Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20057E592 | 30 September 1993 | Auxiliary Feedwater System RISK-BASED Inspection Guidance for the DAVIS-BESSE Nuclear Power Plant | |
ML20058F869 | 31 October 1990 | PRESSURE-DEPENDENT Fragilities for Piping Components.Pilot Study on Davis-Besse Nuclear Power Station | Hydrostatic Probabilistic Risk Assessment Earthquake |
ML20238A946 | 31 August 1987 | DAVIS-BESSE Uncertainty Study | Loop seal |
ML20206C812 | 30 June 1986 | Report of the Independent AD HOC Group for the DAVIS-BESSE Incident | Probabilistic Risk Assessment Systematic Assessment of Licensee Performance Backfit |
ML20206T104 | 30 June 1986 | Safety Evaluation Report Related to the Restart of DAVIS-BESSE Nuclear Power Station,Unit 1,FOLLOWING the Event of June 9,1985.Docket No. 50-346.(Toledo Edison Company) | Boric Acid High winds Shutdown Margin Packing leak Stroke time Tornado Missile Safe Shutdown Earthquake Post Accident Monitoring Hydrostatic Tornado Generated Missile Systematic Assessment of Licensee Performance Earthquake Control of Heavy Loads Backfit |
ML20134A814 | 31 July 1985 | Loss of Main and Auxiliary Feedwater Event at the DAVIS-BESSE Plant on June 9, 1985 | Unanalyzed Condition Stroke time |
ML20086N245 | 29 February 1984 | Review of the DAVIS-BESSE Unit No. 1 Auxiliary Feedwater System Reliability Analysis | Time to boil |