Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20151Y474 | 19 August 1998 | Rev 2 to Calculation C-1302-241-E610-074, Core Spray NPSH Assessment. Page 85 of Incoming Submittal Was Not Included | |
ML20151Y469 | 19 August 1998 | Rev 2 to Calculation C-1302-241-E610-080, Calculation of Torus Pool Temperature as NPSH Input | |
ML20237D580 | 16 July 1998 | Rev 1 to Calculation 083-248-CBS-01, Shroud Finite Element Evaluation | Operating Basis Earthquake B.5.b Mitigating Strategies Earthquake |
ML20237D578 | 10 July 1998 | Rev 0 to Calculation 083-261-BRL-3, Wedge Loads & Shroud Stresses | |
ML20237D576 | 10 July 1998 | Rev 0 to Calculation 083-261-BRL-2, Transient Dynamic Evaluation of Oc Shroud W/Vertical Welds Failed | |
ML20237D573 | 10 July 1998 | Rev 0 to Calculation 083-261-BRL-1, Shroud Stiffness W/ Failed Vertical Welds & Installed Wedges | |
ML20247F183 | 5 May 1998 | Design Calculation for OCNGS ECCS Strainer Modification | Coatings Operator Manual Action Temporary Modification Foreign Material Exclusion |
ML20236H208 | 6 March 1998 | Rev 1 to Calculation 32-5001065-01, TMI-1 P/T Limits | Hydrostatic |
ML20236H264 | 2 March 1998 | Rev 1 to Calculation C1101-221-E520-013, TMI-1 Reactor Vessel Welds Fluence,Rt PTS & Rt NDT Per R.G. 1.99 R-2, Pos. No. 1 | |
ML20137F528 | 12 March 1997 | Extending Calibr Interval of TS Instruments RSCS-11,12,21 & 22 | VT-2 |
ML20117K708 | 9 January 1995 | Rev 0 to V-14-34 & 35 Reactor Pressure for Pressure Locking | |
ML20248D018 | 11 October 1994 | Fragility Evaluation of Fuel Oil Storage Tank, Rev 0 | Probabilistic Risk Assessment |
ML20062G855 | 13 June 1990 | Rev 0 to Calculation C-1302-187-5300-011, Statistical Analysis of Drywell Thickness Data Thru 900424 |