Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
05000458/LER-2017-009 | 13 November 2017 | Potential Loss of Safety Function of Secondary Containment due to Unsecured Personnel Door LER 17-009-00 for River Bend, Unit 1 Regarding Potential Loss of Safety Function of Secondary Containment due to Unsecured Personnel Door | |
05000483/LER-2017-001 | 15 August 2017 | Violation of Technical Specification 3.7.9 Due to Ultimate Heat Sink (UHS) Cooling Tower Train Inoperability LER 17-001-00 for Callaway, Unit 1, Regarding Violation of Technical Specification 3.7.9 Due to Ultimate Heat Sink (UHS) Cooling Tower Train Inoperability | Safe Shutdown Ultimate heat sink Mission time GOTHIC Manual Operator Action |
05000286/LER-2017-002 | 9 August 2017 | Manual Isolation of Chemical and Volume Control System Normal Letdown to Stop a Valve Leak Resulted in an Exceedance of Technical Specification 3.4.9 Condition A Limit for Pressurizer Level LER 17-002-00 for Indian Point, Unit 3 re Manual Isolation of Chemical and Volume Control System Normal letdown to Stop a Valve Leak Resulted in an Exceedance of Technical Specification 3.4.9 Condition A Limit for Pressurizer Level | Safe Shutdown |
05000336/LER-2016-001 | 27 June 2016 | Turbine Driven Auxiliary Feedwater Putnp Room HELB Door Left Open LER 16-001-00 for Millstone Power Station Unit 2 RE: Turbine Driven Auxiliary Feedwater Pump Room HELB Door Left Open | High Energy Line Break |
05000423/LER-2016-003 | 8 June 2016 | Loss of Safety Function- Supplementary Leak Collection and Release System LER 16-003-00 for Millstone Power Station, Unit 3, Regarding Loss of Safety Function-Supplementary Leak Collection and Release System |