 Issue dateTitleTopic
ML20057E59230 September 1993Auxiliary Feedwater System RISK-BASED Inspection Guidance for the DAVIS-BESSE Nuclear Power Plant
ML20058F86931 October 1990PRESSURE-DEPENDENT Fragilities for Piping Components.Pilot Study on Davis-Besse Nuclear Power StationHydrostatic
Probabilistic Risk Assessment
Earthquake
ML20238A94631 August 1987DAVIS-BESSE Uncertainty StudyLoop seal
ML20206C81230 June 1986Report of the Independent AD HOC Group for the DAVIS-BESSE IncidentProbabilistic Risk Assessment
Systematic Assessment of Licensee Performance
Backfit
ML20206T10430 June 1986Safety Evaluation Report Related to the Restart of DAVIS-BESSE Nuclear Power Station,Unit 1,FOLLOWING the Event of June 9,1985.Docket No. 50-346.(Toledo Edison Company)Boric Acid
High winds
Shutdown Margin
Packing leak
Stroke time
Tornado Missile
Safe Shutdown Earthquake
Post Accident Monitoring
Hydrostatic
Tornado Generated Missile
Systematic Assessment of Licensee Performance
Earthquake
Control of Heavy Loads
Backfit
ML20134A81431 July 1985Loss of Main and Auxiliary Feedwater Event at the DAVIS-BESSE Plant on June 9, 1985Unanalyzed Condition
Stroke time
ML20086N24529 February 1984Review of the DAVIS-BESSE Unit No. 1 Auxiliary Feedwater System Reliability AnalysisTime to boil