Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML19296B786 | 31 October 2019 | NUREG/CR-7245 State-of-the-Art Reactor Consequence Analyses (Soarca) Project Sequoyah Integrated Deterministic and Uncertainty Analyses | Loop seal Probabilistic Risk Assessment Finite Element Analysis FLEX Design basis earthquake Severe Accident Management Guideline Earthquake Hardened vent Fuel cladding Coast down |
ML17340B209 | 30 November 2017 | NUREG/CR-7245 State-of-the-Art Reactor Consequence Analyses (Soarca) Project. | Loop seal Probabilistic Risk Assessment Finite Element Analysis FLEX Design basis earthquake Severe Accident Management Guideline Earthquake Hardened vent Fuel cladding Coast down |
ML15259A332 | 30 September 2015 | NUREG-2181, Supplement. 1, Safety Evaluation Report Related to the License Renewal of Sequoyah Nuclear Plant Units 1 and 2 | Aging Management Foreign Material Exclusion License Renewal |
ML15187A206 | 31 July 2015 | NUREG-2181 Safety Evaluation Report Related to the License Renewal of Sequoyah Nuclear Plant Units 1 and 2 Docket Numbers 50-327 and 50-328 Tennessee Valley Authority | |
ML15075A438 | 31 March 2015 | NUREG-1437, Supplement 53 Generic Environmental Impact Statement for License Renewal of Nuclear Plants Sipplement 53 Regarding Sequoyah Nuclear Plant, Units 1 and 2 Final Report | License Renewal |
ML14211A454 | 31 July 2014 | NUREG-1437 Supp 53 Dfc Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Sequoyah Nuclear Plant, Units 1 and 2, (Draft Report for Comment) | License Renewal |
ML13031A501 | 31 January 2013 | NUREG/CR-7154 Vol. 2 Risk Informing Emergency Preparedness Oversight: Evaluation of Emergency Action Levels - a Pilot Study of Peach Bottom, Surry and Sequoyah (Appendices C - F) | Safe Shutdown Fitness for Duty Probabilistic Risk Assessment Significance Determination Process Severe Accident Management Guideline |
ML13031A500 | 31 January 2013 | NUREG/CR-7154 Vol 1 Risk Informing Emergency Preparedness Oversight: Evaluation of Emergency Action Levels - a Pilot Study of Peach Bottom, Surry and Sequoyah (Main Report, Appendices a and B) | Safe Shutdown High winds Ultimate heat sink Probabilistic Risk Assessment Squib Significance Determination Process Design basis earthquake Severe Accident Management Guideline Pressure Boundary Leakage Power change |
ML12340A232 | 4 December 2012 | EAL Study Outreach Message Plan 12/4/2012 Final | Probabilistic Risk Assessment |
ML11339A078 | 13 December 2011 | G20110262/EDATS: OEDO-2011-0269 - Acknowledgment Letter Regarding 2.206 Petition of April 13, 2011 from Paul Gunter to Immediately Suspend OLs of GE BWR Mark I Units | Safe Shutdown Fukushima Dai-Ichi Earthquake Hardened vent |