Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23178A070 | 6 July 2023 | Request for Withholding Info from Public Disclosure - Vogtle 3 and 4 Updated Final Safety Analysis Report, Tier 1, Tech Requirements Manual and Tech Specs Bases Annual Submittal | |
ML22308A204 | 18 November 2022 | Supplemental Information Needed for Acceptance of Requested Licensing Action TS Revision to Adopt WCAP-17661-P-A, Improved RAOC & CAOC Fq Surveillance TS (EPIDs L-2022-LLA-0148 & L-2022-LLA-0149) | |
ML22011A275 | 11 January 2022 | Assessment Follow-Up Letter for Inspection Report 05200025/2021011 | |
ML12235A469 | 22 August 2012 | Registration of NUHOMS-32PT Casks, WNHOMS-32-037, WNHOMS-32-038, WNHOMS-32-039 | |
ML12200A106 | 26 July 2012 | Status of 90-Day Response to Request for Information Regarding Recommendation 9.3 of Near-Term Task Force Related to the Fukushima Dai-ichi Nuclear Power Plant Accident | Fukushima Dai-Ichi |
ML110480403 | 17 February 2011 | Edwin I. Hatch, Units 1 and 2, and Vogtle, Units 1 and 2, Comments on Draft NRC Regulatory Issue Summary 2011-xx, Adequacy of Station Electric Distribution System Voltages. | Backfit |
NL-11-0298, Joseph M. Farley, Units 1 and 2, Edwin I. Hatch, Units 1 and 2, and Vogtle, Units 1 and 2, Comments on Draft NRC Regulatory Issue Summary 2011-xx, Adequacy of Station Electric Distribution System Voltages. | 17 February 2011 | Joseph M. Farley, Units 1 and 2, Edwin I. Hatch, Units 1 and 2, and Vogtle, Units 1 and 2, Comments on Draft NRC Regulatory Issue Summary 2011-xx, Adequacy of Station Electric Distribution System Voltages. | Backfit |
IR 05000026/2009403 | 29 October 2009 | IR 0500026-09-403, (Drs), IR 05000301-09-403, (Drs), on 09/14/2009 - 09/23/2009, Point Beach Nuclear Plant, Units 1 and 2, Routine Security Baseline Inspection - Cover Letter | |
IR 05000026/2008001 | 3 March 2008 | Annual Assessment Letter - Oconee 2007 End-of-Cycle Letter (IR 0500026-08-001, 05000270-08-001, & 05000287-08-001) | B.5.b Significance Determination Process Foreign Material Exclusion B.5.b Mitigating Strategies |