Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20216J604 | 23 September 1999 | Evaluation of New Surveillance Data on Chemistry Factor for Weld Wire Heat 61782,Point Beach Unit 1 | |
ML20198A901 | 23 November 1998 | Rev 1 to Calculation PBNP-IC-33, 4.16KV Rt UV Matrix Relays Uncertainty/Setpoint Calculation | |
ML20154B810 | 23 September 1998 | Rev 0 to 98-0132, Evaluation of 23.6 EFPY P-T Limit & LTOP Applicability Date & Pressurized Thermal Shock at 32 Efpy | |
ML20248C684 | 30 March 1998 | Rev 1 to 09334281-01, RCS Internal Voltage Decay on Loss of A01/A02 4 Kv Bus | |
ML20140D700 | 1 May 1997 | Delay Times for Containment Spray & Containment Accident Fans for Containment Integrity Accident Analysis (Tscr 192) | Stroke time |
ML20134C249 | 24 January 1997 | Determination of Pbnp LTOP Setpoint Using ASME Code Case N-514 (Applicable Through Appx. Jan 2001) | Hydrostatic |
ML20133L119 | 3 January 1997 | Determination of Pbnp LTOP Setpoint Using ASME Code Case N-514 (Applicable Through Appx Jan 2001) | Hydrostatic |
ML20134D295 | 27 December 1996 | Uncertainty Associated W/Instrumentation Used in IT-14 for Fuel Oil Transfer Pumps | |
ML20134D381 | 27 December 1996 | Uncertainty Associated W/Instrumentation Used in IT-17 & IT-18 for Bat Pumps | Boric Acid Shutdown Margin |
ML20134D394 | 27 December 1996 | Uncertainty Associated W/Instrumentation Use in IT-12 & IT-13 for CCW Pumps | Boric Acid |
ML20134D373 | 20 December 1996 | Uncertainty Associated W/Instrumentation Used in IT-21 & IT-22 for Charging Pumps | Boric Acid Shutdown Margin |
ML20134D331 | 18 December 1996 | Instrument Uncertainty Associated W/Flow Instrumentation Used for IT-15 Chill Water Pumps Inservice Test | |
ML20134D401 | 12 December 1996 | Instrument Uncertainty Associated W/Flow Instrumentation Used for IT-11 SFP Cooling Pump Inservice Test | Boric Acid Stroke time Locked High Radiation Area Power-Operated Valves |
ML20129F819 | 26 September 1996 | Rev 0 to SG Replacement Rept | |
ML20129F843 | 17 September 1996 | Rev 0 to SG Narrow Range Level Instrument Uncertainty & Setpoint Calculation | Safe Shutdown Earthquake Operating Basis Earthquake |
ML20129C089 | 16 September 1996 | Rev 1 to Determination of Pbnp LTOP Setpoint Through an Inside Surface Fluence of 2.05x10 19m/cm (Appx Jan 2001) | |
ML20116G512 | 31 July 1996 | Low & High Pressurizer Pressure Reactor Trip Instrument Uncertainty Calculation | Boric Acid Shutdown Margin Loop seal Non-Destructive Examination Hydrostatic Operating Basis Earthquake Fuel cladding |
ML20116B157 | 19 July 1996 | Svc Water Through Wall Flaw Evaluation | Earthquake Through Wall Leak |
ML20115H324 | 1 July 1996 | Rev 1 to Evaluation of SI-860,SI-857 & RC-515/516 Bonnet Pressurization | Weak link |
ML20115H330 | 8 February 1996 | Rev 0 to Verification of Pressure Locking Analysis Program Preslok | |
ML20086U079 | 20 December 1989 | Pbnp Containment Tendon Prestress Acceptance Limits | |
ML20245J269 | 23 June 1989 | Rev 2 to Calculation AC-601R-2-R38, Evaluation of Pipe Support |