Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IA-20-025, NRC Office of Investigation Report 1-2019-013 and Notice of Violation | 12 March 2020 | IA-20-025 NRC Office of Investigation Report 1-2019-013 and Notice of Violation | |
ML15173A297 | 22 June 2015 | EA-15-022 Susquehanna Final Significance Determination for a White Finding with Assessment Follow-up and Notice of Violation (Inspection Report No. 05000387/2015504 and 05000388/2015504) | Significance Determination Process Preliminary White Finding Grace period |
IR 05000387/2014009 | 1 August 2014 | IR 05000387-14-009 and 05000388-14-009, and Notice of Violation, June 2-6, 2014 and June 16-20, 2014, Susquehanna Steam Electric Station, NRC Problem Identification and Resolution | Ultimate heat sink Internal Flooding Enforcement Discretion Nondestructive Examination Functionality Assessment Condition Adverse to Quality Significance Determination Process Operability Determination Maintenance Rule Program Liquid penetrant Scaffolding Operability Assessment |
IR 05000387/2013013 | 25 September 2013 | NRC Investigation Reports 1-2012-012, 1-2012-043, 1-2011-030, and NRC Inspection Report 05000387-13-013 & 05000388-13-013; and Notice of Violation | High Radiation Area |
IR 05000387/2013012 | 28 August 2013 | NRC Inspection Report 05000387/2013012 and 05000388/2013012; and Notice of Violation | |
ML120060300 | 6 January 2012 | IA-11-055 G. Rinehart, Notice of Violation (NRC Office of Investigation Report No. 1-2010-055) | |
PLA-6791, Reply to Notice of Violation, EA-11-244, PLA-6791 | 8 December 2011 | Reply to Notice of Violation, EA-11-244, PLA-6791 | |
IR 05000387/2011004 | 8 November 2011 | IR 05000387-11-004, 05000388-11-004; on 07-01-11 - 9-30-11; Susquehanna Steam Electric Station - NRC Integrated Inspection Report and Notice of Violation | High winds Reactor Vessel Water Level High Radiation Area Fire Barrier Safe Shutdown Earthquake Enforcement Discretion Operating Basis Earthquake Temporary Modification Functionality Assessment Missed surveillance Significance Determination Process Foreign Material Exclusion Operability Determination Reasonable doubt of operability Earthquake Opportunity to foresee and correct Operability Assessment Unidentified leakage Power Uprate |
IR 05000387/2009004 | 28 January 2010 | EA-09-248, Susquehanna, Notice of Violation (NRC Inspection Report Nos. 05000387/2009004 and 05000388/2009004) |