Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML24019A11214 December 2023Affidavit by Alan B. Meginnis for Presentation Slide Deck Entitled, Modification of Browns Ferry TS to Eliminate LCO 3.3.2.1 Actions C.2.1.1 and C.2.1.2 for Rod Worth Minimizer Inoperable During Reactor Startup, Dated December 2023Affidavit
ML24019A17214 December 2023Affidavit by Alan B. Meginnis for ANP-3874P, Revision 2, Browns Ferry Atrium 11 Control Rod Drop Accident Analysis with the AURORA-B CRDA Methodology, Dated March 2021Affidavit
CNL-22-100, to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3,in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535)9 December 2022to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3,in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535)Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Abnormal operational transient
Feedwater Controller Failure
MELLLA
CNL-22-096, to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3, in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535)29 September 2022to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3, in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535)
CNL-22-056, Supplement to License Amendment Request Regarding Criticality Safety Analysis of Spent Fuel Pool Storage of Atrium 11 Fuel (TS-534)28 April 2022Supplement to License Amendment Request Regarding Criticality Safety Analysis of Spent Fuel Pool Storage of Atrium 11 Fuel (TS-534)Aging Management
CNL-21-061, Information Transmittal for NRC Confirmatory Calculations Regarding Transition to Atrium 11 Fuel6 August 2021Information Transmittal for NRC Confirmatory Calculations Regarding Transition to Atrium 11 Fuel
CNL-21-053, Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2, in Support of Atrium 11 Fuel Use (TS-535)23 July 2021Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2, in Support of Atrium 11 Fuel Use (TS-535)
CNL-19-125, Proposed Technical Specifications (TS) Change 510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 12, Additional License Condition19 December 2019Proposed Technical Specifications (TS) Change 510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 12, Additional License Condition
CNL-19-117, Extended Power Uprate - Units 1 and 2 Replacement Steam Dryer Final Load Definition and Stress Reports - Supplemental Information12 December 2019Extended Power Uprate - Units 1 and 2 Replacement Steam Dryer Final Load Definition and Stress Reports - Supplemental Information
CNL-19-076, Extended Power Uprate: Unit 1 Replacement Steam Dryer Final Load Definition and Stress Report, Revision 110 October 2019Extended Power Uprate: Unit 1 Replacement Steam Dryer Final Load Definition and Stress Report, Revision 1
CNL-19-075, Extended Power Uprate - Unit 2 Replacement Steam Dryer Final Load Definition and Stress Report19 September 2019Extended Power Uprate - Unit 2 Replacement Steam Dryer Final Load Definition and Stress Report
CNL-19-042, Extended Power Uprate - Replacement Steam Dryer Final Load Definition and Stress Report29 April 2019Extended Power Uprate - Replacement Steam Dryer Final Load Definition and Stress Report
CNL-19-045, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 9, Additional Information Regarding Anticipate Transient Without Scram with ...24 April 2019Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 9, Additional Information Regarding Anticipate Transient Without Scram with ...
CNL-19-028, Replacement Steam Dryer Revised Analysis and Limit Curves Report, Supplement 114 February 2019Replacement Steam Dryer Revised Analysis and Limit Curves Report, Supplement 1
CNL-19-017, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 7, Response to Requests for Additional Information25 January 2019Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 7, Response to Requests for Additional Information
CNL-19-006, Extended Power Uprate - Replacement Steam Dryer Final Load Definition and Stress Reports - Supplemental Information2 January 2019Extended Power Uprate - Replacement Steam Dryer Final Load Definition and Stress Reports - Supplemental Information
CNL-18-141, Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report - Supplemental Information14 December 2018Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report - Supplemental Information
CNL-18-140, Response to Request for Additional Information Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 413 December 2018Response to Request for Additional Information Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 4
CNL-18-131, Extended Power - Uprate Replacement Steam Dryer Core Flow Sweep Report - Supplemental Information15 November 2018Extended Power - Uprate Replacement Steam Dryer Core Flow Sweep Report - Supplemental Information
CNL-18-124, Extended Power Uprate - Replacement Steam Dryer Final Load Definition and Stress Reports24 October 2018Extended Power Uprate - Replacement Steam Dryer Final Load Definition and Stress Reports
CNL-18-125, Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report24 October 2018Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report
CNL-18-103, Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ0000002016000041,.6 September 2018Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ0000002016000041,.
CNL-18-106, Extended Power Uprate Replacement Steam Dryer Core Flow Sweep Test Report13 August 2018Extended Power Uprate Replacement Steam Dryer Core Flow Sweep Test Report
CNL-18-081, Request for Review and Approval of Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ0000002016000041, Revision 122 June 2018Request for Review and Approval of Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ0000002016000041, Revision 1
CNL-18-042, Proposed Technical Specifications Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus, Supplement 17 March 2018Proposed Technical Specifications Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus, Supplement 1Anticipated operational occurrence
Minimum Critical Power Ratio
CNL-16-145, Revised Responses to Requests for Additional Information Regarding Proposed Technical Specifications Change TS-505 - Extended Power Uprate - Supplement 3023 September 2016Revised Responses to Requests for Additional Information Regarding Proposed Technical Specifications Change TS-505 - Extended Power Uprate - Supplement 30Finite Element Analysis
CNL-16-056, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 9, Responses to Requests for Additional Information4 April 2016Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 9, Responses to Requests for Additional InformationShutdown Margin
Anticipated operational occurrence
Feedwater Controller Failure
MELLLA
Fuel cladding
Power change
CNL-15-247, Brown Ferry Unit 1, Submittal of Response to NRC Request for Additional Information Re Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506). Enclosure 2 ANP-3458NP Enclose28 December 2015Brown Ferry Unit 1, Submittal of Response to NRC Request for Additional Information Re Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506). Enclosure 2 ANP-3458NP EnclosedMinimum Critical Power Ratio
CNL-15-250, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 2, MICROBURN-B2 Information, Including Enclosures 2, 4, 6, and 715 December 2015Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 2, MICROBURN-B2 Information, Including Enclosures 2, 4, 6, and 7
CNL-15-249, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 1, Spent Fuel Pool Criticality Safety Analysis Information15 December 2015Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 1, Spent Fuel Pool Criticality Safety Analysis InformationAging Management
ML15282A25817 September 2015General Electric Hitachi Affidavits
NL-15-169, Browns Ferry, Units 1, 2, and 3, General Electric Hitachi Affidavits17 September 2015Browns Ferry, Units 1, 2, and 3, General Electric Hitachi Affidavits
CNL-15-169, Electric Power Research Institute Affidavit14 September 2015Electric Power Research Institute Affidavit
ML15282A25912 August 2015Areva Affidavits
NL-15-169, Browns Ferry, Units 1, 2, and 3, Areva Affidavits12 August 2015Browns Ferry, Units 1, 2, and 3, Areva Affidavits
CNL-15-103, Enclosure 2, ANP-3414NP Revision 0, Areva RAI Responses for Browns Ferry, Unit 3, Cycle 18 MCPR Safety Limits (Non-proprietary), and Enclosure 3, Affidavit7 July 2015Enclosure 2, ANP-3414NP Revision 0, Areva RAI Responses for Browns Ferry, Unit 3, Cycle 18 MCPR Safety Limits (Non-proprietary), and Enclosure 3, AffidavitMinimum Critical Power Ratio
CNL-15-085, Response to NRC Request for Additional Information Regarding Proposed Technical Specification Change to Modify Technical Proposed Technical Specification Change to Modify Technical3 June 2015Response to NRC Request for Additional Information Regarding Proposed Technical Specification Change to Modify Technical Proposed Technical Specification Change to Modify TechnicalStroke time
Fuel cladding
ML14204A70923 July 2014Enclosure 3, Affidavit of Peter M. Yandow
ML13276A06330 September 2013Response to Request for Additional Information on Technical Specification Change TS-478Shutdown Margin
Incorporated by reference
Minimum Critical Power Ratio
ML11270006826 September 2011Enclosure 3, Mfn 10-245 R4, AffidavitChannel-control blade interference
ML1121500968 June 2011Appeal of Final Significance Determination of a Red Finding and Reply to a Notice of Violation; EA-11-018Safe Shutdown
Stroke time
Enforcement Discretion
Significance Determination Process
Flow Induced Vibration
ML10116029916 April 2010Affidavit of Alan B. Meginnis Regarding Supplemental Information for Technical Specification Change TS-473 - Areva Fuel Transition Amendment Request
ML0902203948 January 2009Response to Round 23 RAI Technical Specifications Changes TS-431 and TS-418, Extended Power Uprate, Enclosure 2 - Structural Integrity Associates, Inc. Calculation Package 0006982.304, Revision 1 and Encls 4 and 5Finite Element Analysis
ML0807104986 March 2008(BFN) - Units 1, 2, and 3 - Technical Specifications (TS) Change TS-418 and TS-431 - Extended Power Uprate (EPU) - Response to Round 16 Request for Additional Information (RAI) - SRXB-74/86 and SRXB-87 Through SRXB-90Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Power change
ML07213037127 July 2007Technical Specifications Changes TS-431 and TS-418, Extended Power Uprate - Steam Dryer EvaluationsFlow Induced Vibration
ML06217000421 August 2006Proprietary Letter, Request for Withholding Information on EPU Round 3 (TS-431)
ML0619506706 July 2006Technical Specifications (TS) Change TS-431 - Extended Power Uprate (EPU) - Response to NRC Round 6 Request for Additional Information on GE MethodsShutdown Margin
Incorporated by reference
MELLLA
ML0613004365 May 2006Transmittal of Browns Ferry, Units 1, 2 & 3 - Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Steam Dryer Stress Report
ML05200032814 July 2005Surveillance Program for Channel-Control Blade InterferenceChannel-control blade interference
ML0517201311 July 2005Enclosure, Framatone Non-Propreitary PresentationSafe Shutdown
Shutdown Margin
Anticipated operational occurrence
Feedwater Controller Failure