Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217A099 | 5 November 1990 | Notice of Deviation from Insp on 900822-1001.Deviation Noted:Direct Dosimetry Measurements Not Used to Establish Accurate Record of Cumulative Gamma Exposure to Spent Fuel Pool Boraflex Coupons | |
ML20154R531 | 27 May 1988 | Notice of Deviation from Insp on 880322-0502.Deviation Noted:Calibr Procedure SP-2404BA, Control Room Ventilation Monitor Calibr Used for Calibrs in Dec 1986,did Not Assure Reproducible,Fixed Geometry Configuraton | |
ML20237H897 | 18 August 1987 | Notice of Deviation from Insp on 870608-25.Deviation Noted: safety-related Wall in Battery Room Evaluated Per Analysis Procedure for Masonry Block Walls Which Permitted Increase of Allowable Stresses Above That Specified in ACI 531-79 | Safe Shutdown Earthquake Operating Basis Earthquake |