Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML19210D45331 July 2019NUREG-1437, Supplement 10, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 10, Second Renewal for Peach Bottom, Units 2 and 3High winds
Ultimate heat sink
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Zebra Mussel
Incorporated by reference
FLEX
Aging Management
Fukushima Dai-Ichi
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Large early release frequency
MELLLA
Flooding Focused Evaluation
License Renewal
Subsequent License Renewal
Earthquake
Fuel cladding
Biofouling
Fire Protection Program
Environmental Justice
Siren
Power Uprate
Measurement Uncertainty Recapture
ML16133A46131 May 2016NUREG/CR-7155, State-of-the-Art Reactor Consequence Analyses Project. Uncertainty Analysis of the Unmitigated Long-Term Station Blackout of the Peach Bottom Atomic Power Station.Reactor Vessel Water Level
Probabilistic Risk Assessment
Corrosion bonding
Severe Accident Management Guideline
Earthquake
Fuel cladding
Fatality
Siren
Power Uprate
ML13189A14516 July 2013NUREG/CR-7155, State-of-the-Art Reactor Consequence Analyses Project, Uncertainty Analysis of the Unmitigated Long-Term Station Blackout of the Peach Bottom, Draft ReportReactor Vessel Water Level
Probabilistic Risk Assessment
Corrosion bonding
Severe Accident Management Guideline
Earthquake
Fuel cladding
Fatality
Siren
Power Uprate
ML13150A05331 May 2013NUREG/CR-7110 Vol 1 Rev 1 State-of-the-Art Reactor Consequence Analyses Project: Peach Bottom Integrated AnalysisReactor Vessel Water Level
Internal Flooding
Probabilistic Risk Assessment
Squib
B.5.b
Fukushima Dai-Ichi
Integrated leak rate test
Severe Accident Management Guideline
Earthquake
Hardened vent
Fuel cladding
Fatality
Siren
Power Uprate
Overspeed trip
Potassium iodide
ML13031A50131 January 2013NUREG/CR-7154 Vol. 2 Risk Informing Emergency Preparedness Oversight: Evaluation of Emergency Action Levels - a Pilot Study of Peach Bottom, Surry and Sequoyah (Appendices C - F)Safe Shutdown
Fitness for Duty
Probabilistic Risk Assessment
Significance Determination Process
Severe Accident Management Guideline
ML13031A50031 January 2013NUREG/CR-7154 Vol 1 Risk Informing Emergency Preparedness Oversight: Evaluation of Emergency Action Levels - a Pilot Study of Peach Bottom, Surry and Sequoyah (Main Report, Appendices a and B)Safe Shutdown
High winds
Ultimate heat sink
Probabilistic Risk Assessment
Squib
Significance Determination Process
Design basis earthquake
Severe Accident Management Guideline
Pressure Boundary Leakage
Power change
Loss of condenser vacuum
ML11256A02330 September 2011NUREG-1953 Confirmatory Thermal-Hydraulic Analysis to Support Specific Success Criteria in the Standardized Plant Analysis Risk Models - Surry and Peach Bottom.Reactor Vessel Water Level
Mission time
Probabilistic Risk Assessment
Significance Determination Process
Power change
Power Uprate
Measurement Uncertainty Recapture
Subsequent actuation
Manual Operator Action
ML11192A30228 October 2010Preliminary Draft NUREG-1935, Rev. 3, State-of-the-Art Reactor Consequence Analyses (Soarca) Project. Appendix a (Draft), Peach Bottom Integrated Analysis. Part 3 of 3Probabilistic Risk Assessment
B.5.b
Fatality
Siren
ML11192A30128 October 2010Preliminary Draft NUREG-1935, Rev. 3, State-of-the-Art Reactor Consequence Analyses (Soarca) Project. Appendix a (Draft), Peach Bottom Integrated Analysis. Part 2 of 3Earthquake
Fuel cladding
Siren
Potassium iodide
ML11192A30028 October 2010Preliminary Draft NUREG-1935, Rev. 3, State-of-the-Art Reactor Consequence Analyses (Soarca) Project. Appendix a (Draft), Peach Bottom Integrated Analysis. Part 1 of 3Reactor Vessel Water Level
Mission time
Probabilistic Risk Assessment
B.5.b
Design basis earthquake
Severe Accident Management Guideline
Earthquake
Fuel cladding
Potassium iodide
ML12124A07617 December 2009Draft NUREG State-Of-The-Art Reactor Consequence Analyses (Soarca) Project Appendix a Peach Bottom Integrated Analysis, W/Handwritten NotesReactor Vessel Water Level
Mission time
Internal Flooding
Probabilistic Risk Assessment
Design basis earthquake
Severe Accident Management Guideline
Earthquake
Fuel cladding
Potassium iodide