Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IA-20-025, NRC Office of Investigation Report 1-2019-013 and Notice of Violation12 March 2020IA-20-025 NRC Office of Investigation Report 1-2019-013 and Notice of Violation
ML15173A29722 June 2015EA-15-022 Susquehanna Final Significance Determination for a White Finding with Assessment Follow-up and Notice of Violation (Inspection Report No. 05000387/2015504 and 05000388/2015504)Significance Determination Process
Preliminary White Finding
Grace period
IR 05000387/20140091 August 2014IR 05000387-14-009 and 05000388-14-009, and Notice of Violation, June 2-6, 2014 and June 16-20, 2014, Susquehanna Steam Electric Station, NRC Problem Identification and ResolutionUltimate heat sink
Internal Flooding
Enforcement Discretion
Nondestructive Examination
Functionality Assessment
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Maintenance Rule Program
Liquid penetrant
Scaffolding
Operability Assessment
IR 05000387/201301325 September 2013NRC Investigation Reports 1-2012-012, 1-2012-043, 1-2011-030, and NRC Inspection Report 05000387-13-013 & 05000388-13-013; and Notice of ViolationHigh Radiation Area
IR 05000387/201301228 August 2013NRC Inspection Report 05000387/2013012 and 05000388/2013012; and Notice of Violation
ML1200603006 January 2012IA-11-055 G. Rinehart, Notice of Violation (NRC Office of Investigation Report No. 1-2010-055)
PLA-6791, Reply to Notice of Violation, EA-11-244, PLA-67918 December 2011Reply to Notice of Violation, EA-11-244, PLA-6791
IR 05000387/20110048 November 2011IR 05000387-11-004, 05000388-11-004; on 07-01-11 - 9-30-11; Susquehanna Steam Electric Station - NRC Integrated Inspection Report and Notice of ViolationHigh winds
Reactor Vessel Water Level
High Radiation Area
Fire Barrier
Safe Shutdown Earthquake
Enforcement Discretion
Operating Basis Earthquake
Temporary Modification
Functionality Assessment
Missed surveillance
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Reasonable doubt of operability
Earthquake
Opportunity to foresee and correct
Operability Assessment
Unidentified leakage
Power Uprate
IR 05000387/200900428 January 2010EA-09-248, Susquehanna, Notice of Violation (NRC Inspection Report Nos. 05000387/2009004 and 05000388/2009004)