PNO-II-05-013A: Update-Vogtle Unit 2 Shutdown to Repair Residual Heat Removal Pipe Leak
ML053530378
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 12/19/2005
From:
NRC/RGN-II
To:
References
PNO-II-05-013A
Download: ML053530378 (1)


December 19, 2005 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE PNO-II-05-013A This preliminary notification constitutes EARLY notice of events of possible safety or public interest significance. The information is as initially received without verification or evaluation, and is basically all that is known by Region II staff (Atlanta, Georgia) on this date.

Facility Licensee Emergency Classification Southern Nuclear Operating Company, Inc. Notification of Unusual Event Vogtle Electric Generating Plant, Unit 2 Alert Waynesboro, Georgia Site Area Emergency Dockets/License: 50-425/NPF-81 General Emergency X Not Applicable

Subject:

UPDATE-VOGTLE UNIT 2 SHUTDOWN TO REPAIR RESIDUAL HEAT REMOVAL PIPE LEAK On December 16, 2005, the residual heat removal bypass line was satisfactorily repaired per ASME code repair requirements. The licensee determined the failure was due to a defect in the root pass of the weld.

The licensee examined 11 other welds on the residual heat removal bypass lines and determined they were acceptable.

The unit was restarted on December 18, 2005, and is currently at 25 percent rated thermal power.

Region II received this information verbally from the Licensee. This information presented herein is current as of 10:00 a.m., EST, December 19, 2005.

CONTACT: Malcolm Widmann 404-562-4550 Gerald McCoy 706-554-9901