Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML19296B78631 October 2019NUREG/CR-7245 State-of-the-Art Reactor Consequence Analyses (Soarca) Project Sequoyah Integrated Deterministic and Uncertainty AnalysesLoop seal
Probabilistic Risk Assessment
Finite Element Analysis
FLEX
Design basis earthquake
Severe Accident Management Guideline
Earthquake
Hardened vent
Fuel cladding
Coast down
ML17340B20930 November 2017NUREG/CR-7245 State-of-the-Art Reactor Consequence Analyses (Soarca) Project.Loop seal
Probabilistic Risk Assessment
Finite Element Analysis
FLEX
Design basis earthquake
Severe Accident Management Guideline
Earthquake
Hardened vent
Fuel cladding
Coast down
ML15259A33230 September 2015NUREG-2181, Supplement. 1, Safety Evaluation Report Related to the License Renewal of Sequoyah Nuclear Plant Units 1 and 2Aging Management
Foreign Material Exclusion
License Renewal
ML15187A20631 July 2015NUREG-2181 Safety Evaluation Report Related to the License Renewal of Sequoyah Nuclear Plant Units 1 and 2 Docket Numbers 50-327 and 50-328 Tennessee Valley Authority
ML15075A43831 March 2015NUREG-1437, Supplement 53 Generic Environmental Impact Statement for License Renewal of Nuclear Plants Sipplement 53 Regarding Sequoyah Nuclear Plant, Units 1 and 2 Final ReportLicense Renewal
ML14211A45431 July 2014NUREG-1437 Supp 53 Dfc Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Sequoyah Nuclear Plant, Units 1 and 2, (Draft Report for Comment)License Renewal
ML13031A50131 January 2013NUREG/CR-7154 Vol. 2 Risk Informing Emergency Preparedness Oversight: Evaluation of Emergency Action Levels - a Pilot Study of Peach Bottom, Surry and Sequoyah (Appendices C - F)Safe Shutdown
Fitness for Duty
Probabilistic Risk Assessment
Significance Determination Process
Severe Accident Management Guideline
ML13031A50031 January 2013NUREG/CR-7154 Vol 1 Risk Informing Emergency Preparedness Oversight: Evaluation of Emergency Action Levels - a Pilot Study of Peach Bottom, Surry and Sequoyah (Main Report, Appendices a and B)Safe Shutdown
High winds
Ultimate heat sink
Probabilistic Risk Assessment
Squib
Significance Determination Process
Design basis earthquake
Severe Accident Management Guideline
Pressure Boundary Leakage
Power change
ML12340A2324 December 2012EAL Study Outreach Message Plan 12/4/2012 FinalProbabilistic Risk Assessment
ML11339A07813 December 2011G20110262/EDATS: OEDO-2011-0269 - Acknowledgment Letter Regarding 2.206 Petition of April 13, 2011 from Paul Gunter to Immediately Suspend OLs of GE BWR Mark I UnitsSafe Shutdown
Fukushima Dai-Ichi
Earthquake
Hardened vent