle 1827 March 2013Core Operating Limits Report for Unit 2 Cycle 18Shutdown Margin
Coast down
DCL-07-049, Annual Nonradiological Environmental Operating Report26 April 2007Annual Nonradiological Environmental Operating Report
DCL-05-047, Pressure and Temperature Limits Report (PTLR-1), Revision 522 April 2005Pressure and Temperature Limits Report (PTLR-1), Revision 5Stroke time
Hydrostatic
Pressure and Temperature Limits Report
DCL-05-001, Pressure and Temperature Limits Report (Ptlr). Revision 37 January 2005Pressure and Temperature Limits Report (Ptlr). Revision 3Stroke time
Hydrostatic
Pressure and Temperature Limits Report
DCL-02-062, Core Operating Limits Report, Cycle 1217 May 2002Core Operating Limits Report, Cycle 12Shutdown Margin