Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
PNO-II-07-004, NRC Resident Inspector - Automatic Reactor Trip/ Plant Shutdown Greater than 72 Hours | 25 April 2007 | PNO-II-07-004 - NRC Resident Inspector - Automatic Reactor Trip/ Plant Shutdown Greater than 72 Hours | |
PNO-II-07-002, NRC - Vogtle Unit 2 Notification of Unusual Event (Noue) Due to Reactor Coolant System (RCS) Leakage in Excess of 10 Gallons Per Minute (Gpm) | 9 March 2007 | PNO-II-07-002 - NRC - Vogtle Unit 2 Notification of Unusual Event (Noue) Due to Reactor Coolant System (RCS) Leakage in Excess of 10 Gallons Per Minute (Gpm) | |
ML070710332 | 9 March 2007 | PNO-II-07-002, Vogtle Unit 2 Notification of Unusual Event (NOUE) Due to Reactor Coolant System (RCS) Leakage in Excess of 10 Gallons Per Minute (Gpm) | |
PNO-II-05-013, A: Update-Vogtle Unit 2 Shutdown to Repair Residual Heat Removal Pipe Leak | 19 December 2005 | PNO-II-05-013A: Update-Vogtle Unit 2 Shutdown to Repair Residual Heat Removal Pipe Leak | |
PNO-II-05-002, Vogtle Unit 2, Shutdown to Repair Condenser Tube(S) Leak | 24 May 2005 | PNO-II-05-002: Vogtle Unit 2, Shutdown to Repair Condenser Tube(S) Leak | |
PNO-II-03-017, Shutdown to Investigate & Repair Reactor Vessel Head Leak | 2 September 2003 | PNO-II-03-017 - Shutdown to Investigate & Repair Reactor Vessel Head Leak | |
PNO-II-03-014, Vogtle Unit 2 Shutdown to Investigate and Repair Mechanical Seal Leak on Reactor Vessel Head | 8 August 2003 | PNO-II-03-014: Vogtle Unit 2 Shutdown to Investigate and Repair Mechanical Seal Leak on Reactor Vessel Head |